Australian Rare Earths Limited (ASX: AR3) is pleased to be presenting at the Tribeca Future Facing
Symposium 2026, taking place from 25-26th August in Singapore.
Managing Director & CEO Travis Beinke will present at 3.35pm on Tuesday, 25th August, providing an
update on the Company’s progress at the Koppamurra Rare Earths Project, alongside developments at the
Overland Uranium Project and broader growth strategy.
The conference brings together global investors, companies and industry leaders focused on critical
minerals, energy transition and deep technology. The Company looks forward to engaging with investors,
industry peers and stakeholders throughout the conference program.
A copy of the presentation is provided below.
Approved for release by the Board.
For further information please contact:
Australian Rare Earths Limited Media Enquiries
Travis Beinke Jessica Fertig
Managing Director and CEO Tau Media
T: 1 300 646 100 E: jessica@taumedia.com.au
We encourage shareholders and followers to ask any questions here: https://ar3.com.au/link/PmEGaP
About Australian Rare Earths Limited
Australian Rare Earths (AR3) is an emerging diversified critical minerals company, strategically positioned to meet the growing global
demand for uranium and rare earth elements. The Company’s vast ~7,000 km² Overland Uranium Project in South Australia shows
strong uranium discovery potential, with initial drilling identifying opportunities for substantial near-surface and deeper deposits.
Simultaneously, AR3's Koppamurra Rare Earths Project in South Australia and Victoria has secured important government support
through a $5 million grant to accelerate development. With support from global advanced industrial materials manufacturer, Neo
Performance Materials, AR3 is progressing toward a Pre-Feasibility Study and a demonstration facility, solidifying its role in
diversifying global rare earth supply chains for the clean energy transition. With strategic projects and strong government support,
AR3 is poised for significant growth in the critical minerals market.
AR3 | Tribeca Future Facing Symposium | August 2026 1
Koppamurra: A new Australian
source of Rare Earths
Tribeca Future Facing Symposium
AUGUST 2026
ASX: AR3
Disclaimer & Important Information
The information in this announcement is in summary form and does not purport to be complete nor does it contain all the information in relation to the Company. It should be read in conjunction with the Company's other periodic and continuous disclosure announcements lodged with the ASX at www.asx.com.au.
The Company does not purport to give financial or investment advice. No account has been taken of the objectives, financial situation or needs of any recipient of this document. The information in this announcement does not take into account the investment objectives, financial situation or needs of any recipient and does not constitute financial
product advice. To the fullest extent permitted by law, the Company and its associates or any of its directors, agents, officers or employees do not make any representations or warranties, express or implied, as to the accuracy or completeness of any information, statements, opinions, estimates, forecasts or other representations contained in this
presentation. No responsibility or liability for any errors or omissions from this presentation arising out of negligence or otherwise is accepted. Each party to whom this announcement is made available must make its own independent assessment of the Company and the announcement after making such investigations and taking such advice as may
be deemed necessary. Any reliance placed on the announcement is strictly at the risk of such person relying on such announcement.
All references to $ in this announcement are to Australian dollars unless stated otherwise.
Some of the statements contained in this announcement are forward-looking statements. Forward looking statements include but are not limited to, statements concerning estimates of expected costs, statements relating to the advancement of the Company’s investments and other statements which are not historical facts. Although the Company
believes that its expectations reflected in the forward-looking statements are reasonable, such statements involve risk and uncertainties, and no assurance can be given that actual results will be consistent with these forward-looking statements. Various factors could cause actual results to differ from these forward-looking statements include the
potential that the Company’s projects may experience technical, geological, metallurgical and mechanical problems, changes in product prices and other risks not anticipated by the Company or disclosed in the Company’s published material.
The Pre-Feasibility Study referred to in this announcement is a preliminary technical and economic assessment of the potential viability of producing a mixed rare earth oxide (MREO) product to support Mineral Resources and Ore Reserve of the Koppamurra Project. Those estimates have been prepared by a competent person in accordance with JORC
Code 2012 and all production targets are based on those Mineral Resources and Ore Reserves and all material assumptions relating to those production targets and related forecast financial information are set out in the relevant market announcement (ASX announcement dated 25 June 2026).
