Bulk leach program delivers strong rare
earth recoveries at Koppamurra
Highlights:
•
Strong recoveries of the key magnet light and heavy Rare Earths at scale: Bulk leach
testing (~3 tonne) delivered magnet rare earth (MRE) recoveries of >60%, reinforcing the
scalability of the progressive heap leach approach.
•
Rapid Leach time achieved: Recoveries were delivered in significantly shorter timeframes
compared to traditional heap leaching methods.
•
Opportunities for further recovery optimisation identified: Opportunities for increased
recoveries through reprocessing of lower grade rare earth solution, (‘tail’ solution), currently
under investigation.
•
Ongoing optimisation workstreams: Reagent usage, water recycling, impurity removal and
rare earth precipitation testwork continues to enhance rare earth recoveries, process
efficiency and environmental outcomes.
•
Advancing Pre-Feasibility Study: Testwork results will inform key project design inputs for
the Koppamurra Pre-Feasibility Study (PFS), targeted for completion in 2025.
•
Government Co-Funding Grant: Testwork program is co-funded under the $5 million Australian
Government grant from the International Partnerships in Critical Minerals Program.
•
Strategic importance for critical minerals supply: Koppamurra is advancing as a strategic
and secure source of both light and heavy rare earths, contributing to diversified supply
chains vital to the world’s energy transition.
•
Engage with this announcement at the AR3 investor hub.
AR3 Managing Director and CEO, Travis Beinke, said:
“Following encouraging initial recovery results from the lab scale column leach testwork, we have
now demonstrated results at the significantly larger scale of ~3 tonne bulk leach. The recovery
results of >60% were achieved in significantly shorter periods compared to traditional heap
leaching and provide us further confidence in this development approach. This method also
reinforces the potential of lower initial capital and operating costs compared to traditional tank
leach approaches that other ionic clay projects are pursuing.
We are pleased with the initial bulk leach results and are eager to continue the optimisation
testwork to ensure we maximise magnet rare earth recoveries in the most cost efficient way.
Given the growing uncertainty driven by the ongoing tariff war and China’s export controls on
Dysprosium and Terbium, the strategic importance of ionic clay-hosted rare earths projects like
Koppamurra to Australia’s national interests has become increasingly evident. We remain
committed to advancing the project as customers seek to secure diversified and reliable supply
of rare earths."
Australian Rare Earths Limited (ASX:AR3, or “Company”) is pleased to announce progress in the
metallurgical testwork for its Koppamurra rare earths project in South Australia. The current
phase of metallurgical testwork, a ~3 tonne bulk heap leach campaign, has been completed at
Brisbane Met Labs (BML). The program has been designed to:
•
•
•
De-risk scale up,
Further optimise the progressive heap leach and rapid rehabilitation development
approach, and;
Inform design aspects for the completion of the PFS, as AR3 seeks to maximise the
project’s value.
Samples from the Koppamurra Bulk Sample Pit were collected and blended prior to being
agglomerated with sulphuric acid and being placed into three 1 tonne testing containers (“cribs”).
Irrigation solution, at pH 2.2, was applied through drippers for 33 days with samples collected
every 12 hours, to measure the rate of rare earth extraction. The testwork duration was designed
to allow for time beyond what is expected for full scale operation, to ensure that the variables
(such as dripper spacing) and the operating window was explored.
Operating Conditions:
•
•
•
•
Ore Characteristics - ~3 tonne of ore from the 2022 Bulk Sample Pit operations grading
1393ppm TREO consisting of ~27% Magnet Rare Earths (~24% NdPr and ~3% DyTb)
Acid added in Agglomeration – A sulphuric acid addition rate of 39 kg/t H2SO4 in the ore
agglomeration was applied.
Irrigation solution pH – A low strength magnesium sulphate irrigation solution pH of 2.2
was applied to the ore into the first of the three in-series cribs.
