Quarterly Activities Report
For the three months ended 30 September 2024
Highlights
Koppamurra Rare Earths Project
o Metallurgical test work affirms low capex development pathway for Koppamurra; Ongoing heap leach test
work shows recoveries for Magnet Rare Earths, ranging from 29% to 74% across various ore conditions and
locations within the Koppamurra Project area (ASX 8 July 2024).
o Significant Resource Expansion at Koppamurra: Mineral Resource estimate increased by 27% to 236 million
tonnes (Mt) at 748 ppm TREO 1 as compared to 186 million tonnes at 712 ppm TREO previously 2.
Uranium Projects
o Acquisition of uranium tenements completed and permits in place for imminent commencement of
uranium exploration drill program.
o Strategic acquisition of the Overland Uranium Project (Overland) in South Australia, completed (ASX 3
September 2024).
• Comprises EL 7001 and EL 7003 located in the Murray Basin, South Australia totalling ~2,000km2.
• Additional EL 7005 granted, increasing total project area to ~3,000km².
o Received SA Government Departmental approvals for Exploration Program for Environment Protection and
Rehabilitation (EPEPR) applications at Overland (ASX 25 September 2024);
• Facilitates early access to high-priority drill targets across the substantial ~3,000km2 project area.
• Applications in train allowing access to further high priority targets in 2025.
o Inaugural drill program, for approximately 5,000m of Air Core drilling, on track to begin mid-October 2024.
o Consistent with AR3’s strategic focus on an expanded clean energy transition metals portfolio, the Company
applied for additional exploration licenses prospective for uranium;
• Triggs Bore prospect: spanning 250 km2 with historical drilling intersecting indications of uranium
mineralisation within Eyre Formation sediments, host of the Four Mile and Honeymoon uranium
deposits (ASX 16 July 2024).
• Hamilton Creek prospect: covers 200 km2 in the Callabonna Sub-basin targeting the anomalous
downhole gamma response detected in previous drilling, indicating potential uranium mineralisation
(ASX 23 July 2024).
Corporate
o Maintained strong cash position of $5.624M as of 30 September 2024; further strengthened by $707k R&D
cash refund received in October 2024.
o Annual Report released 24 September 2024.
o Engage with this announcement at the AR3 investor hub.
1 Total Rare Earth Oxide (TREO)
2 ASX 19 September 2023 “84% increase in Resource confirms Koppamurra as a world-scale ionic clay-hosted rare earths Province”
Executive Summary
Australian Rare Earths Limited (ASX: AR3) is pleased to provide an update on progress made during the
quarter ended 30 September 2024.
AR3 has achieved significant milestones in its exploration and development projects, with a strong focus on
building a robust portfolio of high-quality energy transition assets.
Koppamurra Rare Earths Project
The Koppamurra Project achieved significant growth in the September quarter, with a 27% increase in its
Mineral Resource estimate and a 70% boost in higher-grade subsets. The current Mineral Resource estimate
now sits at 236 million tonnes (Mt) at 748 ppm TREO, including 68 Mt grading at over 1000 ppm TREO (ASX
30 September 2024).
Infill drilling has identified thicker, higher-grade mineralised areas, and the Project's geographic extent has
expanded to include 25 million tonnes of additional resources to the north of the main resource area. With
mineralisation open to the north and south, Koppamurra demonstrates strong potential for both continued
resource growth and a long-life production profile.
AR3 continues to advance a high-grade progressive heap leach and rapid rehabilitation development pathway
at Koppamurra. This approach aligns with AR3's commitment to developing a sustainable alternative supply of
rare earths essential for the clean energy transition.
Portfolio expansion with addition of Uranium prospects
AR3 made significant steps in expanding its clean energy transition metals portfolio with the addition of three
Uranium projects in the September 2024 quarter. The Company successfully acquired Valrico Resources Pty
Ltd, securing 100% ownership of the Overland Uranium Project and subsequently further expanded its
landholding to ~3,000km². Government approvals were obtained for exploration activities, paving the way for
the first drill campaign, which is on-track to commence in mid-October 2024.
