Annual Report to shareholders
Released
Released
Announcement PDF
24 September 2024
ANNUAL REPORT 2024
Highlights:
•
•
•
•
•
•
•
Mineral Resource Estimate increased by 84% to 186 million tonnes at 712 ppm TREO.
Contained TREO tonnage increased by 60% to 132,000 tonnes over the year.
Significant tenure expansion at Koppamurra, bringing the total project area to 7,399 km2.
Successful drilling program targeting strike extensions and resource definition upgrades.
Improved development pathway with a progressive heap leach and rapid rehabilitation approach.
Strategic diversification of exploration portfolio to include uranium.
Engage with this announcement at the AR3 investor hub.
Australian Rare Earths (ASX: AR3) is pleased to release its Annual Report for the financial year
ended 30 June 2024.
Managing Director, Travis Beinke comments in the Annual Report: “This has been a year of
significant progress and strategic achievements for AR3. I am extremely proud of our team’s
dedication and the milestones we have reached. Our advancement of the Koppamurra Project,
strategic diversification of our exploration portfolio, and commitment to sustainability position us
well in developing a portfolio of energy transition metals projects. Looking ahead, we remain
focused on our strategic growth objectives through the expansion and diversification of our
exploration portfolio and advancing our projects to ensure sustained growth and long-term value
creation.”
The announcement has been authorised for release by the Board of Australian Rare Earths
Limited.
For further information please contact:
Australian Rare Earths Limited
Travis Beinke
Managing Director and CEO
T: 1 300 646 100
Media Enquiries
Jessica Fertig
Tau Media
E: info@taumedia.com.au
About Australian Rare Earths Limited
Australian Rare Earths is committed to the timely exploration and development of its 100% owned, flagship
Koppamurra Project, located in the new Koppamurra rare earths Province in southeastern South Australia and
western Victoria. Koppamurra is a prospective ionic clay hosted rare earth deposit, uniquely rich in all the elements
required in the manufacture of rare earth permanent magnets which are essential components in electric vehicles,
wind turbines and domestic appliances. In addition, AR3 is actively reviewing other potential prospective areas
which may also host uranium and ionic clay hosted rare earth deposits throughout Australia.
The Company is focused on executing a growth strategy that will ensure AR3 is positioned to become an
independent and sustainable source of energy transition metals, playing a pivotal role in the global transition to a
green economy.
Annual Report 2024
2
Chairman’s Letter
4
Managing Director’s Letter
8
Operations Review
Koppamurra Project
11
Uranium Portfolio
14
Queensland Projects
16
Mineral Resources
Highlights
19
Koppamurra Project Mineral Resource Estimate
20
Koppamurra Exploration Target Estimate
21
Tenement Interests
25
Our Footprint
26
Directors’ Report
32
Remuneration Report (audited)
42
Auditor’s Independence Declaration
57
Statement of Profit or Loss and Other Comprehensive Income
60
Statement of Financial Position
61
Statement of Changes in Equity
62
Statement of Cash Flows
63
Notes to the Financial Statements
64
Consolidated Entity Discolsure Statement
89
Directors’ Declaration
90
Independent Auditor’s Report
92
Additional Information
96
Corporate Directory
99
3 | AR3 2024 ANNUAL AND SUSTAINABILITY REPORT
4
Dear Shareholders, I am pleased to present the 2024
Annual Report for Australian Rare Earths Limited (ASX: AR3).
Despite a challenging year for the small-cap resource
sector, we have made significant progress on developing
options for the Koppamurra Rare Earth Project, initiated
strategic diversification to our growing exploration
portfolio in energy transition minerals, and maintained
our focus on creating long-term value for our
shareholders.
So, how did we approach this challenging environment?
Market conditions have been particularly challenging
for junior explorers and developers in critical minerals.
Rare Earth Element (REE) products prices weakened over
the year, and in turn flowed through to poor investor
sentiment and weak share price performances across
most of the listed rare earth sector.
