AR3 adds to Overland with uranium potential from surface
Released
Released
Announcement PDF
10 July 2025
Strategic addition to AR3’s Overland
Project with uranium potential from
surface
Highlights:
•
Acquisition expands Overland Project area: Agreement entered into to acquire EL6895
for $10,000 and to provide immediate access to a further 972km2 of strategic uranium
prospective ground adjacent to AR3’s Overland Uranium Project.
•
Significant gamma anomalism identified: AR3’s review of historic drilling data review
identifies significant gamma anomalism from surface on EL6895.
•
Potential for widespread near surface calcrete hosted uranium mineralisation:
Three historic drill holes, spanning ~7km, identifies large target area for potential near
surface calcrete hosted uranium mineralisation.
•
New target area is ~50km south of AR3’s near surface calcrete hosted uranium
occurrence: Similar style of uranium mineralisation to surficial uranium deposits mined
in Namibia such as Paladin Energy’s Langer Heinrich Mine 123.
•
Rapid testing of new target area: Overland drill program, planned to resume in late July
2025 4, will now include rapid confirmatory follow up drilling of the new EL6895 surficial
uranium target as well as previously planned follow-up of deeper ISR amenable roll front
targets in EL7001. Systematic testing of high-priority targets across Overland’s extensive
~7,700km2 tenure position will follow.
•
Engage with this announcement at the AR3 investor hub.
AR3 Managing Director and CEO, Travis Beinke, said:
“We identified an attractive opportunity to expand our Overland Uranium Project, through the
acquisition of EL6895, with a substantial new target uncovered through our systematic review of
historical drilling data dating back to 1981.
The significant gamma anomalism recorded from surface, never followed up with drilling by other
companies in this frontier uranium play, provides a compelling opportunity for AR3.
See Paladin Energy (ASX:PDN) release 2 April 2024 “Commercial production achieved at the Langer Heinrich
Mine”
2
Wilde, A. Towards a Mineral Systems Model for Surficial Uranium Mineralization Based on Deposits in
the Erongo District of Namibia. Minerals 2023, 13, 149. https://doi.org/10.3390/min13020149
3
See AR3 ASX release 19 March 2025 “AR3 confirms near surface uranium discovery at Overland”
4
See AR3 ASX release 26 May 2025 “Overland Project drilling identifies roll front uranium signature”
1
Strategically located only ~50km south of the calcrete hosted uranium mineralisation we identified
through recent drilling, this area warrants immediate follow-up. We plan to recommence drilling at the
end of July.
We are excited at the potential of this new target area to host significant calcrete hosted uranium
mineralisation.”
Australian Rare Earths Limited (ASX: AR3) is pleased to announce it will acquire the rights to EL6895
via an Asset Sale Agreement (Agreement) with private minerals explorer David Clarke. Under the
Agreement, AR3, will pay $10,000 to acquire EL6895.
This strategic acquisition of EL6895 adds 972km2 immediately adjoining AR3’s Overland Uranium
Project. AR3’s total project area will expand to approximately 7,700km2 of land in a frontier uranium
play in South Australia’s Murray Basin (see Figure 2).
In March 2025, upon the identification of widespread calcrete hosted uranium mineralisation at AR3’s
Overland Project3, the Company initiated a review of the broader Murray Basin margin to locate
additional areas that could potentially host this style of uranium mineralisation.
The review included an assessment of historic drilling and gamma logging conducted in 1981 by CRA
and uncovered drillholes on EL6895 with indications of significant gamma anomalism from surface
(see Figure 1) with no follow-up exploration undertaken in the intervening years.
A1
A
Figure 1: Schematic showing geology and natural gamma traces from 1981 drillholes, extracted from open file envelope ENV3957
pages 364, 365 and 369. Location of drillholes shown in Figure 3 and collar locations included in Appendix 2.
Drillholes 81MBR 21, 22 and 28 reveal significant gamma anomalism from surface and at up to 30
meters depth across a ~7km north south strike length (see Figures 1 and 3). This provides an extensive
area of potential near surface calcrete hosted uranium mineralisation.
