ASX: AR3 29 October 2025
Quarterly Activities Report
For thethreemonths ended 30 September 2025
Highlights
Continued progress in advancing the Koppamurra Rare Earths Project
• Positive technical milestones achieved during the quarter:
o Produced ~34kg of Mixed Rare Earth Oxide (MREO) from ~1,800L of leach solution (PLS), a key
intermediate step towards producing a marketable Mixed Rare Earth Carbonate (MREC).
o Achieved 99% recovery of magnet rare earths via a low-cost, direct precipitation process using
magnesium oxide from PLS to MREO. This reinforces the potential scalability and efficiency of AR3’s
proposed process.
o Demonstrated ~98% reduction in solution volume, providing greater flexibility in downstream
processing options.
o Commenced optimisation of impurity removal and MREC precipitation to inform Pre-Feasibility
Study (PFS).
• Metallurgical testwork and Pre-Feasibility Study (PFS) progressing to de-risk production pathway and
validate flowsheet efficiency.
• Grant instalment of $1 million for the Australian Government International Partnerships in Critical Minerals
received reinforcing confidence in AR3’s execution of the grant work program.
Drilling resumed and systematic testing underway at Overland Uranium Project
• Expanded prospect area with agreement signed to acquire a further 972km2
, adjacent to existing site.
• Drilling resumed in July 2025 including:
o Fast-tracking testing of historic (1981) gamma anomalies over ~7km strike.
o Targeting ISR-amenable uranium targets on EL7001 following identification of roll-front signature.
o Systematic testing underway across high-priority targets within AR3’s expanded ~7,700km²
tenure.
Corporate
• Cash position remains strong: $4.1 million cash as at 30 September 2025:
o Funds received post quarter end include:
$614k received from the exercise of 6,137,368 options as at 27 October 2025
$617k R&D tax refund for the 2025 financial year.
o A further $3.25 million is scheduled to be received during 2026 under AR3’s $5 million Australian
Government International Partnerships in Critical Minerals program, subject to AR3 achieving
agreed milestones.
o ~20 million AR3 unlisted options with a 10-cent exercise price and expiring 30 March 2029
available for shareholders to exercise as at 27th
October 2025.
• Local and global participation by AR3 in rare earth sector events, including
o Establishing the Koppamurra Community Consultative Committee.
o Rare Earth Mines, Magnets and Motors Summit in Toronto, Canada.
o The opening of AR3’s technical partner’s , Neo Performance Materials Inc. (Neo), new rare earth
processing facility in Estonia.
o AR3 was invited to join the Austrade US Critical Minerals Delegation in Washington DC, engaging
with senior administrationofficials to advance Australia’s participation in securing critical minerals
supply chains.
o AR3 hosted an Investor Webinar to share a debrief on the above events and insights.
Engage with this announcement at the AR3 Investor Hub.
Travis Beinke, Managing Director and CEO, commented:
“The past quarter was another solid period for AR3 with significant progress across both our Koppamurra and
Overland projects.
“At Koppamurra, we advanced processing testwork with ANSTO, achieving 99% recovery of magnet rare earths
in a Mixed Rare Earth Oxide intermediate product, reinforcing the potential scalability and efficiency of our
process.
“Concurrently, we expanded our Overland Project by 972 km² and commenced systematic drilling to continue
the assessment of the project’s uranium potential.
“Internationally, AR3 was actively engaged in strategic discussions on critical minerals, including participation
in the Rare Earth Mines, Magnets and Motors Summit in Toronto and the opening of Neo’s new facility in Estonia.
These activities reflect our commitment to building a secure, sustainable supply chain for rare earths and
advancing exploration across our portfolio. And locally, we established our Koppamurra Community Consultative
Committee, a key avenue for productive and informative conversations with our local community.”
Australian Rare Earths Limited (ASX: AR3) is pleased to provide an update on progress made during the
quarter ended 30 September 2025. The Company has made strides across both the Koppamurra and the
Overland projects and had significant engagement opportunities both locally and globally.
