Latest Testwork Affirms Low Capex for Koppamurra
Released
Released
Announcement PDF
8 July 2024
Latest Testwork Affirms Low Capex
Development for Koppamurra
Highlights:
•
Consistent Recoveries Across Varied Conditions: Ongoing heap leach testwork
shows consistent recoveries for Magnet Rare Earths (MRE), ranging from 29% to 74%
across various ore conditions and locations within the Koppamurra Project (the Project)
area.
•
Accelerated Recovery Time: Achieving these consistent results in significantly shorter
periods than traditional heap leaching boosts confidence in employing short-term
heaps near the mine pit, facilitating rapid site rehabilitation.
•
Scalable Commercial Potential: Positive physical and chemical characteristics from a
4-meter column test suggest potential for scaling up heap heights to commercially
viable geometries.
•
Economic Sustainability: The low ratio of gangue/impurities to rare earth content in the
solution supports the heap leach method as a cost-effective and sustainable
development strategy.
•
Click here to watch a short video on this from our MD, Travis Beinke, or ask us any questions.
Australian Rare Earths Limited (ASX: AR3) is pleased to announce significant progress in the
metallurgical testwork for its Koppamurra rare earths project in South Australia. These new
results have boosted confidence in the proposed development pathway involving progressive
heap leaching and rapid rehabilitation.
The completion of four additional heap leach column tests on high-grade mineralised clays from
Koppamurra has demonstrated consistent physical and metallurgical responses across various
ore types, and spatially diverse source locations within the Project area. This validation
strengthens the improved approach for efficient extraction of MRE’s, with short-term heap leach
positioned adjacent to the mine pit.
The Australian Nuclear Science and Technology Organisation (ANSTO), Australia’s leading
laboratory in ionic clay leaching, is assisting AR3 with its ongoing process flowsheet
development.
AR3 Chief Executive Travis Beinke said:
"I am pleased to report an update on the significant progress our team has made in the first half
of this year regarding the metallurgical testwork for the Koppamurra project.
Building on the initial heap leach testwork, the latest results have continued to demonstrate
impressive recoveries of Magnet Rare Earths (MRE), with results ranging from 29% to 74% across
a variety of ore conditions and locations. These consistent results, achieved in significantly
shorter periods compared to traditional heap leaching, provide us with increased confidence in
the viability of using short-term heaps near the mine pit.
We've identified several potential advantages of a progressive heap leach development
approach. These include potentially lower initial capital and operating costs, and improvements
to the project’s environmental credentials, including reduced water and power consumption.
Importantly, this approach is also expected to enhance the clay’s handling characteristics,
consistent with sustainable, rapid, and progressive rehabilitation of the land after mining to return
it to its former use.
The positive physical and chemical characteristics observed in our recent 4-meter column test
indicate strong potential for scaling up to commercial heap geometries. This is a critical
milestone, as it paves the way for the development of economically viable and scalable extraction
processes. Additionally, the low ratio of gangue and impurities to rare earth content in our
solutions further supports the heap leach method as a cost-effective and sustainable approach
for the Koppamurra project.
These results are extremely encouraging as they are unoptimised. Future testwork will focus on
work to further optimise the process and understand the optimal conditions to maximise
recoveries while minimising impurities with the aim to increase the value of the Project.
These achievements are a testament to the dedication and expertise of our team, and they mark
a significant step forward in our journey towards efficient and sustainable rare earth extraction.
We remain committed to advancing our development pathway and unlocking the full potential of
the Koppamurra project."
ANSTO Metallurgical Column Leach Testwork
Metallurgical column leach testwork commenced at ANSTO in December 2023. The Koppamurra
ore material generated from the Bulk Sample Pit operations 1 and from composite ‘variability’
samples responded positively to agglomeration and percolation techniques. Both techniques
could be applied at larger scales in a progressive heap leach application and taken forward as a
development pathway for the environmentally and economically sustainable multi-generational
production of rare earths from the Koppamurra rare earths province.
The material, after column leaching, has shown favorable geochemical and geotechnical
characteristics for the rapid and sustainable progressive rehabilitation techniques planned for
Koppamurra rare earth production. Detailed materials handling and geochemical stability
assessments are being made of the material from these current tests.
1 Refer to ASX release 11 April 2022 “Mining Trial Commences at Koppamurra”
Since the initiation of metallurgical column leach testwork undertaken at ANSTO in December
2023, six distinct Koppamurra ore samples have been tested in ten column heap leach tests. The
samples, sourced from Bulk Sample Pit operations and diverse 'variability' composites across
the Project area, have consistently demonstrated suitability for agglomeration and heap
leaching. This success has been crucial in demonstrating the uniform physical characteristics
and metallurgical recoveries of the Koppamurra ore using the progressive heap leach approach.
