2025 drilling campaign completed at Overland Uranium Project
Released
Released
Announcement PDF
30 October 2025
2025 drilling campaign completed at
Overland Uranium Project
Highlights:
• Overland Drilling Completed: A total of 45 drill holes for 5,090 metres has been completed
under the 2025 Overland drilling program - marking the second phase of AR3’s drilling for the
year (see ASX release 28 July 2025). Since October 2024, AR3 has completed 16,316m of drilling
across 152 holes confirming consistent geological continuity and expanding the project’s
uranium footprint.
• ISR Uranium Target Identified: Recent assay, gamma, and pXRF results confirm the presence
of a permeable sand unit located beneath a clay and lignite horizon at the base of oxidation. This
defines a compelling ISR-amenable uranium target in the north-western region of EL7001.
• Strong Uranium Intercepts: Assays received to date validate down-hole gamma and in-field
pXRF readings for contained uranium, including:
o OV100 2m at 87ppm U3O8 from 69m (Figure 2)
o OV100 1m at 51ppm U3O8 from 101m
o OV101 1m at 50ppm U3O8 from 88m
o OV102 2m at 55ppm U3O8 from 71m
o OV104 1m at 64ppm U3O8 from 68m
o OV104 1m at 52ppm U3O8 from 101m
o OV105 1m at 213ppm U3O8 from 73m (Figure 3)
o OV106 1m at 59ppm U3O8 from 74m
o OV107 1m at 58ppm U3O8 from 103m
o OV122 1m at 85ppm U3O8 from 69m
o OV123 2m at 63ppm U3O8 from 70m
o OV125 1m at 116ppm U3O8 from 67m (Figure 3)
o OV126 1m at 73ppm U3O8 from 65m
o OV128 1m at 163ppm U3O8 from 77m (Figure 5)
o OV128 1m at 67ppm U3O8 from 87m
o OV129 1m at 75ppm U3O8 from 65m
o OV130 2m at 126ppm U3O8 from 70m (Figure 5)
o OV130 1m at 53ppm U3O8 from 85m
o OV131 1m at 67ppm U3O8 from 95m
• Follow-up Drilling Confirms ISR Potential: Infill drilling centred around OV105 and OV128 has
defined a permeable sand horizon returning elevated uranium values within sand and lignite units,
strengthening confidence in the continuity of ISR-amenable mineralisation (refer Figures 3, 4 &
5).
• Extensive First-Pass Drilling Coverage: Systematic drilling across AR3’s 7,700 km² tenure has
now evaluated multiple target areas, with the highest uranium grades concentrated in the north-
western corner of EL7001 (Figures 1 & 6).
• Program Review: AR3’s 2025 drilling program at Overland is now complete and geology and assay
data is being reviewed for follow up targeting and testing as part of planning for a 2026 drilling
program.
• Engage with this announcement at the AR3 investor hub.
AR3 Managing Director and CEO, Travis Beinke, said:
“The identification of a new ISR-amenable target, supported by strong assay and gamma/pXRF data,
strengthens our confidence in our Overland Project.
These results continue to build our confidence in the uranium prospectivity of the region. By
systematically targeting the most prospective zones, we are unlocking additional ISR-suitable targets
while refining our geological understanding.
With assays pending and further analysis underway, we look forward to updating shareholders as new
results become available in the coming weeks.”
Australian Rare Earths Limited (ASX: AR3) is pleased to announce the successful completion of its
2025 drilling program at the Overland Uranium Project, located within the Company’s extensive
7,700km2
exploration tenure in South Australia.
The 2025 Overland drilling program, conducted between July and October has now been successfully
completed. The program comprised 45 drill holes for a total of 5,090 metres, targeting multiple
prospective areas, including:
• a surficial calcrete-hosted target on EL6895;
• a series of fault-related and paleochannel ISR targets on EL7001, EL7003 and EL7005; and
• Extension and infill of previous ISR-amenable mineralization identified in the northwestern
corner of EL7001.
Key Results:
Of these, the ISR-amenable target in the northwest corner of EL7001 remains the most prospective
with recent results demonstrating strong potential for ISR-style uranium mineralisation across the
broader Overland area (Figure 1).