Rare Earths
AR3’s share price has not been immune to this, and I
acknowledge and share your disappointment in this
outcome.
We focused on the factors within our control; and
We made steady progress on our projects, so that
when the cycle and sentiment turns – as they
invariably do, though the timing is unknown the Company is well positioned to capitalise.
The rare earth sector sits at the intersection of two
megatrends of our day: Geopolitics, and Decarbonisation.
Rare Earth Permanent Magnets (REPM) are crucial
components in wind turbines and electric vehicle
motors. They’re also a key input into a range of robotic,
medical and defence applications.
Currently, China dominates both REPMs production and
upstream REE ore mining. Reducing this dependence
has become a key objective for policymakers worldwide.
That’s why the governments of our friends and allies
in the US, European Union (EU), Japan and Korea are
implementing programs to support the development
of diversified, reliable REE supply chains, encompassing
both upstream mining and downstream processing into
REPMs.
And we mean to be a part of it.
The Koppamurra deposit contains all four of the key
rare earth minerals – the ‘light’ Neodymium and
Praseodymium, and the ‘heavy’ Dysprosium and Terbium.
Heavy rare earths are particularly strategic, as China
currently supplies almost all global demand.
This year, AR3 has focused on identifying capitalefficient, cost-effective and environmentally
responsible pathways to bring Koppamurra into
production, subject to permitting and favourable
market conditions.
I’m pleased to report we have made good progress,
as outlined by our Managing Director, Travis Beinke,
in his letter that follows.
5 | AR3 2024 ANNUAL REPORT
As mentioned, government policy initiatives in Australia
and abroad are supporting the development of new REE
supplies.
These include:
The expansion of the Critical Minerals Facility on the
National Interest Account of Export Finance Australia
to $4bn, announced by the Australian Government
in October 2023;
The opening of grant applications for a $40 million
international partnerships program to build end-
to-end critical minerals supply chains, announced
by the Australian Government in February 2024;
The launch of the Mineral Security Partnership
Forum - a collaboration of the US, EU, Australia
and 11 other countries to work together to develop
individual projects and promote a dialogue on
policies that contribute to diversification and
resilience of supply chains – in April 2024;
The announcement of the Critical Minerals Production
Tax Incentive in the May 2024 Federal Budget; and
The signing of a Memorandum of Understanding
between the EU and Australia to establish a
partnership to build critical and strategic minerals
supply chains, in May 2024.
In an age of heightened geopolitical rivalry, ‘industry
policy is back’ in a way we haven’t seen since the 1960s
and 70s, particularly for minerals like rare earths that
are vital to our future energy, transport and defence
systems. Positioning the Company to capitalise on this
trend has been a strategic focus this year.
As an ionic-clay hosted deposit, with the potential for
production via a progressive heap-leach approach and
rapid rehabilitation, Koppamurra could benefit from a
relatively short construction period and lower technical
risk during ramp-up.
This positions it well to be in the vanguard of the next
wave of rare earth producers entering steady-state
production, subject to successful permitting and
supportive market conditions. We are working hard
to ensure government policy and decision makers are
aware of Koppamurra’s potential speed-to-market
edge in a volatile world.
Strategic addition of uranium
As we advance the development pathway at
Koppamurra and pursue early-stage rare earth
exploration in Queensland, we have leveraged our
management team’s expertise to diversify our
portfolio by including uranium exploration projects.
The acquisition of South Australian tenements
prospective for sedimentary-hosted uranium deposits
via in-situ recovery (ISR) mining methods provides the
Company with new opportunities for growth and value
creation.
South Australia currently hosts two operating ISR
uranium mines, and other explorers are active in the
regions where AR3 has secured ground. The target
sequence rocks in our tenements are expected to be
amenable to cost-effective drill-testing. Our team looks
forward to getting on the ground and commencing
exploration this year.