The production targets, related forecast financial information and other forward-looking statements referred to are based on information available to the Company at the time of release and should not be solely relied upon by investors when making investment decisions. Material assumptions and other important information are contained in this
announcement. The Company cautions that mining and exploration are high risk and subject to change based on new information or interpretation, commodity prices or foreign exchange rates. Actual rates may differ materially from the results or production targets contained in this presentation. Further evaluation is required prior to a decision to
conduct mining being made.
Mineral Resource and Ore Reserve estimates are necessarily imprecise and depend on interpretations and geological assumptions, minerals prices, cost assumptions and statistical inferences (and assumptions concerning other factors, including mining, processing, metallurgical, infrastructure, economic, marketing, legal, environmental, social and
governmental factors) which may ultimately prove to be incorrect or unreliable. Mineral Resource and Ore Reserve estimates are regularly revised based on actual exploration or production experience or new information and could therefore be subject to change. In addition, there are risks associated with such estimates, including (among other risks)
that minerals mined may be of a different grade or tonnage from those in the estimates and the ability to economically extract and process the minerals may become compromised or not eventuate. The Company’s plans, including its mine and infrastructure plans, and timing, for the Project, are also subject to change. Accordingly, no assurances can
be given that the production targets, financial forecasts, other forecasts or other forward-looking statements or information will be achieved.
To achieve the development outcomes outlined in this announcement, AR3 estimates that funding of at least A$178 million will be required. There is no certainty that AR3 will be able to raise the required funding when needed, and any such funding may only be available on terms that may be dilutive or otherwise adversely affect shareholders.
Cautionary Statement
The Pre-Feasibility Study (“PFS” or “Study”) referred to in this presentation has been undertaken by Australian Rare Earths (“AR3” or the “Company”) in conjunction with various independent consultants, to determine the viability of the development at the Koppamurra Rare Earths Project in South Australia (“Project” or the “Koppamurra Project”). The
PFS is based on technical and economic assessments of a level of accuracy commensurate with a prefeasibility study.
The total Life of Mine Production Target (and forecast financial information derived from the Production Target) referred to in this announcement is underpinned by approximately 71% by Probable Ore Reserves and the remaining approximately 29% by Inferred Mineral Resources and have been prepared by Competent Persons in accordance with the
requirements of the JORC Code (2012).
There is a low level of geological confidence associated with Inferred Mineral Resources and there is no certainty that further exploration work will result in the determination of Indicated Mineral Resources or that the Production Target itself (or the forecast financial information) will be realised.
The Company has satisfied itself that the Inferred Mineral Resources included in the Life of Mine Production Target are not the determining factor in project viability. The Project economics modelled without any Inferred Resources and only based on Ore Reserves retains a robust Post-Tax NPV8 of $652 million. The Inferred Mineral Resources included
in the Life of Mine Production Target are allocated across the 12 year mine life with an average of 23% Inferred Mineral Resource across the first 10 years ranging from 2% to 33%. The expected payback period for the Koppamurra Project is less than one year.
The Life of Mine Production Target and associated forecast financial information are based on assumptions and modifying factors which may prove to be inaccurate, and there is no certainty that the forecast outcomes will be achieved.
The Company confirms that the Ore Reserves estimates, and Mineral Resources estimates have been prepared by Competent Persons in accordance with the requirements of the JORC Code.
This presentation has been prepared in compliance with the JORC Code 2012 Edition (JORC 2012) and the ASX Listing Rules. All material assumptions on which Life of Mine Production Target and the forecast financial information have been provided in the relevant market announcement (ASX announcement dated 25 June 2026) and outlined in the
JORC 2012 table 1 disclosures in the ASX release “Maiden Ore Reserves positions Koppamurra for development” 25 June 2026.
This document contains forward-looking statements, including statements regarding production targets, forecast financial information, development plans and project economics.
Forward-looking statements are subject to risks, uncertainties and assumptions, many of which are outside the control of the Company. These include, but are not limited to, commodity prices, exchange rates, regulatory approvals, funding availability and operating performance.