The most recent assay results from this highly prospective area have been received and include
multiple intervals with anomalous uranium which has defined a 300m wide N-S strike of uranium
mineralization across holes OV100 to OV105. Intersections include 2m at 87 ppm U3O8 from 69m in
hole OV100, 1m at 213ppm U3O8 from 73m in hole OV105, and 1m at 64ppm U3O8 from 68m in hole
OV104, indicating elevated uranium concentrations just below the base of oxidation in a thin clay and
lignite interval. Below this anomalous uranium sits a ~12m thick interval of permeable, reduced sands
(Figure 3). This trend was followed up later int the program across infill holes OV122 and OV123 which
intersected 1m at 85 ppm U3O8 from 69m and 2m @ 63ppm U3O8 from 70m respectively (Figure 4).
A second trend from this area is emerging with higher uranium grades defining a 200m wide E-W strike
of mineralization immediately below the base of oxidation within sands containing minor lignite. Holes
OV128 intersected 1m at 163ppm U3O8 from 77m and OV130 intersected 2m at 126ppm U3O8 from
70m. This trend was followed up with infill drilling across holes OV151 and OV152 which have initial
gamma anomalies across the projected zone. Assays are pending for these holes (Figure 5).
Drilling on the fault-related ISR target within EL7003 comprised several holes, including OV121 (Figure
6), designed to evaluate a structurally controlled corridor prospective for ISR-style uranium
mineralisation. Drilling was constrained by challenging ground conditions encountered at depth,
which did not allow the hole to be drilled to target depth. The area remains highly prospective, and
additional drilling is planned once an appropriate method for managing these conditions has been
implemented.
In parallel, drill testing of deep palaeochannel targets in the northeast corner of EL7005 encountered
similar challenges. The target known as AR3’s Prairie Dam paleochannel was intersected in hole
OV137 in the last 3m (175-178m) confirming the presence of the interpreted channel sequence (Figure
6). However, limitations associated with ground conditions and the Air Core drilling capability
prevented full penetration and testing of the palaeochannel. The intersection confirms the target’s
presence and defines a compelling follow-up opportunity, which will be prioritised for subsequent
drilling using more suitable drilling methods.
Drilling at the surficial calcrete-hosted target within EL6895 consisted of 13 drillholes for 661m. The
drilling failed to reproduce the significant gamma anomalism recorded from surface in historic drilling
conducted in 1981 by CRA. The surficial-calcrete hosted target on EL6895 has now been fully tested
and will not be pursued further (Figure 6).
Figure 1: Overland Uranium Project – Section location plan, inset map, showing drillhole location detail for recently completed
drillholes in the Northwest corner of EL7001.
Figure 2: Cross section through OV100 (2m at 87 ppm U3O8 from 69m) which forms the northern extent of the 300m wide
anomalous zone shown in Figure 3.
Figure 3: Section showing 300m wide anomalous zone defined by OV100 to OV105. Hole OV125 intersected 1 m at 116 ppm U₃O₈
from 67 m.
Figure 4: Infill holes OV122 (1m at 85ppm U3O8 from 69m), OV123 (2m at 63ppm U3O8 from 70m) and OV105 (1m at 213 ppm U₃O₈
from 73 m) forming part of the 300m wide anomalous zone.
Figure 5: Section showing 200m wide anomalous zone defined by OV128 (1m at 163 ppm U3O8 from 77m) and OV130 (2m at 126
ppm U3O8 form 70m). Infill holes OV151 and OV152 contain anomalous downhole gamma through the zone with assays pending for
these holes.
Figure 6: Overland drilling completed to date showing assays received and target areas tested with drilling
Next steps
• Program Review: AR3’s 2025 drilling program at Overland is now complete and geology and
assay data is being reviewed for follow up targeting and testing as part of planning for a 2026
drilling program.
• Pending Assays: Approximately 900 assays are still pending, including basement samples for
base and precious metals. Results are expected within 3-5 weeks.
• Data Analysis: AR3 continues to compile and interpret all geological and geophysical
datasets to inform subsequent exploration planning.
The announcement has been authorised for release by the Board of Australian Rare Earths Limited.