Conclusion
Despite a challenging year for the small-cap mining
sector, the AR3 team has remained focused on
controlling what we can, managing costs, advancing
our flagship project, and adding other value-creation
opportunities to the portfolio.
I extend my sincere thanks to the AR3 management
team for their hard work, creativity and value-added
insights throughout the year.
And I am particularly grateful to you, our shareholders,
for your continued support, and look forward to the
coming year as one of strategic progress on multiple
fronts.
Yours sincerely,
Angus Barker
Chairman
24 September 2024
6
7 | AR3 2024 ANNUAL REPORT
Dear Shareholders, I am pleased to
provide you with a summary
of our strategic achievements and
project progress over the past year,
complementing the Chairman’s
market overview.
Strategic Progress at Koppamurra
Our flagship Koppamurra Rare Earths Project continues
to demonstrate its potential. Over the past year, we
significantly expanded the JORC Mineral Resource
Estimate (MRE) for Koppamurra by 84% to 186Mt of
total MRE with an average Total Rare Earth Oxide (TREO)
grade of 712ppm.
We also continued to demonstrate significant resource
upside potential with an Exploration Target range of 340
million to 3.1 billion tonnes.
With an additional 8,750 metres drilled during the
year, contributing to more than 65,000 meters drilled
since 2021, we have gained further confidence in the
regional extent of the resource potential. The 2024
drilling program focused on extending the known
mineralisation area that had not previously been drill
tested and resource definition upgrades. Pleasingly
the drilling defined new shallow high-grade and high
magnet rare earth mineralisation outside the existing
resource.
As magnet rare earth content is one of the key economic
drivers of rare earth projects, prioritising higher value
mineralisation zones will be an important focus of our
future development plans to maximise the Project’s
value.
In addition to our exploration successes, we have made
significant progress in metallurgical testwork. The
identification of a high-grade progressive heap leach
and rapid rehabilitation pathway strongly aligns with
our commitment to sustainable development.
This innovative approach provides advantages such
as efficient extraction of rare earths while potentially
lowering initial capital and operating costs and
delivering improvements to the project’s environmental
credentials, including reduced water and lower power
consumption.
8
Exploration Portfolio Diversification
Conclusion
In a strategic move to diversify our portfolio and
strengthen our position in the clean energy transition
metals market, we secured an option to the rights for
the Overland Uranium Project, which has now been
exercised.
This has been a year of significant progress and
strategic achievements for AR3. I am extremely proud
of our team’s dedication and the milestones we have
reached.
This project not only broadens our exploration portfolio
but also provides additional opportunities for growth
and value creation.
We are focusing our uranium efforts on projects
with potential for ISR amendable uranium deposits,
positioning us well to leverage our team’s extensive
expertise in uranium exploration.
Subsequent to the year-end, we further expanded our
uranium exploration footprint by applying for two new
exploration licenses: Triggs Bore and Hamilton Creek
in South Australia. These prospects exhibit promising
geological indicators for uranium mineralisation.
In North Queensland we applied for additional
exploration licences in the Kennedy Province, a highly
prospective new rare earth province. The additional
tenure complements our existing Massie Creek and
Dalrymple projects.
Our advancement of the Koppamurra Project,
strategic diversification of our exploration portfolio,
and commitment to sustainability position us well
in developing a portfolio of energy transition metals
projects.
Thank you for your continued support and confidence
in our vision.
Yours sincerely,
Travis Beinke
Managing Director
24 September 2024
Maintaining Capital Discipline
Our strong financial position has enabled us to pursue
new opportunities aggressively.
We have maintained a robust cash reserve, which
supports our capacity to explore and develop new
projects while continuing to advance our Koppamurra
Project.
Investor Engagement and
Future Outlook
Engaging effectively with our shareholders is crucial,
and the launch of our Interactive Investor Hub platform
this year represents a significant step forward in this
regard.
This platform provides our shareholders with timely
updates and insights into our ongoing activities and
strategic initiatives.