While the Company considers all the material assumptions to be based on reasonable grounds, there is no certainty that they will prove to be correct or that the production target or estimated outcomes indicated by the PFS (such as the financial forecasts) will be achieved. The production target and estimated outcomes indicated by the PFS (such as
the financial forecasts) are also subject to various risk factors. Given the uncertainties involved and detailed in this announcement, investors should not make any investment decision based solely on the results of the PFS.
Competent Persons Statements
The information in this report that relates to metallurgical results is based on information compiled by Australian Rare Earths Limited and reviewed by Mr. James Davidson who is the principal Metallurgist of Rendement and is a Fellow of the Australian Institute of Mining and Metallurgy (AusIMM). Mr. Davidson has sufficient experience that is relevant to
the metallurgical testing which was undertaken to qualify as a Competent Person as defined in the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr. Davidson consents to the inclusion in this report of the matters based on this information in the form and context in which it appears.
The information in this report that relates to Exploration results and the Exploration Target is based on information compiled by Australian Rare Earths Limited and reviewed by Mr. Rick Pobjoy who is the Chief Technical Officer of the Company and a member of the Australian Institute of Mining and Metallurgy (AusIMM). Mr. Pobjoy has sufficient
experience that is relevant to the style of mineralisation, the type of deposit under consideration and to the activities undertaken to qualify as a Competent person as defined in the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr. Pobjoy consents to the inclusion in this report of the
matters based on this information in the form and context in which it appears.
The Company confirms that it is not aware of any new information or data that materially affects the Mineral Resource estimate, Exploration Target or Ore Reserve information included in the relevant market announcement (ASX announcement dated 25 June 2026) and that all material assumptions and technical parameters underpinning the
estimates in the relevant market announcement (ASX announcement dated 25 June 2026) continue to apply and have not materially changed. The company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcement (ASX announcement dated
25 June 2026).
Information in this Presentation is Extracted from the ASX Announcements Titled:
• “Quarterly Activities Report” 31 July 2026
• “10Km Magnetic Corridor Expands Niobium-REE Targets” 23 July 2026
• “Niobium-Rare Earth Carbonatite System Identified at Overland” 8 July 2026
• “Pre-Feasibility Study and maiden Ore Reserve confirm Koppamurra as a compelling project” 25 June 2026
All announcements are available on www.ar3.com.au.
2
Important Information and Disclaimer
AR3 | Tribeca Future Facing Symposium | August 2026
• “Maiden Ore Reserve positions Koppamurra for development” 25 June 2026
• “Koppamurra test work produces high purity Mixed Rare Earth Oxide” 20 January 2026
• “Koppamurra Project achieves regulatory milestone” 2 December 2025
• “AR3 advances Koppamurra with pilot-scale processing at ANSTO’s new facility” 1 December 2025
Investment Highlights
3
Compelling economics
A$858m After-Tax NPV8; 99% IRR; ~1 yr payback
Highly attractive product
High-value MREO basket with exposure to
constrained heavy REE markets; including rare
earths increasingly critical to global supply chains
Long-term optionality beyond the PFS
Maiden Ore Reserve with initial 12-year mine life
and potential to support a multi-decade operation
as resources convert and the project scales
Capital-light development
A$178 million with capital efficiency ratio of 4.8;
supporting rapid capital payback and attractive
capital efficiency
Low technical risk
Shallow open pit, simple heap leach and rapid
progressive rehabilitation — no drill-blast, no
tailings dam, unlike many hard-rock REE peers
Tier-1 Australian jurisdiction
Global target customers — including Japan,
South Korea, Malaysia, U.S.A. and Europe —
seeking heavy rare earth feedstock that Australia
can deliver with speed and security
AR3 | Tribeca Future Facing Symposium | August 2026
A capital-efficient Australian rare earths opportunity: Strong project economics and strategic
exposure to constrained heavy rare earth markets
Long term price floors: A
structural shift in Western
REE supply
Governments are locking in long-term price certainty to
build Western supply chains with scale, security and
structured pricing mechanisms
4
Australia Critical Minerals Strategic Reserve
Expected to be underpinned by national offtake agreements including rare earths.