For further information please contact:
Australian Rare Earths Limited Media & IR Enquiries
Travis Beinke Jessica Fertig
Managing Director and CEO Tau Media
T: 1 300 646 100 E: info@taumedia.com.au
Engage and Contribute at the AR3 investor hub: https://investorhub.ar3.com.au
Competent Person’s Statement
The information in this report that relates to Exploration results is based on information compiled by Australian Rare Earths Limited
andreviewedby Mr Rick Pobjoywhois theChiefTechnicalOfficer of theCompanyanda memberofthe AustralianInstituteof Mining
andMetallurgy(AusIMM). Mr Pobjoyhas sufficientexperiencethatis relevanttothe style of mineralisation, thetype of depositunder
consideration and to the activities undertaken to qualify as a Competent person as defined in the 2012 edition of the “Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Pobjoy consents to the inclusion in this report
of the matters based on this information in the form and context in which it appears.
About Australian Rare Earths Limited
Australian Rare Earths (AR3) is an emerging diversified critical minerals company, strategically positioned to meet the growing global
demand for uranium and rare earth elements:
• AR3's Koppamurra Rare Earths Project in South Australia and Victoria is a significant deposit of light and heavy rare earths, which
has secured important Australian government support through a $5 million grant to accelerate development. With support from
global advanced industrial materials manufacturer, Neo Performance Materials, AR3 is progressing toward a Pre-Feasibility
Study and a demonstration facility, solidifying its role in diversifying global rare earth supply chains for the clean energytransition.
• AR3’s large~7,700km²Overland Uranium ProjectinSouthAustraliashows strong uranium discoverypotential, withinitialdrilling
identifying opportunities for substantial near-surface and deeper deposits.
With strategic projects and strong government support, AR3 is poised for significant growth in the critical minerals market.
JORC Table 1
Section 1 Sampling Techniques and Data
Criteria Explanation Comment
Sampling techniques Nature and quality of
sampling (e.g., cut
channels, random chips, or
specific specialised
industry standard
measurement tools
appropriate to the
minerals under
investigation, such as
down hole gamma sondes,
or handheld XRF
instruments, etc). These
examples should not be
taken as limiting the broad
meaning of sampling.
Include reference to
measures taken to
ensure sample
representivity and the
appropriate calibration
of any measurement
tools or systems used.
Aspects of the
determination of
mineralisation that are
Material to the Public
Report. In cases where
‘industry standard’ work
has been done this would
be relatively simple (e.g.,
‘reverse circulation drilling
was used to obtain 1 m
samples from which 3 kg
was pulverised to produce
a 30 g charge for fire
assay’). In other cases,
more explanation may be
required, such as where
there is coarse gold that
has inherent sampling
problems. Unusual
commodities or
mineralisation types (e.g.,
submarine nodules) may
warrant disclosure
of detailed information.
• Air Core drilling methods were used to obtain
samples from the Overland drilling program
between October-December 2024, January-
May 2025, and July- October 2025.
• The following information details the Air Core
drill sampling process:
• All Air Core drill samples were collected from
the rotary splitter mounted at the bottom of
the cyclone into a pre-numbered calico bag.
The samples were geologically logged at 1 m
intervals.
• Based on hole-diameter, generic material
density and a 20% split on the cyclone
samples averaged ~1.5-2.5 kg in mass.
• Chip trays were used to collect a
representative sample for each 1m sample
interval for each hole.
• After the samples were collected within the
calico bags, they were screened for
anomalous gamma radiation using a
handheld Ranger EXP survey meter (S/N
R318772) calibrated 23/09/2024 prior to
being geologically logged and tested with a
pXRF at the drill site.
• The gamma screening was conducted by
placing the handheld Ranger survey meter
• ~10cm from the calico sample for 5-10sec
and noting the dose rate in µSv. If elevated
dose rates were detected the field crew was
then notified before any additional sample
logging was conducted and the anomalous
reading recorded in the geological log.
• A handheld Olympus Vanta pXRF Analyser
(Model Vanta M Series S/N 842924) was used
to assess the geochemistry of the Air Core
samples in the field. The pXRF analysis
provided screening analysis to characterize
the sample lithology and full suite of
elements.
• The pXRF sampling was analysed through the
calico bag with a beam count time of 20-30
sec beam 1 and 10 sec beam 2. One pXRF
analysis per sample was performed.
• Samples are laid on a workbench and
flattened to create a stable surface for the
pXRF. The pXRF is placed on the sample with
the beam down for the analysis.
• All readings were taken at ambient
temperatures between 10 and 45 degrees
Celsius. The Olympus Vanta is rated for
continuous operation within these
temperatures.