Irrigation rate – 5L/m2/h
Results
Heap leach testwork conducted at the Australian Nuclear Science and Technology Organisation
(ANSTO) since December 2023 has consistently confirmed the suitability of Koppamurra ore for
agglomeration and heap leaching, showing uniform physical properties and robust metallurgical
recoveries using a progressive heap leach approach (refer to ASX Releases: 2 April 2024 and 8
July 2024).
To demonstrate scalability, AR3 conducted two tests. First, a small-scale column leach trial (test
“C11”) using a sample from the Koppamurra Bulk Sample Pit, was completed at ANSTO,
employing the same equipment and processes, including agglomeration, as previous column
tests (ASX Releases: 2 April 2024 and 8 July 2024). Second, a larger-scale test processing
approximately 3 tonnes of similar ore as tested in C11, validated the scalability, achieving rare
earth recoveries consistent with the C11 column leach results (see Figure 1). These tests confirm
a well-understood scale-up from small-scale to bulk processing.
Figure 1: Recovery of Individual Magnet Rare Earth metals in small scale column leach compared to the Bulk Leach
The bulk test, utilising 3,000 kg of Koppamurra ore, followed the same protocols as the smallscale column leach trial (test C11) but extended the duration from 19 to 33 days to further explore
recovery potential (see Table 1 for comparison). The bulk test delivered high recoveries for all four
targeted magnet rare earth metals, closely aligning with C11 test results up to day 19 and
maintaining effective leaching through the trial’s completion, as illustrated in Figure 1. Variations
in dripper density spacing were introduced, which prolonged the recovery timeline compared to
an optimal dripper configuration. This effect is evident in the bulk test recovery curves shown in
Figure 1.
Figure 2: Bulk sample being prepared for Bulk Leach test at BML
Figure 3: Bulk Leach with dripper system applying lixiviant for leaching
The results validate AR3’s confidence in using cost-effective, small-scale laboratory tests to
optimise the heap leaching process. The bulk test also significantly de-risk scaleup to full
production, reinforcing the viability of AR3’s innovative, low-cost method. The findings provide a
strong foundation for the ongoing Pre-Feasibility Study (PFS), positioning AR3 for success in
delivering sustainable rare earth production.
Table 1: Comparison of results of small scale test column vs the Bulk Leach
Extraction
C11
Bulk
Nd
(%)
50%
63%
Pr
(%)
53%
65%
Dy
(%)
55%
60%
Tb
(%)
54%
63%
MRE
(%)
51%
63%
Target
Feed pH
2.2
2.2
Acid
addition
(kg/t)
44
43
Irrigation
duration
(days)
19
33
Head
Grade
TREO1
ppm
1566
1393
1. TREO = La2O3, CeO2, Pr6O11, Nd2O3, Sm2O3, Eu2O3, Gd2O3, Tb4O7, Dy2O3, Ho2O3, Er2O3, Tm2O3, Yb2O3, Lu2O3, Y2O3
Table 2: Bulk Leach rare earth elemental recoveries
Head Grade (ppm)
Bulk Leach Recovery (%)
Head Grade (ppm)
Bulk Leach Recovery (%)
Ce
358
70
Sc
24
10
Dy
34
60
Sm
44
63
Er
18
60
Tb
5.9
63
Eu
10
62
Tm
2.3
57
Gd
42
64
Y
166
63
Ho
6.6
59
Yb
14
55
La
174
73
LRE1
814
68
Lu
1.8
56
HRE2
345
62
Nd
229
63
Pr
53
65
Magnets3
TREO 4
322
63
1393
66
1. LRE = Ce, La, Pr, Nd
2. HRE = Sm, Eu, Gd, Tb, Dy, Ho, Er, Tm, Yb, Lu, Y
3. Magnets = Nd, Pr, Dy, Tb
Optimisation opportunities
The rare earth recoveries in solution identified during the bulk heap leach trial, were completed
within only 33 days of heap leaching – a much greater rate of recovery than conventional heap
leaching and confirming a pathway for the application of rapid temporary heap leaching and
rehabilitation at Koppamurra. The AR3 team are currently analysing the results to determine the
ideal heap leaching and irrigation solution recycling durations for maximum rare earth element
recovery with minimal reagent use. AR3 are confident that use of appropriate irrigation
techniques the leach duration can be shortened, while retaining a high overall REE recovery.