Operational Review
Koppamurra Rare Earths Project
Following the successful approximately three-tonne bulk heap leach campaign, which achieved a 63% recovery
of magnet rare earths (MREs) in a pregnant leach solution (PLS) (ASX Release: 26 June 2025), AR3 advanced its
processing efforts by treating 1,800 litres of the PLS. This resulted in the production of approximately 34kg of
a Mixed Rare Earth Oxide (MREO) intermediate product, reinforcing the project's potential for scalable and
cost-effective rare earth production.
Testwork conducted at the Australian Nuclear Science and Technology Organisation (ANSTO) demonstrated a
99% recovery of MREs through precipitation using a batch continuous operation and a cost-effective reagent,
magnesium oxide (MgO). The process yielded a well-settled slurry, producing clear barren liquor and a filter
cake with ~68% moisture content. These results highlight significant mass reduction and rapid liquor recovery,
supporting efficient water recycling within the process flowsheet.
Key outcomes from the intermediate MREO precipitation include:
• 100% capture of terbium (Tb) and dysprosium (Dy)
• 99% capture of neodymium (Nd) and praseodymium (Pr)
• Partial rejection of impurities such as magnesium (Mg) and iron (Fe)
This intermediate processing step has proven effective in concentrating rare earths while reducing solution
volumes by approximately 98%. This substantial volume reduction enables greater flexibility in downstream
processing, including Impurity Removal (IR) and Mixed Rare Earth Carbonate (MREC) precipitation, while also
minimising equipment size and operational complexity.
AR3 is now progressing with re-dissolution and impurity removal testwork to refine the MREO into a high-
quality MREC. This product is being developed to meet specifications outlined by AR3’s technical partner, Neo
Performance Materials Inc. (Neo), which has a non-binding Memorandum of Understanding (MoU) for 50% of
the offtake from Phase 1 of the Koppamurra project.
Next steps
• Impurity Removal: Optimisation of MREO re-dissolution and impurity removal (e.g., aluminium, iron,
silica).
• MREC Precipitation: Further testwork to evaluate precipitation conditions (pH, temperature, residence
time) for a marketable MREC product.
Figure 1: Sample of MREO Filter Cake from PLS precipitation
Figure 2: ~30kg of MREO Filter Cake from PLS precipitation
Community engagement on Koppamurra Project
AR3 continues to play an active role in the Limestone Coast community, driven by a vision to establish a new
industry in an environmentally sensitive way that creates local jobs and attracts investment. This initiative
looks to not only benefit South Australia and the local community but also contributes to securing Australia’s
supply of critical minerals essential for the clean energy transition and a variety of applications in modern
industry.
Five years ago, AR3 started a conversation with the local community. During the quarter the Company
advanced the maturity of its community conversations to the next level with the establishment of the
Koppamurra Community Consultative Committee which will continue this conversation in a formalised way.
Information and updates will continue to be shared with the community and questions addressed as we
progress our environmental, social, economic and feasibility studies.
Overland Uranium Project
During the September quarter, AR3 recommenced drilling at its Overland Uranium project in South Australia,
targeting surficial calcrete and roll-front uranium prospects. The program builds on earlier results indicating
ISR-amenable mineralisation and includes follow-up of historic gamma anomalies identified in 1981. With the
recent acquisition of EL6895, AR3’s total tenure now spans ~7,700 km² following the expansion of the prospect
by a further 972 km2
.
The drilling program planned to run from July to October 2025 will provide systematic testing across high-
priority targets following up surficial calcrete and roll-front targets.
Figure 3: Air Core drilling at EL 6895.
Figure 4: Overland Project area and new EL6895.
Northern Queensland Rare Earths Projects
No significant exploration activities were conducted over the Company’s Queensland projects during the
reporting period.