• Samples range from dry to wet, this is
dependent on which formation is being
intercepted and whether drilling water has
been injected.
• A Uranium standard Oreas 121 (215 ppm U,
sourced from Mantra Resources Nyota
Prospect, Tanzania, which is a Tabular
Sandstone hosted deposit) was used to
verify the accuracy of the pXRF before and
after each analysis session.
• The OREAS 121 standard was prepared using
an industry standard pXRF sample cup and
analysed for 20-30 sec on beam 1 and 10 Sec
on beam 2.
• A silica blank is used to monitor the
accumulation of contamination on the lens of
the pXRF. Analysis of the blank is undertaken
before and after each analysis session.
• Review of pXRF standard and blank data is
checked to ensure the pXRF is operating
correctly before and after each session.
• Samples were selected for assay at the end of
the hole based on geology, pXRF, and
natural downhole gamma response.
• Field duplicates were taken at a rate of ~1:40
and inserted blindly into the sample batches.
• Field Standards were taken at a rate of ~1:40
and inserted blindly into the samples batches.
• Field Standards submitted consisted of OREAS
CRM 121, CRM 523b, CRM21h.
• Samples were submitted to Bureau Veritas in
Adelaide for analysis. The sample weights were
recorded (wet and dry) and samples were dried
at 105 degrees for a minimum of 24 hours. The
samples were secondary crushed to 3 mm
fraction and then pulverised to 90% passing 75
µm. Excess residue was maintained for storage
while the rest of the sample was placed in 8x4
packets and sent to the central weighing
laboratory.
• The samples were submitted for analysis
using Mixed Acid Digest – Lithium Borate
Fusion ICP-MS method (BV Code SC302)
with detection limits for each element
shown in ppm Ag (0.2 ppm), Al (50.0 ppm),
As (1.0 ppm), Au (0.01 ppm), Ba (2.0 ppm),
Be (0.5 ppm), Bi (0.1 ppm), Ca (100.0 ppm),
Cd (0.5 ppm), Ce (0.1 ppm),
• Co (1.0 ppm), Cr (20.0 ppm), Cs (0.1 ppm),
Cu (1.0 ppm), Dy (0.05 ppm), Er (0.05 ppm),
Eu (0.05 ppm), Fe (100.0 ppm), Ga (0.2
ppm), Gd (0.2 ppm), Hf (1.0 ppm), Ho (0.02
ppm), In (0.05 ppm), K (100.0 ppm), La (0.1
ppm), Li (10.0 ppm), Lu (0.02 ppm), Mg
(50.0 ppm), Mn (50.0 ppm), Mo (0.5 ppm),
Na (100.0 ppm), Nb (0.5 ppm), Nd (0.05
ppm), Ni (2.0 ppm), P (50.0 ppm), Pb (1.0
ppm), Pr (0.05 ppm), Rb (0.2 ppm), Re (0.1
ppm), S (50.0 ppm), Sb (0.1 ppm), Sc (1.0
ppm), Se (5.0 ppm), Si (50.0 ppm), Sm (0.05
ppm), Sn (0.1 ppm), Sr (0.5 ppm), Ta (0.1
ppm), Tb (0.02 ppm), Te (0.2 ppm), Th (0.1
ppm), Ti (50.0 ppm), Tl (0.1 ppm), Tm (0.05
ppm), U (0.1 ppm), V (20.0 ppm), W (0.5
ppm), Y (1.0 ppm), Yb (0.05 ppm), Zn (2.0
ppm), Zr (10.0 ppm)
• Select samples, often at the bottom of the
holes thought to be weathered
basement/saprolite material were also
analyzed for gold using Lead collection Fire
Assay AAS (BV Code FA001) where a detection
limit for Au (0.01 ppm)
• A laboratory repeat was taken at ~ 1 in 21
samples.
• Commercially obtained standards were
inserted by the laboratory at a rate of ~ 1 in 9
into the sample sequence.
• After the hole was drilled to completion a
Reflex EZ Gamma logging tool (serial number
GAM-043) rented from Imdex, and operated by
the drilling crew was run down the hole, inside
the rods/innertube to log the natural gamma
response of the sediments. The gamma tool
was last calibrated by Imdex on March 21st,
2025, as noted in the provided Certificate of
Conformance.