Following the exceptional recovery rates in the Bulk Leach, AR3 is now prioritising the
optimisation of operating costs through advancements in water treatment, reagent recycling, and
reagent usage in agglomeration.
AR3 is currently utilising the 2,000 litres of rare earth pregnant leach solutions (PLS) generated
during the Bulk Leach, to conduct an extensive testwork program to enhance impurity removal
and Mixed Rare Earths Carbonate (MREC) precipitation processes. AR3 is collaborating closely
with ANSTO, Australia’s premier laboratory for ionic clay leaching, on ongoing process flowsheet
development, with ANSTO leading the impurity removal and rare earth precipitation testwork.
Additionally, AR3 continues to work closely with Neo Performance Materials Inc. (“Neo”), a global
leader in rare earth permanent magnets and products, under a non-binding Memorandum of
Understanding that outlines a potential offtake agreement for MREC from AR3’s Koppamurra
project. Neo’s expertise in rare earth oxide separation, metallisation, and magnet production,
combined with its rare position as one of the few Western facilities processing third-party MREC,
provides critical insights to AR3’s MREC supply development.
Figure 4: Koppamurra conceptual progressive heap leach and rapid rehabilitation project flow sheet
A summary of the planned testwork to be progressed over the next three months is provided
below.
Next steps
•
Material Handling and rehabilitation
The three tonnes of now leached mineralised clay (“Ripios”) will undergo further testing
to inform the material handling and rehabilitation aspects of the project. The Ripios will
be neutralised and a material handling assessment of the clay post leaching will be
conducted.
•
Water Treatment/Recycling
Water treatment processes applied to the leach solutions and for the recycle of water and
reagents is being assessed. The use of reverse osmosis, nano filtration and/or ultra
filtration is being assessed to evaluate the potential to generate a concentrated rare earth
solution for further downstream processing, and to produce reagent and water streams
to recycle on the heaps. Opportunities for increased recoveries through reprocessing of
lower grade rare earth solution, (‘tail’ solution), are also being assessed.
•
Impurity Removal
Following the leaching and water treatment program, impurity removal optimisation will
be performed to improve the rejection of deleterious elements such as aluminium, iron,
silica, whilst maximising the recovery of the rare earths. The testwork will also evaluate
operating conditions including pH, alkali type, temperature, and residence time.
This work builds on the success of impurity removal testwork previously undertaken by
AR3 and ANSTO, the larger scale impurity removal testwork will be undertaken to
demonstrate an economic path forward for the production of marketable mixed rare earth
concentrates.
•
MREC Precipitation
Following the impurity removal program, the rare earth’s will be precipitated to produce a
saleable quality rare earth product in the form of MREC. The testwork will evaluate the
precipitation agent, pH, temperature, residence time, % solids and solid liquid separation
performance, and will be conducted in close consultation with Neo.
The announcement has been authorised for release by the Board of Australian Rare Earths Limited.
For further information please contact:
Australian Rare Earths Limited
Travis Beinke
Managing Director and CEO
T: 1 300 646 100
Media Enquiries
Jessica Fertig
Tau Media
E: info@taumedia.com.au
Engage and Contribute at the AR3 investor hub: https://investorhub.ar3.com.au/
Competent Person’s Statement
The information in this report that relates to metallurgical results is based on information compiled by Australian Rare Earths Limited and
reviewed by Jess Page who is the Group Technical Manager of WGA and member of the Institute of Chemical Engineers Australia (CEng
MIChemE). Ms Page has sufficient experience that is relevant to the metallurgical testing which was undertaken to qualify as a Competent
Person as defined in the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”.
Ms Page consents to the inclusion in this report of the matters based on this information in the form and context in which it appears.
