SECURING AUSTRALIA'S ENERGY TRANSITION METALS
2025 Annual Report
Contents
Chairman’s Letter
4
Managing Director’s Letter
8
SECURING AUSTRALIA'S ENERGY TRANSITION METALS
Operations Review
Diversified Project Portfolio
10
Koppamurra Project
11
Koppamurra Mineral Resources Highlights
19
Koppamurra Mineral Resource Estimate
20
Koppamurra Exploration Target Estimate
22
Overland Uranium Project
25
Additional Uranium Projects
31
Australian Rare Earths Tenement Interests
32
Directors’ Report
32
Remuneration Report (Audited)
42
Auditor’s Independence Declaration
54
Financial Report
Statement of Profit or Loss and Other Comprehensive Income
56
Statement of Financial Position
57
Statement of Changes in Equity
58
Statement of Cash Flows
59
Notes to the Financial Statements
60
Consolidated Entity Disclosure Statement
80
Directors’ Declaration
81
Independent Auditor’s Report
82
Additional Information
86
Corporate Directory
89
3 | Australian Rare Earths 2025 Annual Report
Chairman's Letter
DEAR SHAREHOLDERS,
WHAT A DIFFERENCE A YEAR MAKES.
OVER THE PAST 12 MONTHS, THE STRATEGIC
SIGNIFICANCE OF RARE EARTHS HAS COME INTO
SHARP FOCUS.
WE HAVE MADE MATERIAL STRIDES IN ADVANCING
AUSTRALIAN RARE EARTHS’ (AR3) VISION - TO BECOME
A RELIABLE, RESPONSIBLE, AND STRATEGIC SUPPLIER
OF CRITICAL MINERALS IN SUPPORT OF THE WORLD’S
ENERGY TRANSITION.
AND WHILE CAPITAL MARKETS CONDITIONS REMAIN
CHALLENGING FOR SMALL-CAP EXPLORERS, THE
POLICY, GEOPOLITICAL AND MARKET FORCES NOW
AT PLAY ARE ALIGNING IN A WAY THAT STRENGTHENS
OUR CONVICTION IN AR3’S LONG-TERM OPPORTUNITY
AND OUR ABILITY TO DELIVER VALUE FOR
SHAREHOLDERS.
4
We have made material strides in advancing Australian
Rare Earths’ (AR3) vision - to become a reliable,
responsible, and strategic supplier of critical minerals in
support of the world’s energy transition.
While capital markets conditions remain challenging for
small-cap explorers, the policy, geopolitical and market
forces now at play are aligning in a way that strengthens
our conviction in AR3’s long-term opportunity and our
ability to deliver value for shareholders.
The Strategic Context
The rare earths sector sits at the intersection of the two
mega-trends of our times: geopolitics and decarbonisation.
China’s recent export restrictions on the key magnet rare
earths – Dysprosium (Dy) and Terbium (Tb) - underscores
the urgency for diversified supply chains.
In parallel, we have seen the United States move
decisively. The long-term offtake agreement between
MP Materials and the U.S. Department of Defense, which
embeds a price floor for Neodymium and Praseodymium
(NdPr) and provides underwriting for supply, is a watershed
moment. It demonstrates that governments are now
prepared to intervene directly to support strategic
minerals supply chains. Importantly, while that agreement
secures NdPr supply, the US still has a gap on the supply
of heavy rare earths, Dysprosium and Terbium - materials
that are indispensable for high-temperature magnets and
today supplied almost exclusively by ionic-clay hosted
deposits in China. This underscores the opportunity for
projects like Koppamurra to be part of the solution.
Australia too has stepped up. The Federal Government
has signalled its intent to establish National Offtake
Agreements under a Critical Minerals Strategic Reserve.
These initiatives are designed to catalyse new projects,
underwrite investor confidence and ensure Australia
contributes to the secure, diversified supply chains our
allies are urgently seeking.
Rare earths has moved moved from being a niche
concern to a central plank of national industry policy.
These policy tools, together with tax incentives, funding
programs and bilateral/multilateral partnerships, are
reshaping what is possible for projects like ours.