The inaugural drill campaign at Overland is targeting sedimentary-hosted uranium deposits amenable to Insitu recovery (ISR) extraction. Overland’s geological conditions, including permeable pathways and reductants,
are favourable for uranium mineralisation.
AR3 has applied for additional exploration licenses prospective for uranium at Triggs Bore and Hamilton Creek.
Financial Position
AR3 has maintained a strong cash position over the September quarter, supporting the Company’s capacity to
drive the development of its key projects and thereby generate value for shareholders.
Operational Review
Koppamurra Rare Earths Project
Metallurgical Test work Validates Low-Cost Development Pathway
Ongoing metallurgical testing at AR3’s Koppamurra Project continues to reinforce the potential for a low-capex
development pathway. Recent heap leach trials have demonstrated consistently strong recoveries for Magnet
Rare Earths, with extraction rates ranging from 29% to 74% across a range of ore conditions and locations
within the project area. Notably, these results were achieved within significantly shorter timeframes compared
to traditional heap leaching processes, enhancing confidence in AR3's strategy of employing short-term heaps
adjacent to mine pits for faster rehabilitation.
The scalability of this approach is underscored by a successful 4-meter column test, which showed promising
physical and chemical characteristics, supporting the potential for increasing heap heights to commercially
viable levels. In addition, the low ratio of impurities to rare earth content in the leach solution continues to
validate the potential economic viability of heap leaching as a cost-effective and sustainable extraction method
for the project.
AR3’s collaboration with the Australian Nuclear Science and Technology Organisation (ANSTO) on process
flowsheet development further supports the optimisation of this innovative strategy.
Figures 1 and 2 below show rare earth recoveries from the latest column tests at ANSTO and the composite
sample locations for the test work respectively.
Figure 1: Rare earth recoveries for Columns 3, 7, 8, 9 and 10, showing gangue dissolution characteristics (Al / Fe / Si) with respect to
ore variability at constant pH. Notable here is the decreased extraction for C7 ore which had greater calcium concentration, aiding in
understanding the target ore characteristics for mining
Figure 2: Composite sample locations for Column leach test work, with Column ID’s C1 through C6 (blue)
Progressive heap leach, high grade rare earths pathway
Additional drilling, assay results (ASX releases 30 January and 26 February 2024), and resource modelling at
Koppamurra have identified a high-grade rare earth subset of the broader Koppamurra resource. These highgrade ore zones, and the application of temporary heap leaching production pathways, are expected to
facilitate scalable, efficient production of rare earths with staged satellite developments enhancing the
favourable environmental outcomes from a development of this type.
A conceptual project process flowsheet is provided at Figure 3. Some of the design features and resulting
advantages for the Koppamurra project with a progressive heap leach pathway compared to a slurry leach are
as follows:
Design Features:
•
•
•
High-grade satellite mine sites with temporary heap pads located at the edge of the satellite mine
void;
Topsoil and overburden material temporarily set aside ready to be placed back in the mine void after
rare earths have been harvested from the clay and the clay has been washed – allows rapid and
progressive land rehabilitation;
Water treatment equipment located proximate to the temporary heap pads will facilitate recycling
and reuse of water and reagents.
Design advantages include:
•
•
•
•
Potential for a significantly lower capital cost and reduced operating cost project;
Opportunity to easily expand and scale up production over time across the multi- generational
province;
Enables improved environmentally sustainable characteristics with;
o Very low water consumption;
o Reduced power consumption; and
o Materials handling characteristics will enable environmentally sustainable and rapid,
progressive rehabilitation techniques
Testwork also indicates lower gangue/impurity profile with higher rare earth in solution characteristics
through column leach resulting in lower capital and operating cost.