MP Materials
Announced: July 2025
Price Floor
$110/kg
NdPr
MP Materials and the U.S. Department of Defense (DoD)
entered a 10-year, $110/kg minimum price floor agreement
for neodymium-praseodymium (NdPr) in July 2025 to
secure rare earth magnet independence.
Lynas Rare Earths
Announced: March 2026
Price Floor
$110/kg
NdPr
Lynas Rare Earths has signed a long-term, restructured
supply agreement with Japan Australia Rare Earths (JARE)
extending until 2038. The deal ensures a minimum price of
USD $110/kg for 5,000 tonnes per year of NdPr oxide,
guaranteeing supply for Japan and providing price stability
for Lynas, with an upside-sharing mechanism for prices
above $150/kg.
USA Rare Earths / Serra Verde
Announced: April 2026
Price Floor
$110/kg NdPr
$575/kg Dy
$2,050/kg Tb
NdPr · Dy · Tb
USA Rare Earth has agreed to acquire Serra Verde Group for
$2.8 billion, securing a 15-year, 100% offtake for its Pela
Ema mine production in Brazil. The deal includes
guaranteed price floors for magnetic rare earths NdPr, Dy,
and Tb, backed by U.S. government agencies, enhancing
Western supply chain independence.
AR3 | Tribeca Future Facing Symposium | August 2026
Compelling
Economics
5
After-tax NPV₈ of A$858M and 99% IRR
on A$178M initial capital
A capital efficiency ratio of 4.8x,
highlighting strong value creation
relative to initial development capital.
A$1.4 B cumulative post tax cashflow
Price Floor Scenario remains robust at
After-tax NPV₈ of A$635M and 83% IRR
A$858M
Post-Tax NPV₈
99%
Post-Tax IRR
0.9 Yrs
Post-Tax Payback
A$178M
Initial CAPEX
12 Years
Initial Life of Operation
1,865 t/yr TREO
Average Annual TREO Production
(incl. 438t NdPr, 57t Dy and Tb, 237t Y, 69t Sm, 76t Gd)
US$38.32/kg TREO
All-In Sustaining Cost (C1 US$34.14/kg ex-royalties)
AR3 | Tribeca Future Facing Symposium | August 2026
Project Value vs.
Current Market Capitalisation
6
Koppamurra’s completed PFS delivers an A$858m post-tax NPV₈,
compared with AR3’s current market capitalisation of ~A$28m.
Highlighting a substantial disconnect between project economics and
current equity value even after risk adjusting for project development stage.
A$858M
Post-Tax NPV₈
A$28M
Market Cap*
~0.03x
Market Cap / NPV
AR3 | Tribeca Future Facing Symposium | August 2026
A rare earths development asset with PFS-level economics not yet reflected in the company’s equity valuation
*Market capitalisation based on $0.11 share price (256.1m shares on issue).