HAVE NO DOUBT THE KOPPMAURRA PROJECT IS
ON THE AUSTRALIAN GOVERNMENT’S RADAR:
In December 2024 we secured a $5 million grant
under the Australian Government’s International
Partnerships in Critical Minerals Program.
In September 2025, I represented AR3 on a
Australian Government sponsored select delegation
of critical minerals companies handpicked to meet
US Government officials and agencies in Washington
DC, as the US seeks to fill their identified supply gaps
in critical minerals such as rare earths.
And we are now actively working to make sure
Koppamurra’s potential is equally well recognised
among Australia’s other friends and allies.
Positioning for Policy Tailwinds
We have also taken deliberate steps to ensure AR3 is
positioned to benefit from the growing policy momentum
behind the rare earths sector.
Our engagement with Governments both in Australia
and abroad and abroad has raised awareness of
Koppamurra’s unique attributes: Where many larger
projects face long lead times, higher capex and complexity,
Koppamurra offers a potential time-to-market advantage.
Its ionic clay host, together with potential for heap-leach
processing, relatively lower capex, short build time and
low technical risk, plus its presence in the low sovereign
risk jurisdiction of Australia, all underpin its attraction.
Through registering with U.S. procurement frameworks,
joining official Australian Government backed industry
delegations abroad and selective participation in industry
conferences, AR3 is attracting increasing recognition.
This positioning matters: It is what will help us secure the
offtakes, funding and partnerships that can transform
Koppamurra from a promising deposit into a producing
project of national and international significance.
Furthermore, the evolving policy architecture Government offtake agreements, strategic reserves,
loan programs and critical minerals tax incentives - are
no longer abstract promises: they are real tailwinds that
enhance the viability of projects like ours and materially
shift investor, customer, and partner interest.
With supportive policy in Australia, rising offtake interest
abroad, and growing global demand, we believe AR3
can be in the vanguard of companies that delivers the
next wave of supply for both light and heavy magnet rare
earths.
5 | Australian Rare Earths 2025 Annual Report
Chairman’s Letter
Outlook
With thanks
Over the next year, our priorities are clear:
Through a year of volatility in investor sentiment across
rare earths and uranium sectors, AR3 has remained
disciplined. We have advanced our projects, managed
our costs, and secured additional funding through
shareholder support and government grants. We have
focused on the things within our control, so that as the
cycle turns in our key commodities – as they always do,
and now seem to be - we are well placed to capitalise.
Complete the Pre-Feasibility Study
for Koppamurra.
Build and operate a demonstration
plant to process Koppamurra ore
through to mixed rare earth carbonates.
Submit our mining lease application,
working in close consultation with
our local landowner partners.
Continue engagement with
government and industry to ensure
AR3 is well-positioned under the new
National Offtake Agreements and
Critical Minerals Reserve framework.
Progress our exploration drilling at
Overland to test a range of compelling
targets.
Maintain strong stewardship of
capital, community, and environmental
obligations; governance, transparency,
and responsible development are
central to our identity and essential to
delivering long-term shareholder value.
I acknowledge the hard work and creativity of our team,
led by our Managing Director, Travis Beinke. Our staff’s
ability to progress the technical, regulatory and strategic
dimensions of our projects in this environment is proving
a real strength.
I also thank you - our shareholders - for your continued
support and belief. When we made the decision to raise
capital this year – and this came just prior to the re-ignition
of investor interest in the rare earths sector flowing from
the Chinese export bans – we made a conscious decision
to prioritise our existing shareholders and provide them
the first opportunity to consider investing additional
funds for the Company’s development via a rights issue.
We were immensely grateful that our shareholder
base responded with exceptional take up amidst
general market turmoil in April this year, and I thank our
shareholders for the strong show of support.
Conclusion
The themes that were nascent a year ago are now
undeniable: Governments are back in the business of
industry policy, and critical minerals are at the forefront.
Export controls, tariffs, national reserves and offtake
agreements are reshaping the landscape. In that context,
AR3 is growing in strength. Koppamurra’s combination
of light and heavy rare earths, potential low-capex
development pathway and time-to-market edge make it
a strategic asset. Overland provides diversification and
additional growth potential. As geopolitics, policy shifts,
and market responses all underscore what is at stake,
we are well-placed to seize the opportunity ahead.