Figure 3: Koppamurra conceptual project flow sheet
Mineral Resource Estimate
During the quarter, AR3 significantly expanded its Koppamurra Mineral Resource estimate with a 27%
increase in the MRE and a 70% boost in the higher-grade subsets (ASX 30 September 2024).
The updated Mineral Resource estimate incorporates results from the drilling program conducted
between October and December 2023. The overall program added 8,742m (694 holes) to the existing
55,979 m (5,283 holes) drilled for the previous Mineral Resource estimate announced September
2023 (ASX 19 September 2023).
With the additional drilling and applying industry-standard geological interpretation methods, the
total Mineral Resource estimate across the Koppamurra Project area has increased by 27% to 236 Mt,
with an average TREO grade of 748 ppm. This includes 113 Mt categorised as Measured and Indicated
resources - a 14% increase to these higher confidence resource classifications relative to the
September 2023 Mineral Resource estimate.
The updated September 2024 Koppamurra Mineral Resource estimate is set out in Table 1 and the
resource categories are shown in Figures 5 and 6. This Resource has been reported using a cut-off
grade of 325 ppm TREO-CeO2.
Koppamurra Mineral Resource estimate – September 2024
Magnet Rare Earths
JORC
Tonnes
TREO
Category
Mt
ppm
ppm
% TREO
ppm
% TREO
ppm
% TREO
Measured
Indicated
Inferred
0.7
112
123
813
750
747
37
34
35
4.6
4.6
4.6
140
132
132
17.3
17.6
17.6
3.8
3.6
3.4
0.5
0.5
0.5
Total
236
748
Pr6O11
35
4.6
Nd2O3
132
17.6
Tb4O7
3.5
0.5
Dy2O3
%
ppm
TREO
21
2.6
20
2.7
19
2.6
20
2.6
Table 1: Koppamurra Mineral Resource estimate September 2024 - Rounding may cause differences in the last significant figure
A summary of the Koppamurra Mineral Resource estimate’s over time, demonstrating the progressive
increase in resource, is provided in Figure 4. The steady increase reflects the success of AR3’s ongoing
exploration work and strategic drilling programs leading to more accurate modeling and Mineral
Resource estimates.
Figure 4: Koppamurra Mineral Resource progression
Exploration Target Estimate
The Exploration Target across the entire Koppamurra project has increased the lower range of the Exploration
Target, which now spans from 500 Mt to 3.2 Bt with average grades ranging from 520 ppm to 780 ppm TREO,
marking an improvement from the previous range of 330 Mt to 3.1 Bt. The potential quantity and grade of the
Exploration Target is conceptual in nature, as there has been insufficient exploration undertaken to date to
estimate a Mineral Resource and it is uncertain if further exploration will result in the estimation of a Mineral
Resource.
The updated September 2024 Exploration Target estimate is set out in Table 2 below and shown in Figure 6.
Exploration Target has been reported using a cut-off grade range of 225 ppm and 425 ppm TREO-CeO2.
Koppamurra Exploration Target – September 2024
Exploration
Tonnes
TREO
Target
Mt
ppm
Total
500-3,200
520 - 780
Magnet Rare Earths
Pr6O11
Nd2O3
Tb4O7
%
%
ppm
ppm
% TREO
ppm
TREO
TREO
20 - 40
3.8-5.1
90 - 140
17-18
3-4
0.5-0.6
Table 2– Koppamurra Exploration Target September 2024
Dy2O3
ppm
% TREO
10 - 20
1.9-2.6
Figure 5: JORC Mineral Resource Categories for the Southern Koppamurra (Dovetail) Resource Area. Infill drilling area shown in white
outline
Figure 6: Entire Koppamurra Resource areas and Categories including southern (Dovetail) and northern (Francis) Resource Areas. Note
the Inferred resource categories defined in the northern Francis Resource Areas are exclusively where infill drilling has been conducted
Uranium Prospects
Strategic Expansion of Clean Energy Transition Metals Portfolio: Overland Uranium Project
In line with AR3's strategic objective of expanding its clean energy transition metals portfolio, the
Company has significantly broadened its strategic footprint with the addition of three highly prospective
uranium projects.
