Koppamurra metallurgical test work progressing well
Released
Released
Announcement PDF
29 July 2025
Koppamurra Rare Earths Project
metallurgical testwork progressing well
Highlights:
•
Successful Mixed rare earth oxide (MREO) production: 1,800L of Pregnant Leach
Solution (PLS), produced from ~3-tonne heap leach testwork, has delivered ~34kg of
MREO, an intermediate step to producing a Mixed Rare Earth Carbonate (MREC).
•
Flexible processing pathway: Results confirm significant reduction in material
moving through downstream processes, providing potential for streamlined
production of a MREC.
•
High magnet rare earth (MRE) recoveries: MRE recoveries of 99% achieved through
simple, low-cost direct precipitation from PLS to MREO.
•
Strong basis for cost efficient processing: Intermediate step potentially reduces
equipment size and reduces cost required for downstream Impurity Removal (IR) and
MREC production.
•
Next steps: Additional testwork, including optimising the intermediate MREO redissolution and impurity removal steps will enhance the production of a high-quality
MREC, with results to inform the Pre-Feasibility Study (PFS).
•
Government Co-Funding Grant: Testwork program is co-funded under the $5 million
Australian Government grant from the International Partnerships in Critical Minerals
Program.
•
Engage with this announcement at the AR3 investor hub.
AR3 Managing Director and CEO, Travis Beinke, commented:
“Our latest testwork marks another important step forward for Koppamurra. The
successful production of ~34kg of MREO from the bulk leach PLS provides us with greater
flexibility in downstream processing options. Importantly, the substantial reduction in
material volumes entering the impurity removal and MREC production stages provides a
strong basis for cost-efficient processing.
We’re working closely with the Australian Nuclear Science and Technology Organisation
and our technical partner Neo Performance Materials to optimise impurity removal and
deliver a saleable MREC product, further de-risking the project as we advance towards
the PFS.”
Australian Rare Earths Limited (ASX: AR3) continues to progress its metallurgical
testwork program at the Koppamurra Rare Earths Project in South Australia.
Following the ~3-tonne bulk heap leach campaign delivering 63% recovery of magnet rare
earths in a PLS (ASX Release: 26 June 2025 and Figure 3), 1,800 litres of the PLS has been
processed. Producing approximately 34kg of a Mixed Rare Earth Oxide intermediary
product (Figure 1 and Figure 2), this reinforces the project’s potential for scalable, costeffective production.
In testwork undertaken at Australian Nuclear Science and Technology Organisation
(ANSTO), AR3 achieved a 99% recovery of MRE through the precipitation of a MREO by
applying a batch continuous operation, using a cost-effective reagent, magnesium oxide
(MgO). During this process the slurry settled effectively, yielding clear barren liquor and a
filter cake with ~68% moisture content, demonstrating significant mass reduction and
rapid liquor recovery for the efficient recycling of water in the process flowsheet.
The intermediate MREO precipitate captured 100% of terbium (Tb) and dysprosium (Dy),
and 99% of neodymium (Nd) and praseodymium (Pr), with partial rejection of impurities
like magnesium (Mg) and iron (Fe).
This intermediate processing step has demonstrated the potential for a concentration of
rare earths into a MREO, significantly reducing solution volumes and equipment sizes for
downstream IR and MREC production. This volume reduction (in the order of 98%)
provides AR3 with greater flexibility in downstream processing options.
The testwork confirms the suitability of Koppamurra’s ionic clay-hosted ore for cost
efficient processing, with rapid settling and filtration enabling high rare earth recoveries.
The Company is now progressing re-dissolution and impurity removal testwork to refine
the MREO into a high-quality MREC, designed to meet the product specifications sought
by AR3’s technical partner, Neo Performance Materials (Neo), which has a non-binding
MoU with the Company for 50% of the offtake from Phase 1 of the Koppamurra project.
Next steps
• Impurity Removal: Optimisation of MREO re-dissolution and impurity removal
(e.g., aluminium, iron, silica).