Yours sincerely,
Angus Barker
Chairman
Australian Rare Earths Limited
6
7 | Australian Rare Earths 2025 Annual Report
MD's Letter
DEAR SHAREHOLDERS,
IN 2025, AUSTRALIAN RARE EARTHS MADE
SIGNIFICANT OPERATIONAL PROGRESS
ACROSS OUR PORTFOLIO, ADVANCING
BOTH OUR FLAGSHIP KOPPAMURRA RARE
EARTHS PROJECT AND OUR EMERGING
URANIUM PROJECT AT OVERLAND.
8
Operational Overview
Financial Overview
At Koppamurra, we expanded the Mineral Resource
Estimate by a further 27% to 236 million tonnes at
748ppm Total Rare Earth Oxides (TREO), including
a high-grade subset of 68 million tonnes grading
above 1,000ppm.
In May, we completed a $3.6 million rights offer with
strong participation from both shareholders and
directors.
This resource contains over 25% magnet rare earth
content, including the key heavy elements dysprosium
and terbium. Importantly, this estimate represents only
around 2% of our total tenement holding, highlighting
the potential scale of the opportunity.
In December 2024 we secured a $5 million matched
funding grant from the Australian Government’s
International Partnerships in Critical Minerals Program.
This is a significant milestone for the Koppamurra
project and further validation of the project potential
and strategic importance in building a diverse, resilient
and sustainable supply chain. The funding is supporting
additional metallurgical testwork, completion of a
Pre-Feasibility Study (PFS), and the construction and
operation of a Demonstration Plant during 2025 and
2026 to advance the project and significantly derisk the
development pathway.
Operationally, our focus during the first half of 2025
has been on progressing our low-impact, scalable
development pathway. This includes advanced
metallurgical testwork to optimise our heap leach
process and commencement of early works towards
the Pre-Feasibility Study.
Our partnership with Neo Performance Materials
continues to be a strategic advantage. In addition to
being a founding shareholder, Neo brings valuable
downstream expertise and alignment on offtake strategy.
This relationship supports our ambition to play a key role
in a transparent, traceable and independent mine-tomagnet supply chain.
We have also made meaningful progress on the Overland
Uranium Project in South Australia. Following a strategic
farm-in agreement and the addition of new applications,
our footprint now covers over 7,000 square kilometres of
highly prospective ground.
This non-renounceable rights issue was fully allocated
with 93% raised through acceptances by existing
AR3 shareholders with the balance allocated to new
sophisticated and professional investors. I would like
to sincerely thank our shareholders for their continued
confidence in AR3 and our long-term strategy.
Your support has enabled us to maintain our momentum
as we continue to advance both Koppamurra and
Overland.
Outlook
Looking ahead, our focus will remain firmly on execution
and creating value. At Koppamurra, we are aiming to
complete the Pre-Feasibility Study, refine our flowsheet,
and commence demonstration plant activities.
At Overland, we will expand our exploration efforts to
better understand the mineralised systems and the
projects exploration potential.
I thank the AR3 team for their commitment and
professionalism over the past year. Their work continues
to drive our progress and shape our path forward. I also
thank our shareholders for your ongoing support.
We are energised, focused and confident in our ability
to deliver value through responsible and innovative
project development.
Yours sincerely,
Travis Beinke
Managing Director
Australian Rare Earths Limited
Our inaugural drilling campaign quickly provided
compelling evidence supporting our geological model
for In-situ Recoverable (ISR) amendable deposits while
drilling in early 2025 intersected near-surface calcretehosted mineralisation providing a second distinct
uranium mineralisation style at Overland.
These early results reinforce the project's prospectivity
and have laid the foundation for follow-up drill programs.