The information in this report that relates to Exploration results is based on information compiled by Australian Rare Earths Limited and
reviewed by Mr Rick Pobjoy who is the Chief Technical Officer of the Company and a member of the Australian Institute of Mining and
Metallurgy (AusIMM). Mr Pobjoy has sufficient experience that is relevant to the style of mineralisation, the type of deposit under
consideration and to the activities undertaken to qualify as a Competent person as defined in the 2012 edition of the “Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Pobjoy consents to the inclusion in this report of the matters
based on this information in the form and context in which it appears.
About Australian Rare Earths Limited
Australian Rare Earths (AR3) is an emerging diversified critical minerals company, strategically positioned to meet the growing global demand
for uranium and rare earth elements. The Company’s vast ~7,000 km² Overland Uranium Project in South Australia shows strong uranium
discovery potential, with initial drilling identifying opportunities for substantial near-surface and deeper deposits.
Simultaneously, AR3's Koppamurra Rare Earths Project in South Australia and Victoria has secured important government support through a
A$5 million grant to accelerate development. With support from global advanced industrial materials manufacturer, Neo Performance
Materials, AR3 is progressing toward a Pre-Feasibility Study and a demonstration facility, solidifying its role in diversifying global rare earth
supply chains for the clean energy transition. With strategic projects and strong government support, AR3 is poised for significant growth in the
critical minerals market.
APPENDIX I – JORC TABLE 1 & 2
JORC Table 1 – Section 1
Criteria
Sampling
techniques
Section 1 Sampling Techniques and Data
Explanation
Comment
Nature and quality of
RC Aircore drilling methods were used obtain
sampling (e.g., cut channels,
samples from the October-December 2021,
random chips, or specific
February-April 2022, September-December 2022
specialised industry standard February- June 2023, and October-December 2023
measurement tools
drilling programs.
appropriate to the minerals
under investigation, such as
The following information covers the sampling process:
down hole gamma sondes, or
• All air core samples were collected from the
handheld XRF instruments,
rotary splitter mounted at the bottom of the
etc). These examples should
cyclone using a pre-numbered calico bag and
not be taken as limiting the
plastic UV sample bag. The samples were
broad meaning of sampling.
geologically logged at 1 m intervals using the
Include reference to
marked calico sample which averaged ~1.5
measures taken to ensure
kg in mass.
sample representivity and
• A handheld Olympus Vanta XFR Analyser was
the appropriate calibration
used to assess the geochemistry of the air
of any measurement tools or
core samples in the field. The XRF analysis
systems used. Aspects of the
provided a full suite of mineral elements for
determination of
characterising the lithological units.
mineralisation that are
• XRF readings were downloaded from the XRF
Material to the Public
Report. In cases where
Analyser at the end of each day and uploaded
‘industry standard’ work has
to the Australian Rare Earths Azure Data
been done this would be
Studio database.
relatively simple (e.g.,
• Field duplicates were taken at a rate of
‘reverse circulation drilling was
• ~1:34 and inserted blindly into the sample
used to obtain 1 m samples
batches.
from which 3 kg was pulverised
to produce a 30 g charge for fire • At the laboratory, the samples were oven
dried at 105 degrees for a minimum of 24
assay’). In other cases, more
hours and secondary crushed to 3 mm
explanation may be required,
fraction and then pulverised to 90% passing
such as where there is coarse
75 µm. Excess residue was maintained for
gold that has inherent sampling
storage while the rest of the sample placed in
problems. Unusual commodities
8x4 packets and sent to the central weighing
or mineralisation types (e.g.,
laboratory. The samples were submitted for
submarine nodules) may
warrant disclosure
analysis using XRF-ICP-MS method.
of detailed information.
• A laboratory repeat was taken at ~ 1 in 21
samples;
• Commercially obtained standards were
inserted by the laboratory at a rate of ~ 1 in 9
into the sample sequence.
Mechanical excavation techniques were applied
to the recovery of samples from the area of AR3’s
Trial Pit. Trial Pit samples were taken from a
number of discrete locations within the pit,
nominally 1m wide x 1m long x 0.5m deep.
