Drilling Recommences at Overland Project
Released
Released
Announcement PDF
28 July 2025
Drilling resumes at Overland Uranium Project
testing dual uranium models
Highlights:
•
Rapid testing of newly acquired target area 1: Prioritising confirmatory follow up of
historic (1981) drilling that revealed gamma anomalism from surface to 30m depth
along ~7km strike.
•
Roll-front signature follow-up: Targeting ISR-amenable uranium target in EL7001,
following the identification of a roll-front gamma signature in oxidised permeable
sands during drill program completed in May 2025 2.
•
Systematic testing of targets: Initial follow-up of surficial calcrete and roll-front
targets, followed by systematic testing of high-priority targets across the extensive
~7,700km2 tenure position.
•
Engage with this announcement at the AR3 investor hub.
AR3 Managing Director and CEO, Travis Beinke, commented:
"We are excited to resume drilling at our Overland Uranium Project. The immediate focus
is on following up our previously identified high-priority roll-front target alongside the
rapid testing of our expanded tenure position where we have identified the potential for
widespread near surface calcrete hosted uranium mineralisation.
As recently announced1, we have an intriguing new target area to test, uncovered by our
team through a systematic review of historical drilling data dating back to 1981. It’s a
walk-up drill target with significant gamma anomalism from surface over 7km of strike.
It’s great to be out in the field with the drill rig turning and we look forward to updating
shareholders as the program progresses."
Australian Rare Earths Limited (ASX: AR3) confirms the recommencement of drilling
activities at its Overland Uranium Project in South Australia, building on significant
progress from earlier in 2025.
ASX release 10 July 2025 “Strategic addition to AR3’s Overland Project with uranium potential from
surface”.
2
ASX release 26 May 2025 “Overland Project drilling identifies roll front uranium signature”.
1
Drilling results announced in May 20252 point to the potential for In-Situ Recovery (ISR)
amenable sedimentary hosted uranium targets at Overland, and in particular, along the
western margin of the previously defined palaeovalley setting on EL7001. The majority of
AR3’s drilling on EL7001 remains relatively wide spaced, at 800m centres, providing
plenty of room for additional drilling to uncover significant sedimentary hosted uranium
mineralisation.
The recent acquisition of EL68951, followed AR3’s review of historic drilling and gamma
logging conducted by CRA in 1981, and has uncovered drillholes on EL6895 with
indications of significant gamma anomalism from surface with no follow-up exploration
undertaken in the intervening years.
The current drilling program is expected to run from July to October 2025 with the initial
follow-up of surficial calcrete and roll-front targets, followed by systematic testing of
high-priority targets across the extensive tenure position. AR3’s total project area now
encompasses approximately 7,700km2 of land in a frontier uranium play in South
Australia’s Murray Basin (Figure 2).
Figure 1: Air Core drilling at EL6895.
Figure 2: Overland Project area and new EL6895.
Next steps
• Assay Results: Laboratory analysis of recent drilling samples elsewhere in
Overland is underway, with results expected to be available over the coming
months.
• Data Analysis: AR3 continues to compile and interpret all existing geological and
geophysical data.
• Geophysical Surveys: AR3 is developing remote sensing techniques to better
define prospective paleochannel targets, particularly in EL7001 where existing
drill density will help validate any geophysical techniques applied.
The announcement has been authorised for release by the Board of Australian Rare Earths Limited.
For further information please contact:
Australian Rare Earths Limited
Travis Beinke
Managing Director and CEO
T: 1 300 646 100
Media Enquiries
Jessica Fertig
Tau Media
E: info@taumedia.com.au
Engage and Contribute at the AR3 investor hub: https://investorhub.ar3.com.au/
Competent Person’s Statement
The information in this report that relates to Exploration results is based on information compiled by Australian Rare Earths
Limited and reviewed by Mr Rick Pobjoy who is the Chief Technical Officer of the Company and a member of the Australian
Institute of Mining and Metallurgy (AusIMM). Mr Pobjoy has sufficient experience that is relevant to the style of mineralisation,
the type of deposit under consideration and to the activities undertaken to qualify as a Competent person as defined in the
2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Pobjoy
consents to the inclusion in this report of the matters based on this information in the form and context in which it appears.
About Australian Rare Earths Limited
Australian Rare Earths (AR3) is an emerging diversified critical minerals company, strategically positioned to meet the growing
global demand for uranium and rare earth elements. The Company’s vast ~7,700 km² Overland Uranium Project in South
Australia shows strong uranium discovery potential, with initial drilling identifying opportunities for substantial near-surface
and deeper deposits.
Simultaneously, AR3's Koppamurra Rare Earths Project in South Australia and Victoria has secured important government
support through a $5 million grant to accelerate development. With support from global advanced industrial materials
manufacturer, Neo Performance Materials, AR3 is progressing toward a Pre-Feasibility Study and a demonstration facility,
solidifying its role in diversifying global rare earth supply chains for the clean energy transition. With strategic projects and
strong government support, AR3 is poised for significant growth in the critical minerals market.
Share your feedback
Discover