9 | Australian Rare Earths 2025 Annual Report
Operations Review
DIVERSIFIED PROJECT PORTFOLIO
Rare Earths
Uranium
Copper/Gold
Massie Creek
Oaky Valley
Sandy Tate
Forty Mile Scrub
Dalrymple
Hamilton Creek
Triggs Bore
Overland
Koppamurra
10
RARE EARTHS ELEMENTS PORTFOLIO
KOPPAMURRA PROJECT
Project Overview
The Koppamurra Project, located in South-Eastern South Australia and Western Victoria, continues to grow as a
significant ionic clay-hosted rare earth deposit. The latest Mineral Resource Estimate (MRE) increased by 27% over
the period to 236 million tonnes at 748 ppm Total Rare Earth Oxide (TREO) and also revealed a higher-grade subset
of 68 million tonnes grading over 1000ppm.
Location
~300km SE of Adelaide, in South Australia and Victoria
Scale/Size
7,400km2
Ownership
100%
Partner
Neo Performance Materials (Non-binding MOU for 50% offtake of stage 1)
Commodity
Valuable Magnet Rare Earth ~25% of TREO with all four key Rare Earth Element (REE) present
including strategically valuable heavy REE’s Dysprosium and Terbium ~3%
Stage
Exploration and Development
Drilling
~64,000 metres drilled since 2021
Resource
236Mt @ 748ppm TREO - Includes higher-grade subset of 68Mt grading over 1000ppm
Growth Potential
Compelling scope for ongoing Mineral Resource growth with mineralisation open to the north
and south and the current 236 Mt Mineral Resource covers only ~2% of total Koppamurra tenure
11 | Australian Rare Earths 2025 Annual Report
Operations Review
KOPPAMURRA PROJECT
Australian Government International
Partnerships in Critical Minerals Grant
In December 2024, AR3 was awarded a $5 million grant from the Australian Government's International Partnerships
in Critical Minerals Program for Koppamurra. Under the program, AR3 will match the grant funding, bringing the total
planned expenditure to $10 million spread over 2025 and 2026.
Bulk leach test work
12
Key deliverables planned and enabled by the grant funding at Koppamurra include:
Metallurgical Testwork and Flowsheet Development:
Metallurgical processing testwork to optimise and
enhance the Project’s process flowsheet, including
heap leach engineering deliverables and equipment
selection.
PFS Study:
Evaluation of the progressive heap leach and rapid
rehabilitation flowsheet from the mine through to
a Mixed Rare Earth product, including social,
environmental, and economic assessments.
• Metallurgical testwork commenced in April
2025 to refine progressive heap leach and rapid
rehabilitation methods, supporting the PreFeasibility Study (PFS) and enhancing project
value. A ~3 tonne bulk leach trial at Brisbane Met
Labs was completed delivering magnet rare earth
recoveries of >60%.
Demonstration Plant Construction:
Selection and optimisation of demonstration-scale
equipment, along with the construction of process
infrastructure based on design inputs from the
flowsheet development and PFS.
• Ongoing optimisation testwork focusing on
optimising rare earth recovery, impurity removal,
and Mixed Rare Earths Carbonate (MREC)
precipitation.
Demonstration Plant Operation:
Full-scale demonstration operation to validate
process design, supporting the pathway to
commercialisation.
The Agreement is between the Commonwealth of Australia, represented by the Department of Industry, Science and
Resources and Australian Rare Earths Limited.
Managing Director, Travis Beinke with Chantelle Bardadyn (WGA) at BML for bulk leach testwork
13 | Australian Rare Earths 2025 Annual Report
Operations Review
KOPPAMURRA PROJECT
Exploration and Resource Growth
AR3 continued to expand and upgrade the Koppamurra resource during the year. A Mineral Resource estimate update
was released in September 2024 which incorporated results from a comprehensive drilling program completed in
December 2023.
With the additional drilling (694 holes for 8,742m) and through the application of industry-standard geological
interpretation methods, the total Mineral Resource estimate across the Koppamurra Project area increased by 27% to
236 Mt, with an average TREO grade of 748 ppm.
The updated Mineral Resource estimate included 68 Mt grading over 1000ppm TREO, representing a 70% increase on the
previous estimate, highlighting the potential for an initial higher-grade project development plan.