Material from these locations were loaded into a
dump truck by an excavator and taken to a
laydown site for assessment.
APPENDIX I – JORC TABLE 1 & 2
Criteria
Section 1 Sampling Techniques and Data
Explanation
Comment
Up to 5 x dump truck piles of material from each
discrete location were dumped on the laydown.
Up to 12 x bulka bags were filled from those (up
to) 5 x piles of material and each was provided
a unique Bulka Bag # which referenced a Location
and sample pile number. Eg C2L1aP3 (C2 - cut
bench 2, L1a – location 1a, P3 – pile 3).
Samples provided for column leach testwork were
sourced from Trial Pit Locations;
C2L1aP3, Bulka Bag #146
C2L3P2, Bulka Bag #121
C4L4P5, Bulka Bag #410
C4L4P2, Bulka Bag #345
Each of the four bulka bag were emptied into separate
piles on clean warehouse floor, composited into single
pile using skid steer. Performed standard cone and
quarter homogenization method on the pile using skid
steer. Heavy dusting as ore was dry as added water
via mist at ~2L/min over ~25 mins.
Final mixed composite transferred 18 x 200L drums via
skid steer.
Final mass across drums ~3324 kg (note this is actually
more than the as-received mass, but some water mass
added during dust suppression – still within typical
lab/weigh scale accuracy).
1 x drum set aside for redundancy.
Remaining 17 x drums screened to 31.5 mm top size.
APPENDIX I – JORC TABLE 1 & 2
Criteria
Drilling
techniques
Explanation
Drill type (e.g., core, reverse
circulation, open- hole
hammer, rotary air blast,
auger, Bangka, sonic, etc) and
details (e.g., core diameter,
triple or standard tube, depth
of diamond tails, facesampling bit, or other type,
whether core is oriented and if
so, by what method, etc).
Comment
• Drilling was completed using a Mcleod or
Wallis air ore drill rig (Landcruiser 6x6 or
similar) for the drilling.
• Aircore drilling is a form of reverse circulation
drilling where the sample is collected at the face
and returned inside the inner tube. The drill
cuttings are removed by injection of compressed
air into the hole via the annular area between
the inner tube and the drill rod.
• Aircore drill rods used were 3 m long.
• NQ diameter (76 mm) drill bits and rods
were used.
• All aircore drill holes were vertical with
depths varying between 2 m and 36 m.
Drill
sample
recovery
Method of recording and
•
assessing core and chip sample
recoveries and results assessed.
Measures taken to maximise
sample recovery and ensure
representative nature of the
samples.
•
Whether a relationship exists
between sample recovery and
grade and whether sample bias
may have occurred due to
preferential loss/gain of
fine/coarse material.
•
•
•
•
•
Drill sample recovery for aircore is monitored
by recording sample condition descriptions
where ‘Poor’ to ‘Very Poor’ were used to
identify any samples recovered which were
potentially not representative of the interval
drilled.
A comment was included where water
injection was required to recover the sample
from a particular interval. The use of water
injection can potentially bias a sample and
very little water injection was required during
this drilling program.
No significant loses of samples were observed
due to the shallow drilling depths (<36 m).
The rotary splitter was set to an approximate
20% split, which produced approximately 1.5
kg sample for each meter interval.
The 1.5 kg sample was collected in a prenumbered calico bags and the remaining 80%
(5 kg to 8 kg) was collected in plastic UV bags
labelled with the hole number and sample
interval.
At the end of each drill rod, the drill string is
cleaned by blowing down with air to remove
any clay and silt potentially built
up in the sample pipes and cyclone.
No relationship exists between sample
recovery and grade.