Looking ahead, we remain focused on our strategic
growth objectives through the expansion and
diversification of our exploration portfolio and
advancing our projects to ensure sustained growth
and long-term value creation.
9 | AR3 2024 ANNUAL REPORT
10
Koppamurra Project
Project Overview
The Koppamurra Project, located in South-Eastern
South Australia and Western Victoria, is a significant
ionic clay-hosted rare earth deposit.
The project boasts a substantial Mineral Resource
Estimate (MRE) of 186 million tonnes at 712 ppm
TREO, representing a substantial 84% increase from
the previous year. This translates to a contained TREO
tonnage of 132,000 tonnes, a 60% increase yearon-year.
Exploration and Resource Growth
During the year, exploration efforts focused on
expanding and upgrading the Koppamurra resource.
A comprehensive drilling program, encompassing 8,750
meters across 694 holes, targeted strike extensions
and resource definition upgrades. These efforts yielded
encouraging results, defining new shallow high-grade
TREO intercepts and high Magnet Rare Earth Oxide
(MREO).
Infill drilling assay results, received in the March 2024
quarter, confirmed shallow, high-grade mineralisation
within the existing MRE.
Additionally, extensional drilling in a previously
unexplored area, located 25km north of the existing
Koppamurra Resource, successfully intersected shallow,
high-grade mineralisation.
Land Tenure Expansion
During the year, Australian Rare Earths secured
significant tenure extensions at Koppamurra, expanding
its landholding to 7,399 km2. This strategic move
strengthens the Company’s position and paves the
way for sustained exploration and potential future
development.
An initial, low-impact roadside hand auger program
across two new southern tenements identified
shallow, clay-hosted REE mineralisation extending 60
kilometres south of the Koppamurra MRE area.
The program will help guide the next exploration stage
in the southern region and supports the potential for
widespread REE mineralisation.
FY 24 Highlights
Mineral Resource Estimate increased by 84% to
186 million tonnes at 712 ppm TREO.
Contained TREO tonnage increased by 60% to
132,000 tonnes over the year.
Significant tenure expansion at Koppamurra,
bringing the total project area to 7,399 km2.
Successful drilling program targeting strike
extensions and resource definition upgrades.
Improved development pathway with a progressive
heap leach and rapid rehabilitation approach.
Looking Ahead
The Koppamurra Project represents a significant
opportunity for Australian Rare Earths, with substantial
resource growth potential and an improved
development pathway.
The Company remains focused on advancing the project
towards development and production, positioning itself
as a key supplier of critical rare earth elements to the
growing electric vehicle, renewable energy, and robotics
markets.
11 | AR3 2024 ANNUAL REPORT
SA
0
12
25
50km
VIC
Operations Review
Koppamurra Project
Improved Development Pathway
In April 2024, Australian Rare Earths announced an
enhanced development pathway, featuring a highgrade progressive heap leach and rapid rehabilitation
approach.
The high-grade ore zones, and the application of
temporary heap leaching production pathways,
will allow for scalable, efficient production of rare
earths with staged satellite developments enhancing
the favourable environmental outcomes from a
development of this type.
A conceptual project process flowsheet has been
developed (figure below). Design features for developing
the Koppamurra Project via a progressive heap leach
pathway (as compared to a slurry leach), include:
Design Features:
High-grade satellite mine sites with temporary heap
pads located at the edge of the satellite mine void;
Water treatment equipment will be located near
the temporary heap pads to facilitate recycling
and reuse of both water and reagents; and
The extracted top soil and overburden material will
be temporarily set aside ready to be placed back
in the mine void after rare earths have been
harvested from the clay and the clay has been
washed allowing for rapid and progressive
rehabilitation of the land.