During the Quarter, AR3 acquired a 100% interest in the Overland Uranium Project through the acquisition
of Valrico Resources Pty Ltd (ASX 3 September 2024). The project encompasses Exploration Licences
EL7001, EL7003 and EL7005, covering a combined area of approximately 3,000 km² within the Murray
Basin, South Australia.
Figure 7: Overland Project area
Multiple high-priority exploration targets have been identified in the Overland Project, with a particular focus
on paleochannel sediments within the Renmark Group. These sediments are considered geologically analogous
to those hosting Boss Energy's uranium operations in the Eyre Formation.
Background: Overland – Sedimentary Hosted Uranium Prospectivity
Three key characteristics are required for the deposition of sedimentary hosted uranium deposits:
o
a source rock that releases uranium in solution,
o
a permeable sediment pathway for the uranium-bearing solution to travel into a host basin and
o
A reductant (a trap) to cause the uranium to precipitate out of solution and concentrate it in a
deposit.
All three key characteristics are present in AR3’s Overland Project area. Prospective horizons of Murray Basin
sediments, the Renmark Group, have been identified which have the key ingredients for ISR amenable uranium
deposits at Overland.
Figure 8: Model of basin-related uranium mineralising systems. A range of uranium depositional sites and deposit styles are
represented in this district- to deposit scale mineral systems model
EPEPR Approval
During the quarter, AR3 secured a significant milestone for its Overland Uranium Project with the approval of
two Exploration Program for Environment Protection and Rehabilitation (EPEPR) applications by the South
Australian Department of Energy and Mining (ASX 16 September 2024).
These approvals pave the way for AR3 to initiate its first drill program, targeting high-priority targets within
the project area.
The EPEPR approvals cover a portion of AR3's 100%-owned Exploration Licence EL 7001 and EL 7003. The initial
approval for drill testing covers 773km², providing early access to promising targets.
AR3 is strategically approaching regulatory and land access approvals for the entire 3,000km² project area,
prioritising high-potential targets in areas with quicker access while addressing land access approvals for other
regions in a phased manner.
Figure 9: Overland Project area with granted EPEPR approvals
Inaugral Drilling Program at Overland
The Company has contracted Wallis Drilling Pty Ltd and secured a drill rig, which will mobilise to the site in
mid-October to commence drilling. The first phase, scheduled to run from mid-October to December 2024,
will involve approximately 5,000 meters of Air Core drilling at high-priority targets within ELs 7001 and 7003.
Triggs Bore and Hamilton Creek Prospects
During the quarter, AR3 added the Triggs Bore and Hamilton Creek prospects to its uranium portfolio. The
Triggs Bore prospect, spans 250 km² and features historical drilling that intersected uranium mineralisation
within the Eyre Formation sediments, similar to the host of the Four Mile and Honeymoon uranium deposits.
The Hamilton Creek prospect, covers 200 km² in the Callabonna Sub-basin and exploration will focus on
anomalous downhole gamma responses detected in previous drilling, indicating the potential presence of
uranium mineralisation.
Figure 10: Hamilton Creek ELA relative to the Overland and Triggs Bore Projects (left) and regional geology (right)
Northern Queensland Rare Earths Project
No exploration activities were conducted over the Company’s Queensland projects during the reporting
period. Tenement application EPM28166 at the Dalrymple Project was granted during the quarter.
Applications are currently pending for additional exploration tenure, which will cover new areas including the
Forty Mile Scrub, Sandy Tate, and Oaky Valley prospects. These new areas are expected to provide significant
opportunities for future exploration and potential resource discoveries.