APPENDIX I – JORC TABLE 1 & 2
Criteria
Logging
Explanation
Comment
Whether core and chip
• All aircore samples collected in calico bags
samples have been
were logged for lithology, colour, cement
geologically and
type, hardness, percentage rock estimate,
geotechnically logged to a
sorting, and any relevant comments such as
level of detail to support
moisture, sample condition, or vegetation.
appropriate Mineral Resource
• Geological logging data for all drill holes was
estimation, mining studies
qualitatively logged onto Microsoft Excel
and metallurgical studies.
spreadsheet using a Panasonic Toughbook
Whether logging is qualitative
with validation rules built into the
or quantitative in nature. Core
spreadsheet including specific drop- down
(or costean, channel, etc)
menus for each variable. The data was
photography.
uploaded to the Australian Rare Earths Azure
The total length and percentage
Data Studio database.
of the relevant intersections
logged.
• Every drill hole was logged in full and logging
was undertaken with reference to a drilling
template with codes prescribed and guidance
to ensure consistent and systematic data
collection.
Subsampling
techniques
and sample
preparation
If core, whether cut or sawn
and whether quarter, half or
all cores taken.
If non-core, whether riffled,
tube sampled, rotary split,
etc and whether sampled
wet or dry.
For all sample types, the nature,
quality, and appropriateness of
the sample preparation
technique.
Quality control procedures
adopted for all sub-sampling
stages to maximise
representivity of samples.
Measures taken to ensure that
the sampling is representative
of the in- situ material
collected, including for
instance results for field
duplicate/second-half sampling.
Whether sample sizes are
appropriate to the grain size of
the material being sampled.
• 1 m aircore sample interval were
homogenised within the cyclone and the
rotary splitter was set to an approximate
20% split producing around 1.5 kg sample for
each metre interval.
• The 1.5 kg sample was collected in a prenumbered calico bag and the 80% (5 kg to 8
kg) portion was collected in plastic UV bags
labelled with hole identity and interval.
• Duplicates were generally taken within the clay
lithologies above the basement as this is the
likely zone of REE enrichment. These duplicate
samples were normally collected by using a
second calico bag and placing it under the rotary
splitter collecting a 20% split but due to the
difficulties of placing a second calico bag under
the rotary splitter during sample collection,
some duplicates were collected by hand from the
plastic UV bags which captured the other 80% of
the material recovered from any particular
interval.
• The material in the plastic UV bags was mixed
up and every attempt to take as representative
sample of the material as possible by hand was
made and then placed in a pre-numbered calico
bag.
• The 1.5 kg sample collected in the calico bag
was logged by the geologist onsite. The logged
samples were placed in polyweave bags and
sent to Naracoorte base at the end of each day.
The polyweave bags were then placed on
pallets and dispatched to Bureau Veritas
laboratory in Adelaide in Bulka Bags.
APPENDIX I – JORC TABLE 1 & 2
Criteria
Explanation
Comment
• The remaining 80% split from the aircore
interval was stored for future reference.
• Field duplicates of all the samples were
completed at a frequency of ~1 in 34 samples.
Field standards were inserted into the sample
sequence at a frequency of
~1:57. Standard reference Material (SRM)
samples were inserted into the sample batches
at a frequency rate of 1 per 10 samples by the
laboratory and a repeat sample was taken at a
rate of 1 per 21 samples.
• A rig geologist oversaw the sampling and
logging process while a second geologist
selected samples for analysis based on the
logging descriptions and pXRF analysis. Clay
rich sample and those adjacent to the
limestone basement contact were selected for
assay. REEs are known to be contained within
the clay component of the sediment package
based on analysis of XRF data and
previous exploration work.
•
Quality of
assay data
and
laboratory
tests
The nature, quality and
appropriateness of the
assaying and laboratory
procedures used and
whether the technique is
considered partial or total.
For geophysical tools,
spectrometers, handheld XRF
instruments, etc, the
parameters used in
determining the analysis
including instrument make
and model, reading times,
calibrations factors applied
and their
•
•
•
•
The pre-split samples were passed through a
31.5 mm screen and the oversize gently
crushed and recombined with the undersize.
Oversize that could not be broken down – tamp
material for example was collected and set aside
(less than 0.5% of total mass). The material was
then taken through to agglomeration.
The detailed geological logging of samples
provides lithology (clay component) and
proximity to the limestone basement which is
sufficient for the purpose of determining the
mineralised zone.