Design advantages include:
Potential for a significantly lower capital cost
and reduced operating cost;
Enables improved environmentally sustainable
characteristics with;
• Very low water consumption
• Reduced power consumption
• Improved materials handling characteristics
enabling environmentally sustainable, rapid,
progressive rehabilitation techniques
Testwork also indicates lower gangue/impurity
profile with higher rare earth in solution
characteristics through column leach resulting
in lower capital and operating cost; and
Opportunity to easily expand and scale up production
over time across the multi- generational province.
Koppamurra Conceptual Project Flow Sheet
A simple process with low technical risks which is environmentally sustainable.
13 | AR3 2024 ANNUAL REPORT
Operations Review
Uranium Portfolio
Strategic Extension of
Clean Energy Transition Metals
Portfolio – Uranium
In line with the Company’s strategic focus on expanding
its clean energy transition metals portfolio, Australian
Rare Earths added three highly prospective uranium
projects, broadening its strategic portfolio.
Overland Uranium Project
AR3 broadened its portfolio by entering into an Option
Agreement to acquire 100% ownership of Valrico
Resources Pty Ltd, the holder of the Overland Uranium
Project (ASX, 3 April 2024) with the option exercised in
September 2024.
This project includes Exploration Licence Applications
(ELA) 2024/14 and 2024/15 (subsequently granted as
El7001 and El7003), covering a combined area of 1,981
km2 within the Murray Basin, South Australia, a potential
new uranium province.
AR3 subsequently lodged an additional ELA (2024/22),
(subsequently granted as El7001 and El7003) which will
expand the total project area to approximately 3,000 km2
once granted.
14
Multiple high-potential exploration targets have been
identified within the Overland Project, with a focus on
paleochannel sediments within the Renmark Group,
which are considered geologically analogous to those in
the Eyre Formation, which hosts Boss Energy's uranium
operations (ASX, 7 May 2024).
Triggs Bore Prospect
This 250 km2 prospect features historical drilling that
intersected uranium mineralisation within the Eyre
Formation sediments, the same host as the Four Mile
and Honeymoon uranium deposits (ASX, 16 July 2024).
Hamilton Creek Prospect
Spanning 200 km2 in the Callabonna Sub-basin, this
prospect will focus on an anomalous downhole gamma
response detected in previous drilling, suggesting the
presence of uranium mineralisation (ASX, 23 July 2024).
AR3’s strategic expansion into uranium exploration
underpins its commitment to supporting the clean
energy transition, positioning the Company in the
sustainable development of critical energy resources.
Overland Uranium Project Area
15 | AR3 2024 ANNUAL REPORT
Operations Review
Queensland Projects
Queensland Project Overview
Key Activities and Achievements
During the year, AR3 actively expanded its presence
in two areas, prospective for ionic clay-hosted rare
earths province in North Queensland. The Company
significantly increased its landholding through the
application of exploration tenure, in the Kennedy
Province, adding 800km2 to the total project area.
Tenure Expansion
AR3 is utilising the substantial experience and
knowledge it has developed through exploration and
evaluation of the Koppamurra rare earths project
in South Australia to create value in prospective
Queensland acreage. energy transition, positioning
the Company in the sustainable development of
critical energy resources.
Exploration Progress
16
AR3 has expanded exploration permits in the
Kennedy Province, encompassing the Forty Mile
Scrub, Sandy Tate, and Oaky Valley prospects. This
strategic move complements the Company’s
existing tenements at Massie Creek and Dalrymple.
A maiden field program at the Dalrymple Project
was completed, with surface and shallow auger
samples collected and assayed.
Dalrymple Uranium Project Area
Kennedy Province
Cairns
Oaky Valley
EPM28902
N
Mareeba
Dimbulah
Gordonvale
Chillagoe
Atherton
Torwood
Massie Creek
EPM27952
Millaa Millaa
Sandy Tate
EPM28901
Innisfail
Ravenshoe
Mount Garnet
AR3
granted tenement
AR3
tenement
Cairns
AR3 application
tenement
Highway
and major
roads
Bowen
Highway and major roads Tully
Towns
QLD
Towns
Kennedy
Province
Kennedy
Province
Carboniferous-Permian
Intrusive Rock
Mount Surprise
40 km
Forty Mile Scrub
EPM28872
Carboniferous Intrusive Rock
Permian Volcanic Rock
Carboniferous Volcanic Rock
Bulgonunna Volcanic Group
40 km
17 | AR3 2024 ANNUAL REPORT
18
84% increase in Resource confirms
Koppamurra as a world-scale ionic
clay-hosted rare earths province.