• The survey was run in and out of the hole at a
speed of no more than 10m/min and the
downhole speed was reviewed after the
survey.
• The up (out) survey was then used to plot
sections, after reviewing both in and out.
• Before each downhole gamma survey the
Reflex EZ Gamma logging tool was checked
with an EZ-Gamma confidence checker by
AR3 staff (S/N 025). The confidence checker
was last calibrated 29/08/24.
• Using the EZ-Gamma confidence checker at
the start of each run allows the gamma tool
to be checked ensuring it is within
specifications and the tool has not been
damaged or faulty providing confidence an
accurate gamma reading is collected for each
hole.
• The check is completed by first running the
gamma tool for ~3-5min to measure
Background Gamma (BKG) in cps. A second
survey is then conducted after sliding the EZ‐
Gamma Confidence checker (Jig serial number
025) over the gamma probe and measuring a
Sleeve Response (SR) in cps. The BKG value is
subtracted from the SR value which provides a
Calculated Sleeve Response (CSR) value in cps.
The CSR is then compared to the Expected
Value (EV) of the gamma checker which is
certified to be 636 cps. A resulting pass value=
636 cps +/‐ 10 % and required before the
survey tool is confirmed as operating within
expected limits.
• The formula used for checking the gamma tool
is as follows;
• CSR= SR-BKG
• CSR is compared to the EV of the confidence
checker which is certified to 636cps (for jig
serial number 025) +/- 10% (for pass value of
573-700cps).
• After the gamma survey is completed, the data
is uploaded to the Imdex hub IQ portal
(https://iq.imdexhub.com) from the rig via
satellite internet and available for review.
Drilling techniques Drill type (e.g., core, reverse
circulation, open- hole
hammer, rotary air blast,
auger, Bangka, sonic, etc)
and details (e.g., core
diameter, triple or standard
tube, depth of
diamond tails, face-
sampling bit, or other type,
whether core is oriented and
if so, by what method, etc).
• Drilling was completed using a Wallis
“Mantis 200” Air Core drill rig with an
onboard Sullair compressor (560cfm @
200psi).
• Air Core drilling is a form of reverse
circulation drilling where the sample is
collected at the face and returned inside the
inner tube. The drill cuttings are removed by
injection of compressed air into the hole via
the annular area between the inner tube and
the drill rod.
• Air Core drill rods used were 3 m long.
• NQ diameter (76 mm) drill bits and rods were
used.
• All Air Core drill holes were vertical with
depths varying between ~36m and 200 m
Drill sample recovery Method of recording and
assessing core and chip
sample recoveries and
results assessed.
Measures taken to maximise
sample recovery and ensure
representative nature of the
samples.
Whether a relationship
exists between sample
recovery and grade and
whether sample bias may
have occurred due to
preferential loss/gain of
fine/coarse material.
• Drill sample recovery for Air Core drilling is
monitored by recording sample condition
descriptions where ‘Poor’ to ‘Very Poor’ were
used to identify any samples recovered which
were potentially not representative of the
interval drilled.
• A comment was included where water
injection was required to recover the sample
from a particular interval. The use of water
injection can potentially bias a sample.
Minimal water injection was required during
this drilling program and used sparingly.
• Overall, no consistent/significant loses of
sample material was observed.
• The rotary splitter was set to an approximate
20% split, which produced approximately
1.5-2.5 kg sample for each meter interval.
• The 1.5-2.5 kg sample was collected in a pre-
numbered calico bag and the remaining 80% (5
kg to 8 kg) was disposed directly into the sump
as drilling progressed.
• At the end of each drill rod, the drill string is
cleaned by blowing down with air to remove
any clay and silt potentially built up in the
sample pipes and cyclone.
• The relationship (if any) between sample
recovery and grade is unknown
• No sample recovery information was reported
in historical reports relating to historical
drilling within this release.
Logging Whether core and chip
samples have been
geologically and
geotechnically logged to a
level of detail to support
appropriate Mineral
Resource estimation, mining
studies and metallurgical
studies. Whether logging is
qualitative or quantitative in
nature. Core (or costean,
channel, etc) photography.
The total length and
percentage of the relevant
intersections logged.