The 1.5 kg aircore samples were assayed by
Bureau Veritas laboratory in Wingfield,
Adelaide, South Australia, which is considered
the Primary laboratory.
The samples for this program of work were
subsampled and assayed by a combination of
XRF and ICP (in-house - BML). Due to concern
regarding Ca concentration, multiple head
assays undertaken (both fresh new samples
and repeats).
The samples were initially oven dried at 105
degrees Celsius for 24 hours. Samples were
secondary crushed to 3 mm fraction and the
weight recorded. The sample was then
APPENDIX I – JORC TABLE 1 & 2
pulverised to 90% passing 75 µm. Excess
residue was maintained for storage while
the rest of the sample placed in 8x4 packets
and sent to the central weighing
laboratory.
APPENDIX I – JORC TABLE 1 & 2
Criteria
Explanation
derivation, etc.
Nature of quality control
procedures adopted (e.g.,
standards, blanks,
duplicates, external
laboratory checks) and
whether acceptable levels of
accuracy (i.e., lack of bias)
and precision have been
established.
Comment
• All weighed samples were then analysed
using the Multiple Elements Fusion/Mixed
Acid Digest analytical method;
• ICP Scan (Mixed Acid Digest – Lithium Borate
Fusion) Samples are digested using a mixed
acid digest and also fused with Lithium Borate
to ensure all elements are brought into
solution. The digests are then analysed for the
following elements (detection Limits shown):
Al (100) As (1) Ba
(1) Be (0.5) Ca(100) Ce (0.1) Co (1) Cr (10)
Dy (0.05) Er (0.05) Eu(0.05) Fe(100) Gd
(0.2) Ho (0.02) K (100) La (0.5) Lu (0.02) Mg
(100) Mn (2) Na (100) Nd (0.05) Ni (2) Pr
(0.2) S (50) Sc (1) Si (100) Sm(0.05) Sr (0.5)
Th (0.1) Ti (50) Tm (0.2) U (0.1) V (5) Y (0.1)
Yb (0.05) Zr (1)
• Field duplicates were collected and
submitted at a frequency of ~1 per 34
samples.
• Bureau Veritas completed its own internal
QA/QC checks that included a Laboratory
repeat every 21st sample and a standard
reference sample every 9th sample prior to the
results being released.
• Analysis of QA/QC samples show the
laboratory data to be of acceptable
accuracy and precision;
• Australian Rare Earths submitted field
standards at a frequency of ~1:57 samples.
• Australian Rare Earths requested BV insert
blank washes at a frequency of 1:40 samples.
These blank washes were inserted in the
sample sequence behind samples which were
thought to be mineralized to ensure that no
contamination from higher grade samples was
occurring. Frequency of blank samples totaled
1 in 24 samples.
The adopted QA/QC protocols are acceptable for this
stage of test work. The sample preparation and assay
techniques used are industry standard
and provide a total analysis.
APPENDIX I – JORC TABLE 1 & 2
Criteria
Verification
Explanation
The verification of
of sampling
and assaying
significant intersections by
either independent or
alternative company
personnel.
The use of twinned holes.
Documentation of primary
data, data entry procedures,
data verification, data
storage (physical and
electronic) protocols.
Discuss any adjustment to
assay data.
Comment
• All results are checked by the company’s Technical
Director.
• Field based geological logging for drill holes
was entered directly into an Excel spreadsheet
format with validation rules built into the
spreadsheet including specific drop-down
menus for each variable. This digital data was
then uploaded to the Australian Rare Earths
Azure Data Studio database.
• Assay data was received in digital format
from the laboratory and was uploaded
Australian Rare Earths Azure Data Studio
database.
• Field and laboratory duplicate data pairs of
each batch are plotted to identify potential
quality control issues.
• Standard Reference Material sample results are
checked from each sample batch to ensure they
are within tolerance (<3SD) and that there is no
bias.
• The field and laboratory data was exported and
imported into Datamine by IHC R
Share your feedback
Discover