• MREC Precipitation: Further testwork to evaluate precipitation conditions (pH,
temperature, residence time) for a marketable MREC product.
Figure 1: Sample of MREO Filter Cake from PLS precipitation
Figure 2: ~30kg of MREO Filter Cake from PLS precipitation
Figure 3: Koppamurra Project Location Map with Trial Pit Location, significant Mineral Resource
Estimate area and the proposed Mine Lease application area. The Trial Pit was conducted within an
area 140m long x 45m wide centred on co-ordinates 5,884,422.5mN, 493,455mE GDA2020 MGA
Zone 54. Samples from the Trial Pit were utilised for the testwork outlined in this announcement and
detailed in the JORC table.
The announcement has been authorised for release by the Board of Australian Rare Earths Limited.
For further information please contact:
Australian Rare Earths Limited
Travis Beinke
Managing Director and CEO
T: 1 300 646 100
Media Enquiries
Jessica Fertig
Tau Media
E: info@taumedia.com.au
Engage and Contribute at the AR3 investor hub: https://investorhub.ar3.com.au/
Competent Person’s Statement
The information in this report that relates to metallurgical results is based on information compiled by Australian Rare Earths
Limited and reviewed by James Davidson who is the principal Metallurgist of Rendement and is a Fellow of the AusIMM. Mr
Davidson has sufficient experience that is relevant to the metallurgical testing which was undertaken to qualify as a
Competent Person as defined in the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves”. Mr Davidson consents to the inclusion in this report of the matters based on this information
in the form and context in which it appears.
The information in this report that relates to Exploration results is based on information compiled by Australian Rare Earths
Limited and reviewed by Mr Rick Pobjoy who is the Chief Technical Officer of the Company and a member of the Australian
Institute of Mining and Metallurgy (AusIMM). Mr Pobjoy has sufficient experience that is relevant to the style of mineralisation,
the type of deposit under consideration and to the activities undertaken to qualify as a Competent person as defined in the
2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Pobjoy
consents to the inclusion in this report of the matters based on this information in the form and context in which it appears.
About Australian Rare Earths Limited
Australian Rare Earths (AR3) is an emerging diversified critical minerals company, strategically positioned to meet the growing
global demand for rare earth elements and uranium
AR3's Koppamurra Rare Earths Project in South Australia and Victoria has secured important government support through a $5
million grant to accelerate development. With support from global advanced industrial materials manufacturer, Neo
Performance Materials, AR3 is progressing toward a Pre-Feasibility Study and a demonstration facility, solidifying its role in
diversifying global rare earth supply chains for the clean energy transition. With strategic projects and strong government
support, AR3 is poised for significant growth in the critical minerals market.
Simultaneously, the Company’s vast ~7,700 km² Overland Uranium Project in South Australia shows strong uranium discovery
potential, with initial drilling identifying opportunities for substantial near-surface and deeper deposits.
APPENDIX I – JORC TABLE 1 & 2
JORC Table 1 – Section 1
Criteria
Sampling
techniques
Section 1 Sampling Techniques and Data
Explanation
Comment
Nature and quality of
Mechanical excavation techniques were applied to the
recovery of samples, for bulk leach testwork, from the
sampling (e.g., cut channels,
area of AR3’s Trial Pit. Trial Pit samples were taken
random chips, or specific
from a number of discrete locations within the pit, each
specialised industry standard
nominally 1m wide x 1m long x 0.5m deep. Material
measurement tools
from these locations were loaded into a dump truck by
appropriate to the minerals
an excavator and taken to a laydown site for
under investigation, such as
assessment.
down hole gamma sondes, or
handheld XRF instruments,
Up to 5 x dump truck piles of material from each
etc). These examples should
discrete location were placed on the laydown. Up
not be taken as limiting the
to 12 x bulka bags were filled from those (up to) 5
broad meaning of sampling.