• All Air Core samples collected in calico bags
were logged for lithology, colour, cement type,
hardness, percentage rock estimate, and any
relevant comments such as moisture, sample
condition, evidence of reducing or oxidizing
conditions, and vegetation/organic material.
• Geological logging data for all drill holes was
qualitatively logged onto Microsoft Excel
spreadsheet using a field laptop with
validation rules built into the spreadsheet
including specific drop- down menus for each
variable. The data was uploaded to the
Australian Rare Earths Azure Data Studio
database.
• Every drill hole was logged in full and logging
was undertaken with reference to a drilling
template with codes prescribed and guidance
to ensure consistent and systematic data
collection.
• The density drilling is not sufficient to support
consideration of resource estimation, or
mining and no geotechnical logging was
completed.
Sub-sampling
techniques and
sample preparation
If core, whether cut or sawn
and whether quarter, half or
all cores taken.
If non-core, whether riffled,
tube sampled, rotary split,
etc and whether sampled
wet or dry.
For all sample types, the
nature, quality, and
appropriateness of the
sample preparation
technique.
Quality control procedures
adopted for all sub-sampling
• 1m Air Core sample interval was homogenised
within the cyclone and the rotary splitter was
set to an approximate 20% split producing
around 1.5-2.5 kg sample for each metre
interval.
• The 1.5-2.5kg sample was collected in a pre-
numbered calico bag and the 80% (5 kg to 8 kg)
portion was disposed directly into the sump as
drilling progressed.
• Duplicates were generally taken within
intervals which indicated potential for
anomalous U mineralization based on geology,
pXRF, and gamma signature. These duplicate
stages to maximise
representivity of samples.
Measures taken to ensure
that the sampling is
representative of the in- situ
material collected, including
for instance results for field
duplicate/second-half
sampling. Whether sample
sizes are appropriate to the
grain size of the material
being sampled.
samples were collected by splitting the 1m
interval by emptying the sample on to a table,
mixing and splitting into 1/8th subsamples and
randomly assigning 4 of the splits into the
duplicate and 4 remaining as the primary.
• The 1.5-2.5 kg sample collected in the calico
bag was logged by the geologist onsite.
• Approximately 10-20g of sample material from
each for each 1m calico sample placed in a chip
tray.
• The logged calico samples were scanned with
a pXRF onsite through the calico bag.
At the end of the drillhole samples were
selected for analysis.
• Samples selected for analysis were placed in
polyweave bags labelled with the sample
number, From-To interval, and Hole ID, then
segregated into bulka bags for transport to the
lab for analysis.
• No correction factors were applied to pXRF
results.
• Field duplicates of all the samples were
completed at a frequency of ~1 in 40 samples.
Field standards were inserted into the sample
sequence at a frequency of ~1:40. Standard
reference Material (SRM) samples were
inserted into the sample batches at a
frequency rate of 1 per 10 samples by the
laboratory and a repeat sample was taken at a
rate of 1 per 21 samples.
• An on-site geologist oversaw the sampling and
logging process and selected samples for
analysis based on the logging descriptions
pXRF analysis, and downhole gamma
response.
Quality of assay data
and laboratory tests
The nature, quality and
appropriateness of the
assaying and laboratory
procedures used and
whether the technique is
considered partial or total.
For geophysical tools,
spectrometers, handheld
XRF instruments, etc, the
parameters used in
determining the analysis
including instrument make
and model, reading times,
calibrations factors applied
and their derivation, etc.
Nature of quality control
procedures adopted (e.g.,
standards, blanks,
duplicates, external
laboratory checks) and
whether acceptable levels of
accuracy (i.e., lack of bias)
and precision have been
established.
• The detailed geological logging of samples
provides lithology (sand/clay component)
• The 1.5 kg Air Core samples were assayed by
Bureau Veritas laboratory in Wingfield,
Adelaide, South Australia, which is considered
the Primary laboratory.
• The samples will be initially oven dried at 105
degrees Celsius for 24 hours. Samples will be
secondary crushed to 3 mm fraction and the
weight recorded. The sample will then be
pulverised to 90% passing 75 µm. Excess
residue will be maintained for storage while
the rest of the sample is placed in 8x4 packets
and sent to the central weighing laboratory.