The gamma anomalism identified in the historic CRA drillholes occurs within the carbonate sediments
of the Bungunnia limestone and underlying calcareous Murray Group sediments, located in a sub
basin setting of the Murray Basin. The sub-basin setting also hosts existing surficial gypsum deposits
which point to the evaporitic, mineral forming nature of the setting, further supporting a calcrete
hosted uranium mineralisation model for this area. This was also evidenced in AR3's recent nearsurface calcrete hosted uranium occurrence further north at Overland3.
Figure 2: Overland Project area and new EL6895.
Figure 3: Inset of new EL6895 showing section location plan and historic CRA drillhole locations.
The historic drillholes point to potential for widespread calcrete hosted uranium mineralisation. With
limited data at EL6895 and no targeted follow up of the drilling completed since 1981, AR3 views this
as a compelling target with potential to uncover significant calcrete hosted uranium mineralisation
which warrants immediate follow up with additional drilling.
Key Terms of Asset Sale Agreement
•
•
•
AR3 will pay $10,000 to David Clarke for the transfer of EL6895 to AR3.
The transfer of EL6895 is subject to Ministerial consent pursuant to section 15AB of the
Mining Act.
AR3 is to be appointed Operator of EL6895 during the period from Agreement execution to
the date the transfer of EL6895 to AR3 is registered on the Mining Register.
Next steps
•
Regulatory Approvals: An exploration Environment Protection and Rehabilitation (EPEPR)
application has been lodged with the Department for Energy and Mining for EL6895. EPEPR’s
for EL7001, 7003, 7005 and 6678 are approved.
•
Drill Program: AR3’s drilling program will resume in late July 2025 and will incorporate the
rapid confirmatory follow up drilling of the new EL6895 surficial uranium target (subject to
receipt of approved EPEPR) as well as previously planned follow-up of deeper ISR amenable
roll front targets in EL7001. This will be followed by systematic testing of high-priority targets
across the extensive ~7,700km2 tenure position.
•
Assay Results: Laboratory analysis of recent drilling samples elsewhere in Overland is
underway, with results expected to be available over the coming months.
•
Data Analysis: AR3 continues to compile and interpret all existing geological and geophysical
data.
•
Geophysical Surveys: AR3 is developing remote sensing techniques to better define
prospective paleochannel targets, particularly in EL7001 where existing drill density will help
validate any geophysical techniques applied.
The announcement has been authorised for release by the Board of Australian Rare Earths Limited.
For further information please contact:
Australian Rare Earths Limited
Travis Beinke
Managing Director and CEO
T: 1 300 646 100
Media Enquiries
Jessica Fertig
Tau Media
E: info@taumedia.com.au
Engage and Contribute at the AR3 investor hub: https://investorhub.ar3.com.au
Competent Person’s Statement
The information in this report that relates to Exploration results is based on information compiled by Australian Rare Earths Limited
and reviewed by Mr Rick Pobjoy who is the Chief Technical Officer of the Company and a member of the Australian Institute of Mining
and Metallurgy (AusIMM). Mr Pobjoy has sufficient experience that is relevant to the style of mineralisation, the type of deposit under
consideration and to the activities undertaken to qualify as a Competent person as defined in the 2012 edition of the “Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Pobjoy consents to the inclusion in this report
of the matters based on this information in the form and context in which it appears.
About Australian Rare Earths Limited
Australian Rare Earths (AR3) is an emerging diversified critical minerals company, strategically positioned to meet the growing global
demand for uranium and rare earth elements. The Company’s vast ~7,700 km² Overland Uranium Project in South Australia shows
strong uranium discovery potential, with initial drilling identifying opportunities for substantial near-surface and deeper deposits.