Financial Update
AR3 completed the quarter with $4.1 million in cash as at 30 September 2025 including the $1 million
Australian Government International Partnerships in Critical Minerals (IPCM) grant instalment received. This
takes the total IPCM grant receipts now received to $1.75 million. A further $3.25 million is scheduled for
2026 under AR3’s $5 million IPCM grant.
Additionally, post quarter end, the Company received $1.23 million from a R&D tax refund ($617k) and the
exercise of unlisted options ($614k).
Corporate Update
During the September quarter, the Company participated in several key international industry events,
reinforcing its position as an emerging supplier of rare earths and hosted an investor webinar to share a
debrief on the events and insights (https://ar3.com.au/webinars/2P25Gr-ar3-investor-webinar).
CEO and Managing Director, Travis Beinke and Chairman, Angus Barker both attended the Rare Earth Mines,
Magnets and Motors 2025 Executive Summit in Toronto, Canada (22–24 September). The summit focused on
supply chain resilience, market dynamics, and technological applications in robotics, electric vehicles, and
advanced air mobility.
Travis also attended the official opening of Neo Performance Materials’ new rare earth processing facility in
Estonia, a significant development in European downstream capacity.
Chairman Angus Barker represented AR3 on Austrade’s US Critical Minerals Delegation to Washington DC and
New York, focused on critical minerals policy and international collaboration.
These engagements support AR3’s strategic objective to supply responsibly sourced, high-quality rare earth
feedstocks to global markets. The Company continues to advance the Koppamurra Rare Earths Project, with a
focus on scalable production and downstream integration.
Photos - Top Left: CEO, Travis Beinke speaking at the Adamas Conference; Toronto, Canada. Top Right: NEO
Performance Materials Magnet Plant Opening; Narva, Estonia. Bottom: Chairman Angus Barker part of the
Austrade US Critical Minerals Delegation; Washington DC, USA.
Additionally, AR3 received confirmation from the South Australian Department for Energy and Mining that its
authorised investigation into drill hole decommissioning compliance is now closed, with all requirements
satisfactorily met.
Listing Rule 5.23 Disclosure
The Company confirms that it is not aware of any new information or data that materially affects the
Exploration Results and/or the estimates of Mineral Resources in this release, and in respect of the estimates
of Mineral Resources reported, that all material assumptions and technical parameters underpinning the
estimates continue to apply and have not changed.
List of Tenements
Tenement Location Commodity Project Jurisdiction
EL6509 Naracoorte Rare Earths Koppamurra SA
EL6613 Frances Rare Earths Koppamurra SA
EL6690 Keith Rare Earths Koppamurra SA
EL6691 Bordertown Rare Earths Koppamurra SA
EL6942 Wattle Range Rare Earths Koppamurra SA
EL6943 Tarpeena Rare Earths Koppamurra SA
EL007254 Apsley Rare Earths Koppamurra Victoria
EL007719 Minimay Rare Earths Koppamurra Victoria
EL008208 Lake Mundi Rare Earths Koppamurra Victoria
EL008254 Dartmoor Rare Earths Koppamurra Victoria
EL008435 Charam Rare Earths/HMS Koppamurra Victoria
EMP27952 Massie Creek Rare Earths Massie Creek QLD
EMP28169 Stones Creek Rare Earths Dalrymple QLD
EMP28168 Mt Wickham Rare Earths Dalrymple QLD
EMP28165 Riverside Rare Earths Dalrymple QLD
EPM28167 Burdekin Rare Earths Dalrymple QLD
EPM28166 Dalbeg Rare Earths Dalrymple QLD
EMP28872 Forty Mile Scrub Rare Earths Kennedy QLD
EPM28901 Sandy Tate Rare Earths Kennedy QLD
EPM28902 Oaky Valley Rare Earths Kennedy QLD
EL7005 Sturt Vale Uranium Overland SA
EL7001 Warnes Uranium Overland SA
EL7003 Bunyung Uranium Overland SA
EL7055 Sturt Vale Uranium Overland SA
EL6678* Warnes Area Uranium Overland SA
EL6895^ Stockyard Plain Uranium Overland SA
EL7010 Wirrealpa Uranium Triggs Bore SA
EL7011 Moolawatana Uranium Hamilton Creek SA
1 – All tenements are 100% held by AR3 unless noted. *EL is in the process of being transferred to AR3 with AR3 holding the sedimentary
hosted mineralisation right. ^ Refer to ASX announcement 10 July 2025 regarding the acquisition of EL6895 with the transfer to AR3
subject to Ministerial consent pursuant to section 15AB of the Mining Act.