The current Mineral Resource estimate is set out in the table below (updated September 2024):
JORC
Tonnes TREO
Magnet Rare Earths
Praseodymium
Neodymium Terbium
Dysprosium
Category
Mt
ppm
ppm % TREO
ppm % TREO
ppm % TREO
ppm % TREO
Measured
0.8
813
37
4.6
140
17.3
3.8
0.5
21
2.6
Indicated
112
750
34
4.6
132
17.6
3.6
0.5
20
2.7
Inferred
123
747
35
4.6
132
17.6
3.4
0.5
19
2.6
Total
236
748
35
4.6
132
17.6
3.5
0.5
20
2.6
Rounding may cause differences in the last significant figure
Koppamurra Resource Growth
250
Million Tonnes
200
150
100
Measured
Indicated
50
Inferred
0
14
Apr-21
Jul-22
Mar-23
Sep-23
Sep-24
AR3 continues to advance a high-grade progressive heap leach and rapid rehabilitation development pathway at
Koppamurra. This approach aligns with AR3's commitment to developing a sustainable alternative supply of rare earths
essential for the clean energy transition.
Key design features and advantages of the progressive heap leach pathway compared to a slurry leach are as follows:
Design Features:
Design Advantages:
• High-grade satellite mine sites with temporary
heap pads located at the edge of the satellite
mine void.
• Significantly lower capital and operating costs.
• Topsoil and overburden material set aside for rapid
and progressive land rehabilitation after rare earths
have been harvested.
• Environmentally sustainable characteristics,
including lower water consumption, reduced
power consumption, and rapid, progressive
rehabilitation techniques.
• Intermediate MREO precipitate significantly
reducing solution volumes and equipment sizes
for downstream IR and MREC production and
facilitates the efficient recycling of water in the
process flowsheet.
• Easy expansion and scaling up of production over
time across the multi-generational province.
• Lower gangue/impurity profile with higher rare
earth in solution characteristics through column
leach, resulting in lower capital and operating costs.
15 | Australian Rare Earths 2025 Annual Report
Operations Review
KOPPAMURRA PROJECT
Koppamurra Conceptual Project Flow Sheet
A simple process with low technical risks and environmentally sustainable.
RECLAIMED SOLUTION
RECYCLED WATER &
LEACHING SOLUTION
WASHING SOLUTION
CLAY
PREPARATION
RARE EARTHS
IN SOLUTION
4-10m
TEMPORARY
HEAP
RAPID
REHABILITATED
MINE VOID
SOIL / SUBSOIL
OVERBURDEN PLACEMENT
NEUTRALISED CLAY
WATER
TREATMENT
Looking Ahead
AR3 remains focused on advancing Koppamurra as a strategic and secure source of light and heavy rare earths,
helping to create new and diversified supply chains vital to the world’s clean energy transition.
16
IMPURITY
REMOVAL
MIXED RARE
EARTH PRODUCT
MIXED RARE
EARTHS
CARBONITE
TO MARKET
17 | Australian Rare Earths 2025 Annual Report
Operations Review
18
KOPPAMURRA MINERAL RESOURCES
Highlights
Mineral Resource estimate
increased 27% to 236 Mt at
748 ppm TREO (up from
186 Mt at 712 ppm TREO
relative to the September
2023 Mineral Resource
estimate).
Higher-grade component:
68 Mt grading over 1,000
ppm TREO, a 70% increase
on the previous Mineral
Resource estimate.
Measured and Indicated
categories increased to 113
Mt, representing a 14% uplift
in higher confidence resources
relative to the previous
Mineral Resource estimate.
Geographic extension added
25 Mt in the northern area.
Mineralisation remains open
to the north and south, with
the current 236 Mt Mineral
Resource covering only ~2%
of the total Koppamurra
tenure.
The updated Mineral Resource
incorporates results from
8,742 m of drilling (694 holes)
completed between October
and December 2023, bringing
the total drilling to over
64,700 m across 5,977 holes.
Interpretation of the geological samples and assays using relevant industry standard methods has resulted in a 27%
increase to a total Mineral Resource estimate of 236 Mt at an average TREO grade of 748 ppm.
This includes 113 Mt in the Measured and Indicated categories, representing a 14% increase compared to the
September 2023 estimate.