Simultaneously, AR3's Koppamurra Rare Earths Project in South Australia and Victoria has secured important government support
through a $5 million grant to accelerate development. With support from global advanced industrial materials manufacturer, Neo
Performance Materials, AR3 is progressing toward a Pre-Feasibility Study and a demonstration facility, solidifying its role in diversifying
global rare earth supply chains for the clean energy transition. With strategic projects and strong government support, AR3 is poised
for significant growth in the critical minerals market.
Appendix 1- JORC Tables
JORC Table 1
Criteria
Section 1 Sampling Techniques and Data
Comment
Explanation
Sampling techniques Nature and quality of
sampling (e.g., cut
channels, random chips, or
specific specialised
industry standard
measurement tools
appropriate to the
minerals under
investigation, such as
down hole gamma sondes,
or handheld XRF
instruments, etc). These
examples should not be
taken as limiting the broad
meaning of sampling.
Include reference to
measures taken to
ensure sample
representivity and the
appropriate calibration
of any measurement
tools or systems used.
Aspects of the
determination of
mineralisation that are
Material to the Public
Report. In cases where
‘industry standard’ work
has been done this would
be relatively simple (e.g.,
‘reverse circulation drilling
was used to obtain 1 m
samples from which 3 kg
was pulverised to produce
a 30 g charge for fire
assay’). In other cases,
more explanation may be
required, such as where
there is coarse gold that
has inherent sampling
problems. Unusual
commodities or
mineralisation types (e.g.,
submarine nodules) may
warrant disclosure
of detailed information.
CRA Exploration (Holes 81MBR19, 20, 21, 22, 23,
24, and 28)
•
The 81MBR series holes were drilled by rotary
mud drilling, completed by CRA exploration
during the quarter ending April 7, 1981.
•
A total of 30 Mud Rotary boreholes for a total
of 5679 meters was completed by CRA during
this period including the holes referred to in
this release.
•
This drilling detail is contained within open
file report envelope ENV03957 which publicly
available for download on South Australian
Resource Information Gateway (SARIG).
•
The drilling by CRA was targeting economic
coal deposits in the Murray Basin following up
on gravity and other geophysical targets from
previous exploration.
•
Results of this drilling concluded that there
was little potential for economically viable
lignite deposits.
Sampling
•
Drillholes were selectively sampled for
Uranium, Copper, Lead, Zinc and Gold.
•
Samples were collected at nominal intervals
of approximately 2 metres.
•
No detail in historical reports on sampling
protocol, sampling representivity, or sample
size which was submitted for assay.
•
Sampling by CRA was targeting the upper
Renmark Group stratigraphy for lignite and
no sampling was taken within the anomalous
downhole gamma zones presented within this
report.
Downhole geophysical logging
•
Downhole geophysical logging was completed
on all CRA holes including caliper, density,
natural gamma and neutron-neutron.
•
Downhole geophysical logs provided in
historical reports are limited to graphical logs
similar what has been presented within this
release.
Drilling techniques
•
No additional details are provided on the
calibration or surveying of the downhole
geophysical logs within historical reports.
•
Geophysical contractor B.P.B Pty. Ltd.
Drill type (e.g., core, reverse CRA Exploration (Holes 81MBR19, 20, 21, 22, 23,
circulation, open‐ hole
24, and 28):
hammer, rotary air blast,
• Drill type: Rotary Mud
auger, Bangka, sonic, etc)
• Drill contractor: Thompson Drilling
and details (e.g., core
• Drilling Rig: Bourne 1250
diameter, triple or standard
• Core diameter: not specified
tube, depth of
diamond tails, face‐
• Holes were cased to varying depths
sampling bit, or other type,
ranging between 0 and ~30m.
whether core is oriented and
if so, by what method, etc).
Drill sample recovery Method of recording and
CRA Exploration (Holes 81MBR19, 20, 21, 22, 23,
assessing core and chip
24, and 28):
sample recoveries and
• Sample recovery quality not quantified in
results assessed.
historical reports.