Capital Structure as at 30 September 2025
Shares on issue: 212,982,244 fully paid ordinary shares.
Options on issue: 36,212,408 unlisted options, comprising:
• 1,750,000 exercisable at $0.50 and expiring on 2 December 2025
• 500,000 exercisable at $0.47 and expiring on 28 February 2026
• 1,500,000 exercisable at $0.37 and expiring on 26 November 2026
• 1,500,000 exercisable at $0.50 and expiring on 26 November 2026
• 1,550,000 exercisable at $0.50 and expiring on 2 December 2026
• 1,500,000 exercisable at $0.4739 and expiring on 20 December 2026
• 1,808,333 exercisable at $0.435 and expiring on 26 November 2027
• 26,104,075 exercisable at $0.10 and expiring on 30 March 2029 (unless accelerated)
Appendix 5B Disclosures
AR3’s accompanying Appendix 5B (quarterly Cashflow Report) includes an amount in item 6.1 which
constitutes executive remuneration and non-executive director fees for the quarter.
During the period, the Company spent approx. $1,702,352 on exploration activities, including direct costs
associated with the Koppamurra exploration and development programs, which included, drilling, geochemical
assays, metallurgical test work. This figure also includes allocation of wages directly attributed to specific
exploration and development activities.
The announcement has been authorised for release by the Board of Australian Rare Earths Limited.
For further information please contact:
Australian Rare Earths Limited Media Enquiries
Travis Beinke Jessica Fertig
Managing Director and CEO Tau Media
T: 1 300 646 100 E: info@taumedia.com.au
We encourage shareholders and followers to ask any questions at the AR3 investor hub
About Australian Rare Earths Limited
Australian Rare Earths (AR3) is an emerging diversified critical minerals company, strategically positioned to meet the growing global
demand for uranium and rare earth elements:
• AR3's Koppamurra Rare Earths Project in South Australia and Victoria is a significant deposit of light and heavy rare earths, which
has secured important Australian government support through a $5 million grant to accelerate development. With support from
global advanced industrial materials manufacturer, Neo Performance Materials, AR3 is progressing toward a Pre-Feasibility Study
and a demonstration facility, solidifying its role in diversifying global rare earth supply chains for the clean energy transition.
• AR3’s large ~7,700 km² Overland Uranium Project in South Australia shows strong uranium discovery potential, with initial drilling
identifying opportunities for substantial near-surface and deeper deposits.
With strategic projects and strong government support, AR3 is poised for significant growth in the critical minerals market.