Project Overview: Established Regional
Infrastructure and Favourable Location
7
Scale/Size 7,400sqm
Ownership 100%
Maiden Ore Reserve 26Mt @ 920ppm TREO Magnet Rare Earth ~26% of TREO including strategically valuable heavy
REE’s dysprosium & terbium ~3%; along with yttrium, gadolinium, samarium and lutetium, now
subject to China's expanded export controls
Mineral Resource 243Mt @ 751ppm TREO and untapped Exploration Target; significant scope for a multi-decade
operation as the project scales
Offtake Neo Performance Materials (Non-binding MOU for 50% offtake of stage 1)
Location and
Jurisdiction
~300km SE of Adelaide, in South Australia and Victoria
Australia: Low political risk; South Australia: Pro-mining state
Access: Road and Port Within 8km of main highway with established road to site
Shipping via the Port of Adelaide ~380km from the project site (Or Portland) — both
established gateways for bulk exports into Asia
Workforce and
Supporting
Infrastructure
Access to skilled workforce regionally
Drive in workforce with no requirement for camp or airstrip due to project location
Water and Power Recycling of water within the process will provide for a low water consumption project; water to
be sourced from local aquifer
Either onsite solution or connection to existing infrastructure
AR3 | Tribeca Future Facing Symposium | August 2026
8
Model Birdseye View of Typical Mine Pit
Apr 2022 Aug 2024
Successful Bulk Sample Pit and Rehabilitation
Program Demonstrated in Practice
No drilling or blasting required soft, free-digging clay ore
mined with conventional open-pit methods, lowering opex
Sustainable Development Pathway
Simple low-cost mining method
Progressive rehabilitation built into the mine plan — reducing
closure liability and supporting sustainable land practices
AR3 | Tribeca Future Facing Symposium | August 2026
Investor takeaway: Lower mining complexity + no drill-and-blast + progressive rehabilitation = reduced operating and execution risk
9
Model Birdseye View of Processing Plant
Processing route delivers low capital cost,
low-complexity operations
Progressive Heap Leach and Rapid
Rehabilitation
Rare earth minerals extracted at ~pH 2.2
delivering ~68% TREO recoveries
Simple oxalic acid precipitation provides
for high rejection of impurities and
produces a high purity, high value MREO
with very low impurities
Design is scalable and efficient with
staged satellite developments
Simplifying the process to produce a
high-purity Mixed Rare Earth Oxide
AR3 | Tribeca Future Facing Symposium | August 2026
Increasing
demand in
the West
post-China
export
controls
(April 25)
Product Mix − MREO
Quality and Impurity
Removal
Limited heavy rare earth supply
options; ionic clay deposits are an
attractive source of heavy rare earths
10
REO
As oxide in oxalate
wt% Product
As oxide calcined
wt% Product
La2O3 6.32 16.3
CeO2 11.80 30.4
Pr6O11 1.71 4.4
Nd2O3 6.79 17.5
Sm2O3 1.30 3.4
Eu2O3 0.32 0.8
Gd2O3 1.29 3.3
Tb4O7 0.19 0.5
Dy2O3 1.05 2.7
Ho2O3 0.20 0.5
Er2O3 0.51 1.3
Tm2O3 0.06 0.2
Yb2O3 0.34 0.9
Lu2O3 0.05 0.1
Y2O3 6.27 16.2
TREO+Y2O3 38.2 98.6
The Magnet Rare
Earths total
~25% of TREO
“Other key heavies”
~23%
~48%
of our baskets are
highly sought and
high value
Blue = Magnetic Rare Earths
AR3 | Tribeca Future Facing Symposium | August 2026
ANSTO pilot scale
processing plant
11
Australia's First Ionic Clay Pilot at ANSTO
AR3 is the first company to access ANSTO's new pilot-scale
rare earth processing facility − a significant technical and
strategic milestone.
Advancing the Project and Customer offtake
engagement
AR3 will process ~30 tonne of material generating samples
for customer qualification and engineering data for the DFS.
Government Backed − A$5M Grant
Australian Federal Government A$5M International Partnerships
in Critical Minerals grant supporting the PFS and pilot program.
AR3 MD & CEO Travis Beinke inspecting the Pilot Plant Agglomerator at ANSTO and attending official
opening of the facility alongside Australian Resources Minister Madeleine King
AR3 | Tribeca Future Facing Symposium | August 2026
Defined Pathway to First Production:
Koppamurra Milestone Schedule
12
Project de-risking underway
A$5M Australian Government IPCM grant
Formal recognition of strategic importance
Environmental Scoping Report published
Mining Lease Application targeted 2026
✓ COMPLETED
Pre-Feasibility
Study
A$858M NPV₈ | 99% IRR
| 0.9yr payback |
A$178M CAPEX
confirmed
IN PROGRESS
Pilot Plant at
ANSTO
30t bulk sample
processing. Product
samples for customer
qualification. DFS
engineering data
2026 TARGET
Mining Lease
Application
Env. studies well
progressed. Baseline
data complete. Scoping
Report approved
2026–27 TARGET
DFS + Offtake
Discussions
DFS initiated post-PFS.