Include reference to
x piles of material and each was provided
measures taken to ensure
a unique Bulka Bag # which referenced a Location
sample representivity and
and sample pile number. Eg C2L1aP3 (C2 - cut
the appropriate calibration
bench 2, L1a – location 1a, P3 – pile 3).
of any measurement tools or
systems used. Aspects of the
Samples provided for column leach and bulk leach
determination of
testwork were sourced from Trial Pit Locations;
mineralisation that are
C2L1aP3, Bulka Bag #146
Material to the Public
C2L3P2, Bulka Bag #121
Report. In cases where
C4L4P5, Bulka Bag #410
‘industry standard’ work has
C4L4P2, Bulka Bag #345
been done this would be
relatively simple (e.g.,
‘reverse circulation drilling was Each of these four bulka bags were emptied into
separate piles on a clean warehouse floor at
used to obtain 1 m samples
from which 3 kg was pulverised Brisbane MetLabs (BML), composited into single
to produce a 30 g charge for fire pile using skid steer. Performed standard cone
and quarter homogenization method on the pile
assay’). In other cases, more
using skid steer. Heavy dusting as the ore was
explanation may be required,
dry was managed through water added via mist
such as where there is coarse
gold that has inherent sampling at ~2L/min over ~25 mins.
problems. Unusual commodities
or mineralisation types (e.g.,
Final mixed composite transferred to 18 x 200L
submarine nodules) may
drums via skid steer.
warrant disclosure
Final mass across drums was ~3324 kg (note this
of detailed information.
is actually more than the as-received mass, but
some water mass added during dust suppression
– still within typical lab/weigh scale accuracy).
1 x drum was set aside for redundancy.
The remaining 17 x drums were screened to 31.5
mm top size.
APPENDIX I – JORC TABLE 1 & 2
Criteria
Drilling
techniques
Drill
sample
recovery
Section 1 Sampling Techniques and Data
Explanation
Comment
Drill type (e.g., core, reverse
• No drilling techniques were used in
circulation, open- hole
the recovery of the samples from the
hammer, rotary air blast,
Trial Pit used in the bulk leach
auger, Bangka, sonic, etc) and
testwork.
details (e.g., core diameter,
triple or standard tube, depth
of diamond tails, facesampling bit, or other type,
whether core is oriented and if
so, by what method, etc).
Method of recording and
• Not applicable, no drilling was used in the
assessing core and chip sample
recovery of the samples used in the bulk
recoveries and results assessed.
leach testwork
Measures taken to maximise
sample recovery and ensure
representative nature of the
samples.
Whether a relationship exists
between sample recovery and
grade and whether sample bias
may have occurred due to
preferential loss/gain of
fine/coarse material.
APPENDIX I – JORC TABLE 1 & 2
Criteria
Logging
Explanation
Comment
Whether core and chip
Excavation and Stockpiling of Ore Samples from
samples have been
Trial Pit
geologically and
Trial Pit samples were taken from a number of
geotechnically logged to a
discrete locations within the pit, nominally 1m
level of detail to support
wide x 1m long x 0.5m deep. Sampling from the
appropriate Mineral Resource
Trial Pit was undertaken using the Sampling
estimation, mining studies
Procedure and Action Register developed by WGA
and metallurgical studies.
for AR3, 19th April 2022, detailed as follows;
Whether logging is qualitative
• When digging nears a sample location within
or quantitative in nature. Core
the pit, Pit Manager is to communicate with
(or costean, channel, etc)
the excavator operator, the truck operator
photography.
and Geologist, the location number (L1, L2,
The total length and percentage
L3, L4) to be excavated and the sub-area
of the relevant intersections
within the ore sampling area where the ore
logged.
sample material is to be off-loaded.
• For each sample location, the four (4) truck
loads are to be off-loaded within the
corresponding ore sampling sub-area as
defined by the signs. Loads of the same
sample location are ideally off-loaded into
distinct separate piles, however if space is
limited, load piles can be slightly overlapped.