The interpretation also resulted in a revised Exploration Target, which now ranges from 500 Mt at 780 ppm TREO to 3.2 Bt
at 520 ppm TREO. The potential quantity and grade of the Exploration Target is conceptual in nature, as there has been
insufficient exploration undertaken to estimate a Mineral Resource, and it is uncertain if further exploration will result in
the estimation of a Mineral Resource.
19 | Australian Rare Earths 2025 Annual Report
Operations Review
KOPPAMURRA MINERAL RESOURCE ESTIMATE
KOPPAMURRA MINERAL RESOURCE ESTIMATE - September 2024
JORC
Tonnes TREO
Magnet Rare Earths
Praseodymium Neodymium Terbium
Dysprosium
Category
Mt
ppm
ppm % TREO
ppm % TREO
ppm % TREO
ppm % TREO
Measured
0.8
813
37
4.6
140
17.3
3.8
0.5
21
2.6
Indicated
112
750
34
4.6
132
17.6
3.6
0.5
20
2.7
Inferred
123
747
35
4.6
132
17.6
3.4
0.5
19
2.6
Total
236
748
35
4.6
132
17.6
3.5
0.5
20
2.6
Rounding may cause differences in the last significant figure.
The updated Mineral Resource estimate incorporates results from the drilling program conducted between October
and December 2023. The overall program added 8,742m (694 holes) to the existing 55,979m (5,283 holes) drilled for the
previous Mineral Resource estimate announced September 2023.
Interpretation of geological samples and chemical assay
data using relevant industry standard methods resulted
in a significant increase in overall resource tonnes,
contained metal, and continuity of mineralisation.
The updated resource continues to expand with a 27%
increase in the MRE and a 70% boost in the higher-grade
subsets.
Drill spacings to satisfy the Indicated and Measured JORC
Resource Categories are at 120 m and 60 m respectively.
The drilling which informs the Exploration Target is at line
spacings of at least 1 km, and sometimes 2 km apart.
Drill hole spacings along the lines are typically 100m to
400m apart.
The updated September 2024 Mineral Resource estimate
is set out in the above table. This Resource has been
reported using a cut-off grade of 325 ppm TREO-CeO2.
20
KOPPAMURRA RESOURCE GROWTH
A summary of Mineral Resource estimates over time,
demonstrating the progressive increase in resource.
250
200
Million Tonnes
Interpretation of the geological samples and assays
using relevant industry standard methods has resulted
in an increase of 27% to 236 Mt of total Mineral Resource
estimate with an average TREO grade of 748 ppm.
This includes 113 Mt in the Measured and Indicated
categories.
150
100
50
0
Apr-21
Measured
Indicated
Inferred
Jul-22
Mar-23
Sep-23
Sep-24
GLOBAL KOPPAMURRA PROJECT JORC CLASSIFICATION (>325 PPM TREO-CEO2)
21 | Australian Rare Earths 2025 Annual Report
Operations Review
KOPPAMURRA EXPLORATION TARGET ESTIMATE
The Exploration Target across the entire Koppamurra project has increased the lower range of the Exploration Target,
which now spans from 500 Mt to 3.2 Bt with average grades ranging from 520 ppm to 780 ppm TREO, marking an
improvement from the previous range of 330 Mt to 3.1 Bt.
The potential quantity and grade of the Exploration Target is conceptual in nature, as there has been insufficient
exploration undertaken to estimate a Mineral Resource and it is uncertain if further exploration will result in the estimation
of a Mineral Resource.
The updated September 2024 Exploration Target estimate is set out in below table. The Exploration Target has been
reported using a cut-off grade range of 225 ppm and 425 ppm TREO-CeO2.
EXPLORATION TARGET - September 2024
Tonnes TREO
Total
MAGNET RARE EARTHS
Praseodymium
Neodymium Terbium
Dysprosium
Mt
ppm
ppm % TREO
ppm % TREO
ppm % TREO
ppm % TREO
500-3,200
520 - 780
20 - 40
90 - 140
3-4
13 - 20
3.8 - 5.1
17 - 18
0.5 - 0.6
1.9 - 2.6
The potential quantity and grade of the Exploration Target is conceptual in nature. There has been insufficient exploration
to estimate a Mineral Resource, and it is uncertain if further exploration will result in the estimation of a Mineral Resource.
