AR3 advances Koppamurra with pilot-scale processing at ANSTO
Released
Released
Announcement PDF
1 December 2025
AR3 advances Koppamurra with pilot-
scale processing at ANSTO’s new
facility
Highlights:
• Strategic First-Mover Advantage: AR3 to be the first industry partner to access ANSTO’s new
pilot-scale rare earth processing facility, not only saving time and money in advancing the
Koppamurra Project but also positioning the Company at the forefront of Australia’s emerging
group of ionic clay-hosted rare earths producers.
• Accelerating Commercial Pathway: Pilot-scale operations to process ~25 tonnes of Koppamurra
ore producing ~35kg of Mixed Rare Earth Carbonate (MREC) — a key step toward scaling
operations and future production.
• Government-Backed Funding: Pilot program co-funded under AR3’s $5 million Australian
Government grant from the International Partnerships in Critical Minerals Program.
• De-Risking Project Development: Enables validation of Koppamurra’s full process flowsheet,
real-time process optimisation, and generation of engineering data critical for feasibility and
design.
• Offtake Readiness: Production of MREC samples for testing and qualification by potential offtake
and strategic partners, supporting Koppamurra’s transition to binding commercial agreements.
• Strengthening Australia’s Sovereign Capability: Collaboration with ANSTO advances a
domestic rare earth supply chain aligned with the Future Made in Australia initiative and the
Australian Critical Minerals Strategy.
• Clear Development Timeline: Koppamurra Pre-Feasibility Study on track, with pilot operations
scheduled for Q2 2026 and commencement of Definitive Feasibility Study to follow later in 2026.
• Engage with this announcement at the AR3 investor hub.
AR3 Managing Director and CEO, Travis Beinke, said:
“We are delighted and honoured to be the first industry collaborator to access ANSTO’s new world-
class pilot-scale rare earth processing facility in Sydney. This partnership deepens our long-standing
commercial research collaboration with ANSTO and will fast-track Koppamurra’s transition from
laboratory to pilot-scale operations.
Our rapid progress is in no small part due to the foresight of the Australian Government in recognising
that Koppamurra could be in the vanguard of new heavy rare earths supply options for the global
supply chain through the International Partnerships in Critical Minerals program twelve months ago,
well ahead of China’s imposition of rare earth export controls on Dysprosium and Terbium.
By leveraging ANSTO’s niche expertise and advanced infrastructure, AR3 is building sovereign rare
earth capability – a cornerstone in Australia’s ambitions to develop secure and sustainable magnet
rare earth supply chains for renewable energy, electric mobility, and defence applications.
This initiative directly supports the Future Made in Australia framework and advances the Australian
Government’s Critical Minerals Strategy, with clear alignment to national economic and strategic
priorities.”
ANSTO CEO, Shaun Jenkinson commented:
“ANSTO is looking forward to deploying its new pilot facilities in support of the Koppamurra project; a
textbook example of undertaking applied research and development that will increase national
economic resilience. ANSTO’s bespoke rare earth processing capabilities, supported by the Australian
Critical Minerals R&D Hub, a collaboration with Geoscience Australia and CSIRO, will allow us to
accelerate the development of Australia’s rare earth resources in the emerging cohort of ionic clay and
clay hosted rare earth projects.”
Australian Rare Earths Limited (ASX: AR3) (“AR3” or “the Company”) is pleased to announce that
it will be the first industry partner to use the Australian Nuclear Science and Technology Organisation’s
(ANSTO’s) new continuous pilot-scale rare earth processing facility, currently under construction and
scheduled to commence operations in Q2 2026.
This collaboration represents a major strategic milestone for AR3, positioning the Company to
accelerate development of its flagship Koppamurra Ionic-Clay Rare Earth Project and advance
towards commercial-scale production.
By using ANSTO’s new facility it negates the need for the Company to construct its own pilot plant,
reducing risk and saving the Company both time and money in Koppamurra’s development journey.