Measures taken to maximise • While no direct measurements were made of
sample recovery and ensure
sample recovery for each interval, general
representative nature of the
comments in historic reports indicate recovery
samples.
was sufficient for geochemical analysis, with
Whether a relationship
no material bias evident.
exists between sample
recovery and grade and
whether sample bias may
have occurred due to
preferential loss/gain of
fine/coarse material.
Logging
Whether core and chip
CRA Exploration (Holes 81MBR19, 20, 21, 22, 23,
samples have been
24, and 28):
geologically and
geotechnically logged to a • Geological logging was completed for the
level of detail to support
entire drill hole.
appropriate Mineral
• No geotechnical logging was undertaken.
Resource estimation, mining • From-to intervals and unit descriptions,
studies and metallurgical
including colour, grain size, sorting, and
studies. Whether logging is
lithology, were systematically recorded.
qualitative or quantitative in
• No further logging details were provided in the
nature. Core (or costean,
historical reports.
channel, etc) photography.
• The logging undertaken was not designed to
The total length and
support a mineral resource estimation.
percentage of the relevant
intersections logged.
Sub‐sampling
techniques and
sample preparation
If core, whether cut or sawn CRA Exploration (Holes 81MBR19, 20, 21, 22, 23,
and whether quarter, half or 24, and 28):
all cores taken.
If non‐core, whether riffled,
• No detail provided within historical reports
tube sampled, rotary split,
on the sample splitting technique,
etc and whether sampled
moisture content, duplicates, or sample
wet or dry.
sizes of the material being sampled.
For all sample types, the
nature, quality, and
appropriateness of the
sample preparation
technique.
Quality control procedures
adopted for all sub‐sampling
stages to maximise
representivity of samples.
Measures taken to ensure
that the sampling is
representative of the in‐ situ
material collected, including
for instance results for field
duplicate/second‐half
sampling. Whether sample
sizes are appropriate to the
grain size of the material
being sampled.
Quality of assay data The nature, quality and
CRA Exploration (Holes 81MBR19, 20, 21, 22, 23,
and laboratory tests appropriateness of the
24, and 28):
assaying and laboratory
procedures used and
• Following logging, samples were sent to
whether the technique is
Comlabs and A.M.D.E.L. for analysis of oil
considered partial or total.
yield, uranium, copper, lead, and zinc.
For geophysical tools,
Selected coarse sand samples were also
spectrometers, handheld
submitted for gold assay.
XRF instruments, etc, the
parameters used in
• The historical reports do not provide any
determining the analysis
details regarding laboratory procedures,
including instrument make
including the use of blanks, duplicates, or
and model, reading times,
external laboratory checks.
calibrations factors applied
and their derivation, etc.
• No information was reported on the make
Nature of quality control
and model of the instruments used for
procedures adopted (e.g.,
downhole geophysical logging, nor on
standards, blanks,
their calibration procedures or reading
duplicates, external
times.
laboratory checks) and
whether acceptable levels of
accuracy (i.e., lack of bias)
and precision have been
established.
Verification of
The verification of
• AR3’s Exploration Manager and Chief Technical
sampling and
significant intersections by
Officer have carried out internal reviews of the
assaying
either independent or
compiled historical data disclosed in this release
alternative company
to ensure its accuracy and alignment with
personnel.
reporting standards.
The use of twinned holes.
Documentation of primary CRA Exploration (Holes 81MBR19, 20, 21, 22, 23,
data, data entry procedures, 24, and 28):
data verification, data
• No independent verification noted in the
storage (physical and
historical report, reviewed internally by CRA
electronic) protocols.
geologists.
Discuss any adjustment to • CRA was using the “Coalbor” computer system
assay data.
for data storage and presentation. This system
was new to CRA at the time of data capture
and “teething” problems were noted in the
historical report.
Location of data
points
Accuracy and quality of
• All maps prepared by AR3 are in GDA94/MGA
surveys used to locate drill
zone 54.
holes (collar and down‐ hole
surveys), trenches, mine
CRA Exploration (Holes 81MBR19, 20, 21, 22, 23,
workings and other
24, and 28):
locations used in Mineral
Resource estimation.