Ore Identification
For each of the four (4) truck load piles within a
sample location, place a ‘pile stake’ denoting the
cut stage, the sample location and the pile
number for the four (4) separate sub-area as
follows:
• Cut stage_sample location pile number
(i.e. C1_L2_P4)
• For each ore sample location, a visual
inspection of the individual four (4) piles is
to be performed to determine if the
lithology of the piles aligns with the
expected lithology from the Geovia
Surpac model spreadsheet:
• If the actual lithology aligns with the
expected lithology, keep these piles and
sample.
• Add a ‘SAMPLE’ comment to the pile
stake.
• If the actual lithology DOES NOT align
with the expected lithology, for ≤50% (i.e.
less than or equal to two (2) out of four
(4) piles) of the ore sample, disregard
these piles and do not sample.
• Add a ‘DO NOT SAMPLE’ comment to the
pile stake.
• Add a comment within the Geovia Surpac
APPENDIX I – JORC TABLE 1 & 2
model spreadsheet, detailing both the
number of piles that did not align with the
expected lithology and the actual
lithology of those piles
• If the actual lithology DOES NOT align
with the expected lithology, for >50% (i.e.
three (3) or more piles) of the ore sample,
keep these piles and sample.
• Add a ‘SAMPLE’ comment to the pile
stake
• Update the Geovia Surpac model
spreadsheet with the actual lithology of
the ore sample and record in the
comments section that a difference in
lithology was identified for all sample
location piles
• Place the pile stake in the corresponding
pile and photograph each pile separately
Ore Sampling for XRF Testing
• For the piles identified as ‘SAMPLE’,
sample spear (or hand-grab based on the
lithology of pile), three (3) samples of
approximately 500g from the pile at
random (i.e. from top, middle and base of
pile).
• Place each 500g sample in a separate,
calico bag with pre-assigned sample
identification code.
• Based on the number of piles identified as
‘SAMPLE’ for each sample location, a
minimum of six (6) and a maximum of
twelve (12) 500g samples are to be taken
for each sample location.
• Record the following within the XRF CSV
file: Pre-assigned sample identification
code (e.g. 683229) Cut stage_sample
location_pile number (i.e. C1_L2_P4)
Ore Sampling for Bulk Bagging
• For the piles identified as ‘SAMPLE’,
instruct the mini excavator operator to
take the required tonnage (based on the
Geovia Surpac model spreadsheet) from
piles at random to the bulk bag filling
station.
• For each bulk bag, record the following:
Cut stage and sample location (i.e. C1_L1)
and average pXRF Yttrium values across all
samples for the sample location
• Once required tonnage from a sample
location is bagged, instruct the grader
operator to push piles identified as ‘DO
APPENDIX I – JORC TABLE 1 & 2
NOT SAMPLE’ and leftover ore from the
sampled piles, into the overburden
stockpile.
Subsampling
techniques
and sample
preparation
If core, whether cut or sawn
and whether quarter, half or
all cores taken.
If non-core, whether riffled,
tube sampled, rotary split,
etc and whether sampled
wet or dry.
For all sample types, the nature,
quality, and appropriateness of
the sample preparation
technique.
Quality control procedures
adopted for all sub-sampling
stages to maximise
representivity of samples.
Measures taken to ensure that
the sampling is representative
of the in- situ material
collected, including for
instance results for field
duplicate/second-half sampling.
Whether sample sizes are
appropriate to the grain size of
the material being sampled.
• The pre-split samples from the 4 x bulka bags
(17 x drums) were passed through a 31.5 mm
screen and the oversize gently crushed and
recombined with the undersize. Oversize that
could not be broken down – tamp material
for example was collected and set aside (less
than 0.5% of total mass). The material was
then taken through to agglomeration.