Highlights
Mineral Resource estimate increases 84% to 186
million tonnes at 712 ppm TREO; Contained TREO 1
tonnage up 60% to 132,000 tonnes;
Koppamurra is now one of the largest ionic
clay-hosted rare earth provinces in Australia with
extensive scope for more growth, positioning it as
a multi-generational supplier to the electric vehicle
and renewable energy markets;
Outstanding scope for ongoing Resource growth
with current Mineral Resource covering only ~2%
of total Koppamurra tenure;
Mineralisation remains open to the north and south;
A ~30,000 m drilling program began in October
2023 to further expand the Mineral Resource; and
Continuing to advance metallurgical testwork
and other development studies in parallel.
Interpretation of the geological samples and assays
using relevant industry standard methods has resulted
in an increase of 84% to 186 Mt of total Mineral Resource
estimate with an average TREO grade of 712 ppm. This
includes 99 Mt in the Measured and Indicated categories.
The interpretation also resulted in a significant increase
to the Exploration Target which now ranges from 340 Mt
to 3.1 Bt, at average grades of 510 ppm to 780 ppm TREO
and is more than double the upper range tonnage of the
previous Exploration Target.
The potential quantity and grade of the Exploration
Target is conceptual in nature, as there has been
insufficient exploration undertaken to estimate
a Mineral Resource and it is uncertain if further
exploration will result in the estimation of a Mineral
Resource.
1 Total Rare Earth Oxide (TREO)
19 | AR3 2024 ANNUAL REPORT
Mineral Resources
Mineral Resource Estimate
Table 1 Koppamurra Mineral Resource Estimate – September 2023
JORC
Magnet Rare Earths
Tonnes TREO
Praseodymium
Neodymium Terbium
Dysprosium
Category
Mt ppm
ppm % TREO
ppm % TREO
ppm % TREO
ppm % TREO
Measured
0.8
747
33
4.4
122
16.4
3.3
0.4
19
2.5
Indicated
98
716
32
4.4
122
17.0
3.3
0.5
18
2.6
Inferred
88
709
32
4.5
121
17.0
3.2
0.4
18
2.5
Total
186
712
32
4.5
121
17.0
3.2
0.5
18
2.5
Table 1 – Koppamurra MRE September 2023 - Rounding may cause differences in the last significant figure.
The updated Mineral Resource incorporates results from the drilling program
conducted between February and June 2023. The overall program added 16,394m
(1,317 holes) to the existing 39,585m (3,966 holes) drilled for the previous Mineral
Resource estimate announced in April 2023.
Interpretation of geological samples and chemical assay
data using relevant industry standard methods resulted
in a significant increase in overall resource tonnes,
contained metal, and continuity of mineralisation.
The updated resource continues to expand with an
increase of 56% to Indicated and 132% increase to
Inferred resource inventories.
Drill spacings to satisfy the Indicated and Measured JORC
Resource Categories are at 120 m and 60 m respectively.
The drilling which informs the Exploration Target is at line
spacings of at least 1 km, and sometimes 2 km apart.
Drill hole spacings along the lines are typically 100m
to 400 m apart.
The updated September 2023 Mineral Resource estimate
is set out in Table 1 above. This Resource has been
reported using a cut-off grade of 325 ppm TREO-CeO2.
20
200
150
Million Tonnes
Interpretation of the geological samples and assays
using relevant industry standard methods has resulted
in an increase of 84% to 186 Mt of total Mineral Resource
estimate with an average TREO grade of 712 ppm. This
includes 99 Mt in the Measured and Indicated categories.