Rule 5.5
ASX Listing Rules Appendix 5B (17/07/20) Page 1
+ See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Australian Rare Earths Limited
ABN Quarter ended (“current quarter”)
73 632 645 302 30 September 2025
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(3 months)
$A’000
1. Cash flows from operating activities
6 6
1.1 Receipts from customers
1.2 Payments for
- -
(a) exploration & evaluation
(b) development - -
(c) production - -
(d) staff costs - net of allocations to
capitalised exploration assets
(290) (290)
(e) administration and corporate costs (175) (175)
1.3 Dividends received (see note 3)
1.4 Interest received 42 42
1.5 Interest and other costs of finance paid -
1.6 Income taxes paid -
1.7 Government grants and tax incentives –
R&D Tax incentive
-
1.8 Other (provide details if material) - -
1.9 Net cash from / (used in) operating
activities
(417) (417)
2. Cash flows from investing activities
-
2.1 Payments to acquire or for:
(a) entities
(b) tenements -
(c) property, plant and equipment
(d) exploration & evaluation (1,702) (1,702)
(e) investments - -
(f) other non-current - -
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 2
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(3 months)
$A’000
2.2 Proceeds from the disposal of:
- -
(a) entities
(b) tenements - -
(c) property, plant and equipment - -
(d) investments - -
(e) other non-current assets - -
2.3 Cash flows from loans to other entities - -
2.4 Dividends received (see note 3) - -
2.5 Other (provide details if material) 1,050 1,050
2.6 Net cash from / (used in) investing
activities
(652) (652)
3. Cash flows from financing activities
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2 Proceeds from issue of convertible debt
securities
3.3 Proceeds from exercise of options 100 100
3.4 Transaction costs related to issues of equity
securities or convertible debt securities
3.5 Proceeds from borrowings - -
3.6 Repayment of borrowings - -
3.7 Transaction costs related to loans and
borrowings
- -
3.8 Dividends paid - -
3.9 Other (provide details if material) (39) (39)
3.10 Net cash from / (used in) financing
activities
61 61
4. Net increase / (decrease) in cash and
cash equivalents for the period
4.1 Cash and cash equivalents at beginning of
period
5,101 5,101
4.2 Net cash from / (used in) operating
activities (item 1.9 above)
(417) (417)
4.3 Net cash from / (used in) investing activities
(item 2.6 above)
(652) (652)
4.4 Net cash from / (used in) financing activities
(item 3.10 above)
61 61
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 3
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(3 months)
$A’000
4.5 Effect of movement in exchange rates on
cash held
- -
4.6 Cash and cash equivalents at end of
period
4,093 4,093
5. Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1 Bank balances 3,889 4,907
5.2 Call deposits - -
5.3 Bank overdrafts - -
5.4 Other (Term Deposits) 194 194
5.5 Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
4,093 5,101
6. Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1 Aggregate amount of payments to related parties and their
associates included in item 1
* The payments disclosed here relate to fees and salaries paid to
all Directors (including Managing Director) during the quarter.
117
6.2 Aggregate amount of payments to related parties and their
associates included in item 2
-
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 4
+ See chapter 19 of the ASX Listing Rules for defined terms.
7. Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1 Loan facilities - -
7.2 Credit standby arrangements - -
7.3 Other (please specify) - -
7.4 Total financing facilities - -
7.5 Unused financing facilities available at quarter end
7.6 Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8. Estimated cash available for future operating activities $A’000
8.1 Net cash from / (used in) operating activities (item 1.9) (417)
8.2 (Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(1,702)
8.3 Total relevant outgoings (item 8.1 + item 8.2) (2,199)
8.4 Cash and cash equivalents at quarter end (item 4.6) 4,093
8.5 Unused finance facilities available at quarter end (item 7.5) -
8.6 Total available funding (item 8.4 + item 8.5) 4,093
8.7 Estimated quarters of funding available (item 8.6 divided by
item 8.3)
1.86 quarters
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8 If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1 Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: Yes, it is anticipated similar levels of expenditure will continue.
8.8.2 Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: The Company received R&D rebates totalling $617k in October and ongoing
Options conversions with $614k received as at 27/10/25.
8.8.3 Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: Yes
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 5
+ See chapter 19 of the ASX Listing Rules for defined terms.
Compliance statement
1 This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2 This statement gives a true and fair view of the matters disclosed.
Date: ......29 OCTOBER 2025.............................................................................
Authorised by: ..........By the Board.........................................................................
(Name of body or officer authorising release – see note 4)
Notes
1. This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2. If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3. Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4. If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
[name of board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a
disclosure committee, you can insert here: “By the Disclosure Committee”.
5. If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and
Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial
records of the entity have been properly maintained, that this report complies with the appropriate accounting standards
and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a
sound system of risk management and internal control which is operating effectively.
Share your feedback
Discover