• Drill Hole Locations: Due to the historical
Specification of the grid
nature of the drilling presented in this release,
system used.
exact drill hole locations cannot be fully
Quality and adequacy of
verified, as discrepancies exist between the
topographic control.
“approximate” coordinates recorded in the
original paper logs and the locations provided
by SARIG.
• Source of Location Data: The location data
reported here has been sourced from SARIG
records.
• A list of collars is included within Appendix 2 of
this release.
Data spacing and
distribution
Data spacing for reporting CRA Exploration (Holes 81MBR19, 20, 21, 22, 23,
of Exploration Results.
24, and 28):
Whether the data spacing, • Geological and Grade Continuity: No
and distribution is sufficient
geological or grade continuity estimations
to establish the degree of
have been derived from the CRA exploration
geological and grade
drill holes included in this release.
continuity appropriate for • Purpose and Nature of Drilling: The drilling
the Mineral Resource and
formed part of a basin-wide regional
Ore Reserve estimation
exploration program targeting economic coal
procedure(s) and
deposits, which is reflected in the broad drill
classifications applied.
hole spacing presented here.
Whether sample
compositing has been
applied.
Orientation of data in Whether the orientation of CRA Exploration (Holes 81MBR19, 20, 21, 22, 23,
relation to geological sampling achieves unbiased 24, and 28):
structure
sampling of possible
• Vertical orientation considered appropriate for
structures and the extent to
targeting flat sediments of the Murray Basin
which this is known,
Stratigraphy.
considering the deposit type. • No orientation bias identified.
If the relationship between
the drilling orientation and
the orientation of key
mineralised structures is
considered to have
introduced a sampling bias,
this should be assessed and
reported if
material.
Sample security
The measures taken to
CRA Exploration (Holes 81MBR19, 20, 21, 22, 23,
ensure sample security.
24, and 28):
• Sample Analysis: Following logging, samples
were submitted to Comlabs and A.M.D.E.L. for
analysis of oil yield, uranium, copper, lead, and
zinc. Selected coarse sand samples were also
sent for gold assay.
• Sample Security: The historical report did not
provide any information regarding the security
or chain-of-custody measures for the samples.
Audits or reviews
The results of any audits or Internal QAQC Oversight of Historical Data:
reviews of sampling
• AR3’s Exploration Manager and Chief Technical
techniques and data.
Officer have carried out internal reviews of the
compiled historical data disclosed in this release
to ensure its accuracy and alignment with
reporting standards.
CRA Exploration (Holes 81MBR19, 20, 21, 22, 23,
24, and 28):
• The original historic report did not record any
audits or independent reviews of the sampling
data for these drill holes.
Criteria
Mineral
tenement
and land
tenure status
Section 2 Reporting Exploration Results
Explanation
Comment
Type, reference
CRA Exploration (Holes 81MBR19, 20, 21, 22, 23,
name/number, location
24, and 28):
and ownership including
• Drilling on for the CRA holes was within
agreements or material
historical tenement EL00667.
issues with third parties
Australian Rare Earths Tenure
such as joint ventures,
partnerships, overriding
• Australian Rare Earths Overland project is
royalties, native title
comprised of EL7001, EL7003, EL7005, 7055,
interests, historical sites,
held by Valrico Resources Ltd Pty and
wilderness or national
WRDBD PTY LTD, wholly owned subsidiaries
park and environmental
of Australian Rare Earths.
settings.
The security of the tenure • An additional two ELA’s (2025/00022 &
00023) have recently been lodged covering
held at the time of
an area of 1946km2
reporting along with any
known impediments to
• Valrico Resources Ltd Pty have completed
obtaining a licence to
an earn-in agreement with the license
operate in the area.
holders of EL6678 (Sheer Gold Pty Ltd) on
April 24th, 2025 (see ASX announcement)
covering an area of 990km2.
•
Recently AR3 acquired EL6895 from private
minerals explorer David Clarke. Under the
agreement AR3 will acquire EL6895 for a
payment of $10,000- additional details
within this release.