Product qualification with
strategic customers. Offtake
& project funding discussions
advance
2028
FID +
Construction
Final investment decision
following DFS, approvals,
offtake and funding.
Construction targeting first
production
Targeting first
production by 2029
AR3 | Tribeca Future Facing Symposium | August 2026
Overland: A Strategic
Second Growth Platform
Large-scale South Australian uranium exploration
exposure with an emerging niobium-rare earth discovery
14
Overland Project
Normalised Source Strength (NSS) of Total magnetic intensity (TMI), NSS reduces
anomaly distortion due to magnetic remanence. R064 is located at 3406090E,
6174702N GDA 2020 Zone 54 and was a 120mm diameter hole drilled vertically
to a depth of 71.0m
Discovery of a Niobium-Rare Earth Carbonatite System
AR3 | Tribeca Future Facing Symposium | August 2026
Carbonatite mineral systems are globally important as major sources of rare
earth elements and niobium; also known to host copper mineralisation
Initial hole intersected - 19m @ 0.61% Total Rare Earth Oxides (TREO) from 86
metres including:
• 7m @ 0.56% TREO (20% NdPr & 2.3% Dy Tb), with 0.27% Nb2O5 from 86m
• Including 1m @ 1.0% TREO with 0.53% Nb2O5 from 87m
• 3m @ 1.16% TREO (17% NdPr & 0.8% Dy Tb), from 93m
• 9m @ 0.46% TREO (22% NdPr & 1.7% Dy Tb), from 96m
Reprocessing of historic airborne magnetic survey has delineated a
significant 10km long magnetic corridor
Historic hole 3km south of OV167 sits within same magnetic corridor and
recorded a significant gamma response from 56 metres to 71 metres
Drilling to test priority targets within this extensive magnetic feature to
commence in September 2026
15
3D render of the Koppamurra Project Site
In Summary: Why AR3, Why Now?
A PFS-proven project with
early-stage market valuation
AR3 | Tribeca Future Facing Symposium | August 2026
A de-risked Australian rare earths project approaching key commercial milestones
• A completed PFS values Koppamurra at A$858M
post-tax NPV₈ versus a materially lower current
market capitalisation
• Strategic heavy rare earth exposure in a Tier-1
Australian jurisdiction
• Capital-light development pathway with PFS,
pilot-scale validation and government support
already in place
• Near-term catalysts: Mining Lease Application,
DFS, customer qualification, offtake and and
cornerstone investor conversations
Overland exploration potential with
emerging niobium-rare earth discovery
Appendices
Corporate Snapshot
Ore Reserve, Mineral Resource Estimate and Exploration Target
16
AR3 | Tribeca Future Facing Symposium | August 2026
Team and Corporate Snapshot
17
Experienced team and strong backing
Experienced company director in compliance,
governance and risk over 30 years in resources sector.
Pauline Carr | Independent Non-executive Director
Over 30 years of professional experience, including at top-tier
global investment banks and as a senior adviser to Australian
Government Ministers in key economic portfolios.
Angus Barker | Independent Chairman
Over 20 years’ experience with both Australian
and internationally listed resource companies.
Travis Beinke | Managing Director & CEO
Geologist with more 25 years’ experience in the
mining and minerals exploration industry.