Pilot Plant Overview
ANSTO’s new facility provides pilot-scale capability that will enable AR3 to bridge the gap between
laboratory testing and full-scale operations — a key step in de-risking project execution and validating
process scalability.
Once commissioned, the facility will process approximately 25 tonnes of Koppamurra ore generating
around 35 kilograms of Mixed Rare Earth Carbonate (MREC) for downstream testing and potential
offtake engagement.
Importantly,thepilotplant programis co-funded through the AR3’s $5 milliongrant fromthe Australian
Government’s International Partnerships in Critical Minerals Program, reinforcing national support for
domestic rare earth supply chain development and international collaboration.
Pilot Plant Objectives
The pilot-scale campaign will deliver critical technical and commercial outcomes:
• Improve operational certainty: Provide the technical data necessary to finalise and validate
the full Koppamurra process flowsheet, ensuring strong confidence in design, performance
and scalability.
• Optimise operating parameters in real time: Enable real-time process optimisation to
validate reagent efficiency, input requirements, operating costs and overall system
performance.
• Produce MREC samples for offtake negotiations: Generate approximately 35 kg of MREC for
marketing to potential offtake partners, supporting AR3’s strategy to progress binding
commercial arrangements for future production.
• Validate AR3’s flowsheet at pilot scale: Operate a continuous pilot-scale plant to test AR3’s
full flowsheet — from heap leaching through to MREC production — in an integrated system.
• Support engineering and commercialisation studies: Generate key engineering datasets —
including water balance, reagent consumption and residue characteristics — for
incorporation into feasibility studies and commercial design.
Next Steps
• Pre-Feasibility Study (PFS) for Koppamurra remains on track for completion ahead of pilot
plant commissioning.
• Results from pilot-scale operations will directly inform the Definitive Feasibility Study (DFS),
anticipated to commence in late 2026.
• AR3 will continue to work closely with ANSTO through construction and commissioning,
updating shareholders as key milestones are achieved.
The pilot plant campaign represents a transformational step toward commercialisation, generating
the data, product samples, and confidence necessary to secure potential offtake agreements and
underpin full-scale project financing.
The announcement has been authorised for release by the Board of Australian Rare Earths Limited.
For further information please contact:
Australian Rare Earths Limited Media & IR Enquiries
Travis Beinke Jessica Fertig
Managing Director and CEO Tau Media
T: 1 300 646 100 E: info@taumedia.com.au
Engage and Contribute at the AR3 investor hub: https://investorhub.ar3.com.au
Competent Person’s Statement
Theinformationin this report that relates tometallurgicalresults is basedon information compiledby AustralianRareEarths Limited
and reviewed by James Davidson who is the principal Metallurgist of Rendement and is a Fellow of the AusIMM. Mr Davidson has
sufficient experience that is relevant to the metallurgical testing which was undertaken to qualify as a Competent Person as defined
in the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr
Davidsonconsents to theinclusioninthis reportofthematters basedon this informationin theform andcontext inwhichitappears.
About Australian Rare Earths Limited
Australian Rare Earths (AR3) is an emerging diversified critical minerals company, strategically positioned to meet the growing global
demand for uranium and rare earth elements:
• AR3's Koppamurra Rare Earths Project in South Australia and Victoria is a significant deposit of light and heavy rare earths, which
has secured important Australian government support through a $5 million grant to accelerate development. With support from
global advanced industrial materials manufacturer, Neo Performance Materials, AR3 is progressing toward a Pre-Feasibility
Study and a demonstration facility, solidifying its role in diversifying global rare earth supply chains for the clean energytransition.
• AR3’s large~8,000km²Overland Uranium ProjectinSouthAustraliashows strong uranium discoverypotential, withinitialdrilling
identifying opportunities for substantial near-surface and deeper deposits.
With strategic projects and strong government support, AR3 is poised for significant growth in the critical minerals market.
Share your feedback
Discover