•
The total Overland project area covers
7687km2 which includes EL7001, 7003,
7005, 7055, 6678, 6895, and applications
ELA2025/0022 and 0024.
•
There are no Conservation Parks or
Regional Reserves in the EL areas.
•
The White Dam CP has been excised
from the SW corner of EL7003 and
southern portion of EL6678.
•
The Morgan CP are located outside the SW
corner of EL7003 and excised from EL6895.
•
Registered Native Title Determination
Application SC2019/001 overlaps with the
central portion of EL7003, southern portion
of EL6678 and all of ELA2025/00022 &
ELA2025/00023
•
Registered Native Title Determination
Application SC2011/002 overlaps with the
NW corner of EL7005.
•
A registered and Notified Indigenous Land
Use Agreement (ILUA)‐ The River Murray
and Crown Lands SI2011/025 overlaps
with the southern portion of EL7003 and
northern portion of 6895.
•
A registered and Notified Indigenous Land
Use Agreement (ILUA)‐ Ngadjuri Faraway
Hill Pastoral SI2005/005 overlaps with the
Northwest corner of EL7005.
Exploration
done by
other parties
Acknowledgment and
appraisal of exploration
by other parties.
Geology
Deposit type, geological
setting and style of
mineralisation.
•
Exploration activities by other exploration
companies extend back to the 1970’s.
•
Historically the area has been explored for
Base Metals, Coal, Gold, Copper, Heavy
Mineral Sands, and Water.
•
The Overland project is targeting
Paleochannel Uranium within the Murray
and Renmark Group sediments of the
Murray Basin.
•
Sedimentary hosted uranium deposits occur
in medium to coarse‐grained sedimentary
sequences deposited in a continental fluvial
or marginal marine sedimentary
environment. Impermeable shale/mudstone
units are interbedded in the sedimentary
sequence and often occur immediately
above and below the mineralised sediments.
Uranium is precipitated under reducing
conditions caused by a variety of reducing
agents within the permeable sediments
including carbonaceous material (detrital
plant debris, amorphous humate, marine
algae), sulphides (pyrite, H2S), and
hydrocarbons.
•
Anomalous uranium within the Murray
Basin occurs in carbonaceous clay and
lignite of the Winnambool Formation and
Geera Clay (Murray Group) of the Murray
Basin, however the Renmark Group
sediments have never been effectively
targeted for uranium in the South Australian
portion of the Murray Basin and therefore
represent a highly promising new frontier
for uranium exploration.
•
Shallow sedimentary uranium mineralisation
in secondary carbonate cementation is
another style of U mineralization being
targeted, similar to Namibia’s surficial
uranium deposits. Similar calcrete-hosted
deposits are also found in Western Australia
•
In addition to paleochannel uranium, AR3 is
also exploring basement geology for a
diverse range of mineralization styles
including;
•
Porphyry Cu–Au–Mo
Drill hole
Information
A summary of all
information material to
the understanding of the
exploration results
including a tabulation of
the following information
for all Material drill
holes:
- easting and northing of
the drill hole collar
elevation or RL (Reduced
Level – elevation above
sea level in metres) of the
drill hole collar
dip and azimuth
of the hole
down hole length
and interception depth
hole length.
•
Skarn
•
Orogenic gold
•
Volcanic-hosted massive sulphides (VHMS)
•
Sediment-hosted systems
•
AR3’s exploration approach integrates
historical drilling data with new basement
assay results collected during ongoing
paleochannel uranium drilling programs.
Targeting basement-hosted Cu-Au
mineralisation has been a strategic
consideration from the outset.
•
In 2024, GA completed a comprehensive
metallogenic review of the Delamerian
margin, identifying four major metallogenic
events between 590 Ma and 399 Ma,
associated with multiple tectonic settings
(passive margin, convergent margin,
intraplate, back-arc).