100
50
0
Apr’ 21
Jun’ 22
Mar’ 23
Figure 2
Koppamurra Mineral Resource estimate
A summary of Mineral Resource estimates over time,
demonstrating the progressive increase in resource
Sep’ 23
Exploration Target Estimate
The Exploration Target for the Koppamurra project increased significantly,
informed by an extensive roadverge drilling program focused on testing the
eastern extent of mineralisation within AR3’s Victorian tenure EL’s 7254 and 7719.
The regional road verge drilling combined with additional
drilling proximal to the Koppamurra resource has
resulted in a revised global Exploration Target of 340 Mt
@ 780 ppm TREO to 3.1 Bt @ 510 ppm TREO.
Road verge drilling has continued to be highly effective
in quickly evaluating and defining large Exploration
Targets.
A similar road verge program was completed in Q4 2023
within AR3’s South Australian EL’s 6509 and 6613 to test
the area north of the main resource and south of the
currently defined Exploration Target where very limited
drilling has been completed.
The updated September 2023 Exploration Target estimate
is set out in Table 2 obelow. This Exploration Target has
been reported using a cut-off grade range of 225 ppm
and 425 ppm TREO-CeO2.
Table 2 Koppamurra Exploration Target – September 2023
Exploration
Target
Total
Magnet Rare Earths
Tonnes TREO
Praseodymium
Neodymium Terbium
Dysprosium
Mt ppm
ppm % TREO
ppm % TREO
ppm % TREO
ppm % TREO
340-3,100 510 - 780
20 - 30 3.9-3.8
90 - 140
2.4 - 3.6 0.5-0.5
13 - 20 2.6-2.6
18-18
21 | AR3 2024 ANNUAL REPORT
Mineral Resources
Figure 3
Wider Koppamurra Project Area.
22
Geology and Geological
Interpretation
The ionic clay hosted REE mineralisation at Koppamurra
is hosted by clayey sediments interpreted to have been
deposited onto a limestone base (Gambier Limestone)
and accumulated in an interdunal, lagoonal or estuarine
environment which has been extensively mapped east
of the Kanawinka fault in south-east SA.
A dedicated post-doctoral research program
investigating the source of the REE at Koppamurra is
ongoing, with no definitive source of the REE confirmed
to date although preliminary results of this study have
ruled out the alkali volcanics in south-eastern Australia
which was originally considered as a potential source.
Mineralogical test work conducted on clay samples from
the project area established that the dominant clay
minerals are smectite and kaolin, and that the few REErich minerals detected during the scanning electron
microscope (SEM) investigation were not considered
inconsistent with the suggestion that a significant
proportion of REE are distributed in the material as
adsorbed elements on clay and iron oxide surfaces.
Sampling and Sub-Sampling
Techniques
One metre aircore sample intervals were homogenised
within the cyclone and the rotary splitter was set to an
approximate 20% split producing around 1.5kg sample
for each metre interval.
The 1.5kg sample was collected in a pre-numbered
calico bag and the 80% portion was collected in plastic
UV stabilised bags labelled with hole identity and
interval. The 1.5kg sample collected in the calico bag was
logged by the geologist onsite.
The logged samples were placed in polyweave bags
and sent to Naracoorte base at the end of each day.
The polyweave bags were then placed on pallets and
dispatched to the assay laboratory in Bulka Bags.
Drilling Techniques
Reverse Circulation (RC) aircore drilling methods were
used obtain samples from the drilling programmes. The
RC aircore method uses hollow rods containing an inner
tube which sits inside the hollow outer rod barrel.
The drill cuttings are removed by injection of
compressed air into the hole via the annular area
between the inner tube and the drill rod. The cuttings
are then blown back to surface up the inner tube where
they pass through the sample separating system
(cyclone, with a rotary splitter) and are collected.
Aircore drill rods used were 3m lon