Figure 11: Dalrymple Project Location Plan
Figure 12: Project locations in Kennedy Province, North Queensland
Corporate Updates:
Investor Webinars
During the quarter, Managing Director and CEO Travis Beinke held an investor webinar to answer questions
from investors via the Company’s Investor Hub platform. The recording was released to the ASX on 1 July 2024.
The webinar encouraged investors to ask questions and learn more about Australian Rare Earths’ progress on
the Koppamurra Project, a major deposit of valuable rare earth elements in South Australia and Victoria. Travis
also talked about the Company’s plans to develop a sustainable supply of metals for clean energy, including
the recent addition of the Overland Uranium Project in South Australia (ASX 21 June and 1 July 2024).
Travis also participated in a live webinar through investor platform, Sharewise, to discuss advancements at
both the Overland and Koppamurra Projects (ASX 16 and 17 July 2024).
Annual Report
During the quarter, AR3 released its annual report to shareholders (ASX 24 September 2024) and shortly after
quarter end put a notice out for the Annual General Meeting (ASX 2 October 2024).
Events Subsequent to the Reporting Period
The Company received a cash refund of $707,638 relating to eligible research and development tax credits
on 10 October 2024.
Listing Rule 5.23 Disclosure
The Company confirms that it is not aware of any new information or data that materially affects the
Exploration Results and/or the estimates of Mineral Resources in this release, and in respect of the estimates
of Mineral Resources reported, that all material assumptions and technical parameters underpinning the
estimates continue to apply and have not changed.
List of Tenements
Tenement
EL6509
EL6613
EL6690
EL6691
EL6942
EL6943
EL007254
EL007719
EL008208
EL008254
EMP27952
EMP28169
EMP28168
EMP28165
EPM28167
EPM28166
EL7001
EL7003
EL7005
EL7010
EL7011
Location
Naracoorte
Frances
Keith
Bordertown
Wattle Range
Tarpeena
Apsley
Minimay
Lake Mundi
Dartmoor
Massie Creek
Stones Creek
Mt Wickham
Riverside
Burdekin
Dalbeg
Warnes
Bunyung
Sturt Vale
Wirrealpa
Moolawatana
Commodity
Rare Earths
Rare Earths
Rare Earths
Rare Earths
Rare Earths
Rare Earths
Rare Earths
Rare Earths
Rare Earths
Rare Earths
Rare Earths
Rare Earths
Rare Earths
Rare Earths
Rare Earths
Rare Earths
Uranium
Uranium
Uranium
Uranium
Uranium
Project
Koppamurra
Koppamurra
Koppamurra
Koppamurra
Koppamurra
Koppamurra
Koppamurra
Koppamurra
Koppamurra
Koppamurra
Massie Creek
Dalrymple
Dalrymple
Dalrymple
Dalrymple
Dalrymple
Overland
Overland
Overland
Triggs Bore
Hamilton Creek
1 – All tenements are 100% held by AR3
Finance Update
The Company’s cash balance at the end of the Quarter was A$5,624,000.
Capital Structure
Shares on issue: 157,963,745 fully paid ordinary shares.
Options on issue: 29,371,480 unlisted options, comprising:
• 1,600,000 exercisable at $1.44 and expiring 1 December 2024
• 6,000,000 exercisable at $0.30 and expiring 25 January 2025
• 8,163,147 exercisable at $0.57 and expiring 9 May 2025
• 1,000,000 exercisable at $1.02 and expiring 9 May 2025
• 500,000 exercisable at $0.57 and expiring 4 July 2025
• 2,000,000 exercisable at $0.60 and expiring 29 July 2025
Jurisdiction
SA
SA
SA
SA
SA
SA
Victoria
Victoria
Victoria
Victoria
QLD
QLD
QLD
QLD
QLD
QLD
SA
SA
SA
SA
SA
•
•
•
•
•
•
•
1,750,000 exercisable at $0.50 and expiring on 2 December 2025
500,000 exercisable at $0.47 and expiring on 28 February 2026
1,500,000 exercisable at $0.37 and expiring on 26 November 2026
1,500,000 exercisable at $0.50 and expiring on 26 November 2026
1,550,000 exercisable at $0.50 and expiring on 2 December 2026
1,500,000 exercisable at $0.4739 and expiring on 20 December 2026
1,808,333 exercisable at $0.435 and expiring on 26 November 2027
Appendix 5B Disclosures
AR3’s accompanying Appendix 5B (quarterly Cashflow Report) includes an amount in item 6.1 which
constitutes executive remuneration and non-executive director fees for the quarter. In item 6.2 of the
accompanying Appendix 5B the included amount relates to the 100% acquisition of Valrico Resources Pty
Ltd.