• All weighed samples will then be analysed
using the Multiple Elements Fusion/Mixed Acid
Digest analytical method;
• The samples were submitted for analysis using
Mixed Acid Digest – Lithium Borate Fusion ICP-
MS method (BV Code SC302) with detection
limits for each element shown in ppm Ag (0.2
ppm), Al (50.0 ppm), As (1.0 ppm), Au (0.01
ppm), Ba (2.0 ppm), Be (0.5 ppm), Bi (0.1 ppm),
Ca (100.0 ppm), Cd (0.5 ppm), Ce (0.1 ppm), Co
(1.0 ppm), Cr (20.0 ppm), Cs (0.1 ppm), Cu (1.0
ppm), Dy (0.05 ppm), Er (0.05 ppm), Eu (0.05
ppm), Fe (100.0 ppm), Ga (0.2 ppm), Gd (0.2
ppm), Hf (1.0 ppm), Ho (0.02 ppm), In (0.05
ppm), K (100.0 ppm), La (0.1 ppm), Li (10.0
ppm), Lu (0.02 ppm), Mg (50.0 ppm), Mn (50.0
ppm), Mo (0.5 ppm), Na (100.0 ppm), Nb (0.5
ppm), Nd (0.05 ppm), Ni (2.0 ppm), P (50.0
ppm), Pb (1.0 ppm), Pr (0.05 ppm), Rb (0.2
ppm), Re (0.1 ppm), S (50.0 ppm), Sb (0.1 ppm),
Sc (1.0 ppm), Se (5.0 ppm), Si (50.0 ppm), Sm
(0.05 ppm), Sn (0.1 ppm), Sr (0.5 ppm), Ta (0.1
ppm), Tb (0.02 ppm), Te (0.2 ppm), Th (0.1
ppm), Ti (50.0 ppm), Tl (0.1 ppm), Tm (0.05
ppm), U (0.1 ppm), V (20.0 ppm), W (0.5 ppm),
Y (1.0 ppm), Yb (0.05 ppm), Zn (2.0 ppm), Zr
(10.0 ppm)
• Select samples, often at the bottom of the
holes thought to be weathered
basement/saprolite material were also
analyzed for gold using Lead collection Fire
Assay AAS (BV Code FA001) where a detection
limit for Au (0.01 ppm)
• Field duplicates were collected and submitted
at a frequency of ~1 per 40 samples.
• Bureau Veritas will complete its own internal
QA/QC checks that include a Laboratory repeat
every 21st sample and a standard reference
sample every 9th sample prior to the results
being released.
• Australian Rare Earths submitted field
standards at a frequency of ~1:40 samples.
• Australian Rare Earths inserted field blanks at
a frequency of ~1:40 samples.
• The adopted QA/QC protocols are acceptable
for this stage of test work. The sample
preparation and assay techniques used are
industry standard and provide a total analysis.
Verification of
sampling and
assaying
The verification of
significant intersections by
either independent or
alternative company
personnel.
The use of twinned holes.
Documentation of primary
data, data entry procedures,
data verification, data
storage (physical and
electronic) protocols.
Discuss any adjustment to
assay data.
• All results are checked by the company’s Chief
Technical Officer.
• Field based geological logging for drill holes
was entered directly into an Excel spreadsheet
format with validation rules built into the
spreadsheet including specific drop-down
menus for each variable. This digital data was
then uploaded to the Australian Rare Earths
Azure Data Studio database.
• Assay data will be received in digital format
from the laboratory and uploaded to
Australian Rare Earths Azure Data Studio
database.
• Field and laboratory duplicate data pairs of
each batch will be plotted to identify potential
quality control issues.
• Standard Reference Material sample results
will be checked from each sample batch to
ensure they are within tolerance (<3SD) and
that there is no bias.
• U3O8 is the industry accepted form for
reporting Uranium. An oxide factor for U3O8 of
1.1793 was used for reporting throughout this
report.
Location of data
points
Accuracy and quality of
surveys used to locate drill
holes (collar and down- hole
surveys), trenches, mine
workings and other
locations used in Mineral
Resource estimation.
Specification of the grid
system used.
Quality and adequacy of
topographic control.
• All maps are in GDA94/MGA zone 54.
• All overland coordinate information was
collected using handheld GPS utilizing GDA
1994, Zone 54. While spatial location is
expected to be recovered within 3 – 5 m, it is
possible that the elevation can be as much as
10 m out with respect to the currently
established geoi