22
Infill Drilling
The infill drilling area was specifically targeted for detailed comparison with the previous Mineral Resource estimation
due to its location within the current proposed mining lease application area.
This area provides a clear example of how the recent model improvements, driven by additional drilling, have improved
the Mineral Resource model. By focusing on this zone of infill drilling, it demonstrated the positive impact of the updated
model and its potential for future mining operations.
The Mineral Resource estimation subset within the infill drilling area increased by 2.8 million tonnes with additional infill
drilling. The key magnet rare earth elements Neodymium, Praseodymium, Dysprosium, and Terbium either increased
slightly or remained unchanged in their contribution to the increased resource in this area. This is a positive outcome as
the drilling density increased to closer spacings, providing increased confidence in the continuity of the resource and of
a higher-grade component within it.
The closer spaced infill drilling improved the definition of geological domain contacts, including an overall thickening of
the REE bearing clay (Zone 3) which resulted in an increase in tonnes. This result enhances confidence in the Resource, as
the grade remained stable while the improved domain control contributed to a higher overall tonnage.
COMPARISON OF THE INFILL DRILLING AREA RESOURCE CUT-OUT
Showing the September 2023 Mineral Resource model (left) and revised 2024 Mineral Resource model (right).
The additional drilling within the infill drilling area informing the updated model has defined continuous,
higher-grade NW-trending zones, leading to an increase in overall tonnage within this area.
23 | Australian Rare Earths 2025 Annual Report
Operations Review
URANIUM PORTFOLIO
24
OVERLAND URANIUM PROJECT
Project Overview
AR3 has made substantial strides in establishing the multi-commodity potential of its Overland Project in South Australia.
What began as a frontier uranium play has evolved into a dual-pathway strategy encompassing both uranium and
copper-gold mineralisation.
Location
South Australia, ~200km south of Honeymoon Mine
Scale/Size
~7,000km2
Ownership
~6,000km2 100% and ~1,000km2 AR3 Farm-In for 100% sedimentary hosted uranium rights
Commodity
Uranium, Copper, Gold
Stage
Greenfields exploration targeting In-Situ Recovery (ISR) amenable and near surface calcrete-hosted
uranium deposits
Strategic review reveals Cu-Au potential in basement rocks complementing sedimentary hosted uranium
exploration
Drilling
Active drill program following up new surficial uranium and deeper, ISR-amendable exploration targets
Initial Results
Discovery of widespread near surface calcrete hosted uranium mineralisation
ISR-amenable geological model confirmed with a north/south trending palaeovalley setting defined,
providing for the accumulation of thick sequences of prospective stratigraphy; interbedded sands,
clays and lignite horizons
Growth Potential
Frontier uranium region, limited prior exploration
Multiple high-priority targets to test
Copper and Gold potential in basement rocks; Delamerian region emerging as highly prospective
for multiple mineralised styles including porphyry, skarn, orogenic gold, VMS and sediment-hosted
mineralisation
25 | Australian Rare Earths 2025 Annual Report
Operations Review
OVERLAND URANIUM PROJECT
Exploration
The inaugural drilling campaign at the Overland Project commenced in October 2024, and included 25 Air Core drill
holes totalling 3,271 meters. Initial results provided compelling evidence supporting AR3’s geological model for ISR
amenable deposits.
Drilling confirmed thick sequences of Murray group stratigraphy containing sands and clays, with identified permeability
pathways crucial for uranium-bearing groundwater migration.
The program also revealed a north/south trending palaeovalley with lignite horizons on the western margin, highlighting
strong mineralisation potential and setting up key follow-up targets for 2025.
During 2025, AR3 confirmed two distinct uranium mineralisation styles at Overland:
Roll-Front Uranium System:
A drilling program in May 2025 identified a clear
roll-front gamma signature in permeable sands at
the base of the sedimentary sequence. The setting—
within a sinuous basement low—is ideally suited for
in-situ recovery (ISR)-amenable uranium deposition.
Calcr