Rick Pobjoy | Chief Technical Officer & Co-Founder of AR3
Capital Structure ASX ticker: AR3
Share Price (19 August 2026) $0.105
Shares on issue 256.1m
Market Capitalisation $26.9m
Liquidity
Cash (30 June 2026) $4.6m
Grant funds to be received (2026) $2.15m
Available Funding $6.75m
0m
2m
4m
6m
8m
10m
12m
14m
0
0.05
0.1
0.15
0.2
0.25
0.3
0.35
0.4
Jul 25 Aug 25 Sep 25 Oct 25 Nov 25 Dec 25 Jan 26 Feb 26 Mar 26 Apr 26 May 26 Jun 26 Jul 26 Aug 26
Volume (RHS) Close (LHS)
Distribution of shareholders
Directors, Management & Co-Founders 15%
NEO Performance Materials 1%
Acorn Capital 7%
Other 77%
Price and Volume Chart
AR3 | Tribeca Future Facing Symposium | August 2026
Maiden Ore Reserve
Targeting higher grade mineralisation to drive value
18
• Ore Reserve average grade ~22% higher than the average Mineral Resource grade to drive Project value
• High value magnet rare earths contribute ~26% of TREO
• Ore Reserves based on Southern portion of Mineral Resource only
• Significant scope for future growth
Ore Reserve
Category
Material BD TREO
TREO-
CeO2
La2O3 CeO2 Pr6O11 Nd2O3 Sm2O3 Gd2O3 Tb4O7 Dy2O3 Ho2O3 Er2O3 Eu2O3 Tm2O3 Yb2O3 Lu2O3 Y2O3 U3O8 ThO2
Mt gcm3 ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm
Proved - - - - - - - - - - - - - - - - - - - - -
Probable 26 1.6 920 602 141 324 43 167 33 32 4.5 25 4.7 13 7.6 1.6 10 1.4 125 1.4 19
Total 26 1.6 920 602 141 324 43 167 33 32 4.5 25 4.7 13 7.6 1.6 10 1.4 125 1.4 19
Ore Reserve estimation as at 25 June 2026
Tonnages and grades are rounded as appropriate and mineral assemblage is reported as parts per million.
Measured and Indicated Mineral Resources have been converted to Probable Ore Reserves only.
No Inferred Mineral Resources are included in the Ore Reserves.
Ore Reserves are a subset of Mineral Resources.
Ore Reserves are reported in accordance with the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (The Joint Ore Reserves Committee Code – JORC 2012 Edition).
Refer to ASX Release 25 June 2026 “Maiden Ore Reserve positions Koppamurra for development” for further detail.
AR3 | Tribeca Future Facing Symposium | August 2026
Mineral Resource Estimate
and Exploration Target
19
Ore Reserve
Category
Material BD TREO
TREO-
CeO2
La2O3 CeO2 Pr6O11 Nd2O3 Sm2O3 Gd2O3 Tb4O7 Dy2O3 Ho2O3 Er2O3 Eu2O3 Tm2O3 Yb2O3 Lu2O3 Y2O3 U3O8 ThO2
Mt gcm3 ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm
Measured 0.9 1.6 773 502 125 271 36 135 27 25 4 20 4 10 6 1 8 1 102 1 21
Indicated 112.7 1.6 766 502 121 264 35 135 27 26 4 20 4 10 6 1 8 1 106 2 19
Inferred 129.6 1.6 737 486 121 251 34 130 26 24 3 19 4 9 6 1 7 1 102 2 18
Grand Total 243.1 1.6 751 493 121 257 35 132 26 25 4 19 4 10 6 1 8 1 104 2 19
2026 Mineral Resource Estimate
Material Type Zone Material BD TREO TREO-CeO2 MREO Dy2O3 Tb4O7 Nd2O3 Pr6O11
Mt gcm3 ppm ppm ppm ppm ppm ppm ppm
Exploration
Target
3 650 - 3120 1.6 560 -820 360 - 540 140 - 210 15 - 20 3 - 4 100 - 150 25 - 40
4 30 - 500 1.6 420 - 690 300 - 500 110 - 190 10 - 20 2 - 3 80 - 140 20 - 40
Total 680 - 3620 1.6 540 – 820 350 - 540 140 - 210 15 - 20 3 - 4 100 - 150 25 - 40
The potential quantity and grade of the Exploration Target is conceptual in nature, as there has been insufficient exploration undertaken to estimate a
Mineral Resource and it is uncertain if further exploration will result in the estimation of a Mineral Resource.
2026 Exploration Target
AR3 | Tribeca Future Facing Symposium | August 2026
Securing the allied
world’s energy
transition metals.
20
Contact Us
Travis Beinke,
Managing Director & CEO
+1 300 646 100
Investor Relations
Tau Media
Jessica Fertig
+61 408 855 855
info@taumedia.com.au
Scan the QR code
Share your feedback
Discover