•
AR3’s project area is underlain by
convergent margin rocks and is associated
with two key metallogenic phases:
•
505–494 Ma: Porphyry, epithermal, skarn,
and VHMS mineralisation.
•
495–460 Ma: Granite-related magmatism
linked to porphyry Cu–Mo systems (e.g.
Anabama Hill, Netley Hill, Bendigo Prospects
AR3 Drilling:
• All material information related to AR3’s
drilling at the Overland Project has been
previously disclosed in the company’s
ASX announcements.
• No new or previously unreported drilling
by AR3 has been conducted.
CRA Exploration (Holes 81MBR19, 20, 21, 22, 23,
24, and 28):
•
Drill Hole Locations: Due to the historical
nature of the drilling presented in this
release, exact drill hole locations cannot be
fully verified, as discrepancies exist
between the “approximate” coordinates
recorded in the original paper logs and the
locations provided by SARIG.
Data
aggregation
methods
Relationship
between
mineralisatio
n widths and
intercept
lengths
If the exclusion of this
information is justified on
the basis that the
information is not
Material and this
exclusion does not
detract from the
understanding of the
report, the Competent
Person should clearly
explain why this is the
case.
In reporting Exploration
Results, weighting
averaging techniques,
maximum and/or
minimum grade
truncations (e.g. cutting
of high grades) and cut‐
off grades are usually
Material and should be
stated.
Where aggregate
intercepts incorporate
short lengths of highgrade results and longer
lengths of low grade
results, the procedure
used for such
aggregation should be
stated and some typical
examples of such
aggregations should be
shown in detail.
The assumptions used for
any reporting of metal
equivalent values should
be clearly stated.
These relationships are
particularly important in
the reporting of
Exploration Results.
If the geometry of the
mineralisation with
respect to the drill hole
angle is known, its
nature should be
reported.
If it is not known and
only the down hole
lengths are reported,
•
•
Source of Location Data: The location data
reported here has been sourced from
SARIG records.
A list of collars is included within Appendix
2 of this release.
CRA Exploration (Holes 81MBR19, 20, 21, 22, 23,
24, and 28):
•
Following logging, samples were submitted
to Comlabs and A.M.D.E.L. for analysis of oil
yield, uranium, copper, lead, and zinc.
Selected coarse sand samples were also sent
for gold assay.
•
All reported as simple intervals are 2m.
•
No anomalous results in the assay data was
noted in the historical reports, this data was
also reviewed by AR3.
•
No high-grade cut-off or top-capping was
applied to results.
•
Down hole lengths of geological intervals
are interpreted to be true widths as the
geology in the region is relatively flat lying
and the holes are vertical.
there should be a clear
statement to this effect
(eg ‘down hole length,
true width not
known’).
Diagrams
Balanced
reporting
Other
substantive
exploration
data
Appropriate maps and
sections (with scales) and
tabulations of intercepts
should be included for
any significant discovery
being reported. These
should include, but not
be limited to a plan view
of drill hole collar
locations and
appropriate sectional
views.
Where comprehensive
reporting of all
Exploration Results is not
practicable,
representative reporting
of both low and high
grades and/or widths
should be practiced to
avoid misleading
reporting
of Exploration Results.
Other exploration data, if
meaningful and material,
should be reported
including (but not limited
to): geological
observations;
geophysical survey
results; geochemical
survey results; bulk
samples – size and
method of treatment;
metallurgical test results;
bulk density,
groundwater,
geotechnical and rock
characteristics; potential
•
Appropriate maps and sections are included
in the body of this release.
•
This release contains all drilling results that
are consistent with the JORC guidelines.
Where data may have been excluded, it is
considered not material.
•
All drilling and historic work referred to in
this report is available on SARIG.
•
No additional meaningful and material data
has been excluded from this release
deleterious or
contaminating
substances.
Further work
The nature and scale of
planned further work (eg
tests for lateral
extensions or depth
extensions or large‐scale
step‐out drilling).
Diagrams clearly
highlighting the areas of
possible extensions,
including
Share your feedback