During the period, the Company spent approx. $762,000 on exploration activities, including direct costs
associated with the Koppamurra exploration and development programs, which included, drilling,
geochemical assays, metallurgical test work. This figure also includes allocation of wages directly
attributed to specific exploration and development activities.
The Board of Australian Rare Earths authorised this announcement to be released to the ASX.
For further information please contact:
Australian Rare Earths Limited
Travis Beinke
Managing Director and CEO
T: 1 300 646 100
Media Enquiries
Jessica Fertig
Tau Media
E: info@taumedia.com.au
We encourage shareholders and followers to ask any questions here: https://investorhub.ar3.com.au/
About Australian Rare Earths Limited
Australian Rare Earths is committed to the timely exploration and development of its 100% owned,
flagship Koppamurra Project, located in the new Koppamurra rare earths Province in southeastern South
Australia and western Victoria. Koppamurra is a prospective ionic clay hosted rare earth deposit, rich in
all the elements required in the manufacture of rare earth permanent magnets which are essential
components in electric vehicles, wind turbines and domestic appliances. In addition, AR3 is actively
reviewing other potential prospective areas which may also host uranium and ionic clay hosted rare earth
deposits throughout Australia.
The Company is focused on executing a growth strategy that aims to position AR3 as an independent and
sustainable source of energy transition metals, playing a pivotal role in the global transition to a green
economy.
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Australian Rare Earths Limited
ABN
Quarter ended (“current quarter”)
73 632 645 302
30 September 2024
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date
(3 months)
$A’000
-
-
(a) exploration & evaluation
-
-
(b) development
-
-
(c) production
-
-
(d) staff costs - net of allocations to
capitalised exploration assets
(464)
(464)
(e) administration and corporate costs
(399)
(399)
-
-
79
79
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives –
R&D Tax incentive
-
-
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating
activities
(784)
(784)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(570)
(570)
-
-
(1)
(1)
(762)
(762)
(e) investments
-
-
(f)
-
-
(a) entities
(b) tenements
(c) property, plant and equipment
(d) exploration & evaluation
other non-current
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(3 months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
(1,333)
(1,333)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
-
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
-
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
(38)
(38)
3.10
Net cash from / (used in) financing
activities
(38)
(38)
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
7,779
7,779
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(784)
(784)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(1,333)
(1,333)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
(38)
(38)
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
5.2
Current quarter
$A’000
Year to date
(3 months)
$A’000
-
-
5,624
5,624
Current quarter
$A’000
Previous quarter
$A’000
5,450
7,605
Call deposits
-
-
5.3
Bank overdrafts
-
-
5.4
Other (Term Deposits)
174
174
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
5,624
7,779
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
* The payments disclosed here relate to fees and salaries paid to
all Directors (including Managing Director) during the quarter.
269
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
*The payment disclosed here relates acquisition costs paid to
Valrico Resources Pty Ltd during the quarter.
570
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
(784)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(762)
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(1,546)
8.4
Cash and cash equivalents at quarter end (item 4.6)
5,624
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
$A’000
5,624
3.64 quarters
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: n/a
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: n/a
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: n/a
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas explor