APPENDIX I – JORC TABLE 1 & 2
Criteria
Quality of
assay data
and
laboratory
tests
Explanation
Comment
The nature, quality and
• The samples for the BML Bulk Leaching
appropriateness of the
program of work were subsampled and
assaying and laboratory
assayed by a combination of XRF and ICP
procedures used and whether
(in-house - BML). Due to concern regarding
the technique is considered
Ca concentration, multiple head assays
partial or total. For
undertaken (both fresh new samples and
geophysical tools,
repeats).
spectrometers, handheld XRF
instruments, etc, the
ANSTO Testwork on MREO precipitation:
parameters used in
• Samples, including the PLS, were
determining the analysis
analysed in-house by ANSTO and were
including instrument make
not contracted out to third party
and model, reading times,
service providers.
calibrations factors applied
• ANSTO Minerals conducts its activities
and their derivation, etc.
in accordance with AB-0101 ANSTO
Nature of quality control
Quality Policy, following the guidelines
procedures adopted (e.g.,
of ISO 9001 requirements for Quality
standards, blanks,
Management Systems.
duplicates, external
• Elemental analysis of samples was
laboratory checks) and
undertaken using the following
whether acceptable levels of
approach:
accuracy (i.e., lack of bias)
• Solids – a combination of XRF
and precision have been
and digestion/ICP-OES/ICP-MS.
established.
• Liquors – a combination of ICPOES and ICP-MS.
• For elemental concentrations
measured using ICP-OES and ICPMS, the instrument is calibrated
using ICP standard solutions
containing the elements of
interest. Internal standards are
added to each sample to
determine recoveries. Certified
reference liquors are used to
verify the calibration. Each
calibration curve is verified to
ensure a correlation coefficient of
0.995 or better for quantitative
results. Internal standard
recoveries are verified to ensure
100 ± 30%. Method blank and/or
calibration blank solutions are
analysed at the beginning of the
sample sequence and high blank
values investigated, and
appropriate action taken where
appropriate.
The adopted QA/QC protocols are acceptable for this
stage of test work. The sample preparation and assay
techniques used are industry standard
and provide a total analysis.
APPENDIX I – JORC TABLE 1 & 2
Criteria
Explanation
Verification of sampling The verification of
significant intersections by
and assaying
either independent or
alternative company
personnel.
The use of twinned holes.
Documentation of primary
data, data entry procedures,
data verification, data
storage (physical and
electronic) protocols.
Discuss any adjustment to
assay data.
Comment
• All results are checked by the CP for reporting of
this testwork.
Location of
data points
Trial Pit samples for Bulk Leach testing were
taken from 4 x discrete locations within the Trial
Pit. The Trial Pit location is within an area roughly
140m long by 45m wide (6,300m2) bounded by
these co-ordinates;
• 5884400mN, 493385mE
• 5884400mN, 493525mE
• 5884445mN, 493525mE
• 5884445mN, 493385mE.
• The datum used is GDA2020/MGA Zone 54.
• Topographic data over the Trial Pit and over
the southern area of the Koppamurra
Mineral Resource (including all
Inferred/Indicated/Measured resource
areas) is derived from a fixed wing LiDAR
survey flown in May 2022 by Aerometrex
using their RIEGL VQ-780ii sensor. The LiDAR
survey data was captured at a minimum 25
points per meter and flown at a height of
591m to ensure ~10cm vertical accuracy.
• The Trial Pit location was set out by
Licensed Surveyors; Alexander & Symonds
Pty Ltd 27A Crouch Street South Mt
Gambier, South Australia
• The accuracy of the locations is sufficient for
this stage of exploration.
Accuracy and quality of
surveys used to locate drill
holes (collar and down- hole
surveys), trenches, mine
workings and other locations
used in Mineral Resource
estimation.
Specification of the grid
system used.
Quality and adequacy of
topographic control.
APPENDIX I – JORC TABLE 1 & 2
Criteria
Data spacing
and
distribution
Orientation
of data in
relation to
geological
structure
Explanation
Comment
Data spacing for reporting of • Sampling from the Trial Pit was conducted at
Exploration Results.
18 discrete locations within the Pit and totaled
Whether the data spacing,
~500t of material from an excavation that
and distribution is sufficient
uncovered ~3,500t of REE mineralized clays in
to establish the degree of
total.
geological and grade
• Sample sizes from each of the 18 locations
continuity appropriate for
were nominally 1m wide by 1m long by
the Mineral Resource and
0.5m thick.
Ore Reserve estimation
• 6 sample locations were located on cut
procedure(s) and
bench 1, 5 sample locations were located on
classifications applied.
cut bench 2, 3 sample locations were located
Whether sample compositing
on cut bench 3, 4 sample locations were
has been applied.
located on cut bench 4.
• Up to 12 x bulka bags were filled from those
(up to) 5 x piles of material and each was
provided a unique Bulka Bag # which
referenced a Location and sample pile
number. Eg C2L1aP3 (C2 - cut bench 2, L1a –
location 1a, P3 – pile 3)
• Samples used in the Bulk Leach Testwork
were 1 x bulka bag (of the up to 12) from 4
locations, 2 x from cut bench 2 and 2 x from
cut bench 4.
• The 4 x samples were composited together
to provide approximately 3.3t of material for
bulk leach testwork.
Whether the orientation of
• The Koppamurra mineralisation is interpreted
sampling achieves unbiased
to be hosted in flat lying clays that are
sampling of possible
horizontal. Undulation of the clay unit is
structures and the extent to
influenced by the weathered limestone
which this is known,
basement below.
considering the deposit type.
• All drill holes are vertical which is appropriate
If the relationship between
for horizontal bedding and regolith profile.
the drilling orientation and
the orientation of key • The Koppamurra drilling was oriented
perpendicular to the strike of mineralisation
mineralised structures is
defined by previous exploration and current
considered
to
have
geological interpretation.
introduced a sampling bias,
this should be assessed and • The strike of the mineralisation is north south,
reported if material.
and the high grades follow a northwestsoutheast trend.
• All drill holes were vertical, and the
orientation of the mineralisation is relatively
horizontal.
• The orientation of the drilling is considered
appropriate for testing the lateral and vertical
extent of mineralisation without any bias.
APPENDIX I – JORC TABLE 1 & 2
Criteria
Sample
security
Explanation
Comment
The measures taken to ensure
• For the Bulk leach ore samples:
sample security.
• Approximately 2,941 kg of ore, securely
packaged in bulk bags on pallets and
wrapped in heavy-duty plastic (total weight
3,370 kg), was transported from Adelaide to
Brisbane Met Labs by truck via Northline, a
leading Australian freight and logistics
provider.
•
•
Audits or
reviews
The results of any audits or
reviews of sampling
techniques and data.
•
Upon arrival no reports of tampering
with the sample were made.
For the PLS samples sent to ANSTO:
•
Approximately 2,000 L of PLS was
securely transported in IBCs on pallets
from Brisbane Met Labs to ANSTO by
truck via FedEx, a reputable
multinational freight and logistics
provider. To mitigate the risk of loss, the
PLS was shipped in two separate
consignments. The 2000 L of PLS was
split across two IBCs, where the second
shipment was dispatched only after
confirmation of safe delivery of the first
shipment to ANSTO.
•
Upon arrival no reports of tampering
with the sample were made.
A review of the Metallurgical Bulk Leach Test
Work and results was undertaken by
Rendement – Consulting Engineers – James
Davidson. Rendement is the CP for
Metallurgical Testwork.
APPENDIX I – JORC TABLE 1 & 2
Appendix I - JORC Table 1 - Section 2, Reporting of Exploration Results
Criteria
Mineral
tenement and
land tenure
status
Criteria
Exploration
done by other
parties
Section 2 Reporting of Exploration Results
Explanation
Comment
Type, reference
• Koppamurra Project comprises of a granted
name/number, location
South Australian Exploration Licences (EL),
and ownership including
EL6509, EL6613, EL6690, EL6691, EL6942, and
agreements or material
EL6943 along with Victorian EL007254 and
issues with third parties
EL007719 covering a combined area of ~6,300
such as joint ventures,
km2 which is in good standing.
partnerships, overriding
• The Trial Pit excavation and sampling work
royalties, native title
was completed on the tenement EL 6509
interests, historical sites,
which is 100% owned by the company
wilderness or national park
Australian Rare Earths Ltd.
and environmental
• EL6509 is within 100m of a Glen Roy
settings.
Conservation Park and the Naracoorte Caves
The security of the tenure
National Park, the latter of which is excised
held at the time of reporting
along with any known
from the tenement. The License area contains
impediments to obtaining a
several small Extractive Mineral Leases (EML)
licence to operate in the
held by others, Native Vegetation Heritage
area.
Agreement areas, as well as the Deadman’s
Swamp Wetlands which are wetlands of
national importance.
• A Native Title Claim by the First Nations of the
South East #1 has been registered but is yet to
be determined. The claim area includes the
areas covered by EL’s 6509, 6613, 6690,
6691, 6942, and 6943.
• The Exploration License EL6509 original date
of grant was 15/09/2020 with an expiry date
of 14/09/2028.
• Details regarding royalties are discussed in
chapter 3.4 of Australian Rare Earths
Prospectus dated 7 May 2021.
Explanation
Acknowledgment and
appraisal of exploration by
other parties.
Comment
• Exploration activities by other exploration
companies in the area have not previously
targeted or identified REE mineralisation.
• Historical exploration activities in the vicinity
of Koppamurra include investigations for coal,
gold and base metals, uranium, and heavy
mineral sands.
• Historical exploration by other parties is
detailed in Chapter 7 of Australian Rare Earths
Prospectus dated 7 May 2021.
APPENDIX I – JORC TABLE 1 & 2
Geology
Deposit type, geological
setting and style of
mineralisation.
•
•
•
•
•
The Koppamurra deposit is interpreted to
contain analogies to ion adsorption ionic clay
REE deposits. REE mineralisation at
Koppamurra is hosted by clayey sediments
interpreted to have been deposited onto a
limestone base (Gambier Limestone) and
accumulated in an interdunal, lagoonal or
estuarine environment.
A dedicated research program investigating
the source of the REE at Koppamurra is
ongoing, with no definitive source of the REE
confirmed to date although preliminary
results of this study have ruled out the alkali
volcanics in south- eastern Australia which
was originally considered.
Mineralogical test work previously conducted
on clay samples from the project area
established that the dominant clay minerals
are smectite and kaolin, and that the few REErich minerals detected during the SEM
investigation are considered consistent with
the suggestion that a significant proportion of
REE are distributed in the material as
adsorbed elements on clay and iron oxide
surfaces.
There are several known types of regolith
hosted REE deposits, including: ion adsorption
clay deposits, alluvial and placer deposits.
Whilst Koppamurra shares similarities with
both ion adsorption clay deposits and volcanic
ash fall placer deposits, there are also several
differences, highlighting the need for further
work before a genetic model for REE
mineralisation at Koppamurra can be
confirmed.
There is insufficient geological work
undertaken to determine any geological
disruptions, such as faults or dykes, that may
cause variability in the mineralisation.
APPENDIX I – JORC TABLE 1 & 2
Criteria
Drill hole
Information
Data
aggregation
methods
Explanation
A summary of all information
material to the understanding of
the exploration results including a
tabulation of the following
information for all Material drill
holes:
- easting and northing of the drill
hole collar
- elevation or RL (Reduced Level –
elevation above sea level in
metres) of the drill hole collar
- dip and azimuth of the hole
- down hole length and
interception depth
- hole length.
If the exclusion of this information is
justified on the basis that the
information is not Material and this
exclusion does not detract from the
understanding of the report, the
Competent Person should clearly
explain why this is the case.
In reporting Exploration Results,
weighting averaging techniques,
maximum and/or minimum grade
truncations (eg cutting of high
grades) and cut-off grades are
usually Material and should be
stated.
Where aggregate intercepts
incorporate short lengths of high
grade results and longer lengths of
low grade results, the procedure
used for such aggregation should be
stated and some typical examples of
such aggregations should be shown
in detail.
The assumptions used for any
reporting of metal equivalent values
should be clearly stated.
Comment
• Not applicable, no drilling was used in the
recovery of the samples used in the bul
Share your feedback