Past ore variability testing in slurry leach by AR3 has shown a strong correlation between acid
consumption, gangue dissolution, rare earth recovery, and calcium content. With the current
program, we are progressing to establish a similar correlation for heap leaching, alongside
commencing investigation into the optimal operating conditions. In this initial phase of heap
leach column test work, both the physical characteristics and metallurgical recoveries of the ore
were evaluated over a range of operating conditions, ore characteristics, and spatially diverse
locations within the Project area, as follows:
Operating Conditions:
•
•
•
Acid added in Agglomeration – A low acid addition rate of ~25 kg/t H2SO4 in the ore
agglomeration was applied in Column 3 compared to the average rate of ~44 kg/t H2SO4
applied to the nine other columns.
Irrigation solution pH – A low lixiviant irrigation solution pH of 1.5 was applied to Column
1, compared to a pH 2.2 solution applied to the nine other columns.
Heap Stack Height – Column 10 was stacked to a height of 4 m compared to the 2 m
height of the nine other columns.
Ore Characteristics and Spatial Diversity:
•
•
Columns 1, 2, 3 and 10 utilised ore from the 2023 Bulk Sample Pit operations.
Columns 4, 5, 6, 7, 8 and 9 utilised ‘variability’ composite samples, of varying lithology
and grade, derived from 1 m drill hole intervals. Each column was subjected to the same
operating conditions.
Composite drill hole cuttings masses totaled as follows:
CP3a
CP4a
CP5a
CP6a
CP10a
CP10b
100kg
40kg
70kg
30kg
40kg
20kg
The individual samples making up the Composites, CP’s 3a, 4a, 5a, 6a and 10a/10b are listed in
Appendix II. The CP locations are illustrated in Figure 1 with respect to the Mineral Resource
categories and AR3’s proposed Mine Lease Application boundary.
Figure 1: Composite sample locations for Column leach test work, with Column ID’s C1 through C6 (blue)
Testwork Results
The results from the recently completed columns 3, 7, 8, 9, and 10 have demonstrated consistent
recoveries of MRE, ranging from 29% to 74%, across various ore conditions and spatially diverse
locations within the project area. Additionally, these columns exhibited uniformity in achieving
consistent MRE recoveries in significantly shorter time frames compared to traditional heap
leach operations. The duration of irrigation spanned from as short as 22 days for Column 8, up to
72 days for Column 3 where a low acid addition rate was applied in the ore agglomeration stage.
This enhances confidence in using heap leach to facilitate rapid MRE recovery and rehabilitation
of the utilised land.
The heap leach Pregnant Liquor Solution (PLS) has consistently shown low gangue/impurity
profiles compared to slurry leach operations. This suggests the potential for more economically
sustainable downstream processing conditions to produce a rare earth product.
Figure 2: Rare earth recoveries for Columns 3, 7, 8, 9 and 10, showing gangue dissolution characteristics (Al / Fe / Si) with
respect to ore variability at constant pH. Notable here is the decreased extraction for C7 ore which had greater calcium
concentration, aiding in understanding the target ore characteristics for mining
A notable achievement from the recent additional tests was the heap leach column test
conducted at a lift height of 4 m, which resulted in positive physical and chemical performance
akin to columns 1, 2 and 3 which utilised the same ore sample material. As illustrated in Table 1,
the bulk density and porosity of the leached ore, prior to washing, is very similar for the 4 m
column (Column 10) compared to the average of the four 2 m columns (columns 3, 7, 8 and 9).
This indicated that despite the added height the ore had not compacted during the irrigation
period. This success has provided an early indication of the feasibility of increasing the heap
height to potential commercial geometries, which could result in reduced heap footprint and
capital costs.
Table 1: Basic hydrodynamic data for columns 3, 7, 8, 9, 10 on last day of draining after lixiviant irrigation.
A key insight from the continued operation of Column 3 (previously reported as at day 32 2) is the
impact of applying a low acid addition rate during the ore agglomeration phase on the gangue
profile of the PLS. Column 3 received approximately half the acid during agglomeration compared
to both Column 1 and Column 2, all of which utilised the same feed ore sample material. Column
3 was subsequently irrigated with a pH 2.2 lixiviant solution until day 40, at which point the
lixiviant pH was decreased to 1.0. As a result, the ratio of aluminum dissolution to rare earths was
significantly lower compared to both Column 1 and Column 2. Additionally, the ratio of iron
dissolution to rare earths was lower in Column 3 compared to Column 1, and similar to Column
2. Despite this low acid addition rate in agglomeration and lower gangue dissolution, Column 3
still impressively achieved approximately 4% greater MRE recoveries than both Column 1 and
Column 2. This was achieved while applying a lower total acid addition than Column 1 and a
similar total acid addition to Column 2.
Figure 3: ANSTO Facilities, Column C10 at 4m height, and displaying positive agglomeration and ‘heaping’ characteristics
These additional tests have also enabled the collection of substantial volumes of liquors
extracted from the columns for evaluating membrane filtration technology. The membrane
filtration evaluation aims to capture and treat both leach reagents and water for reuse in the heap
leach process. This has the potential to offer significant operating cost savings and capital cost
savings by reducing the volumes of downstream processing. Importantly, this also has the
potential to reduce water and reagent use. The significant volumes of liquor obtained through the
heap leach testwork will also facilitate impurity removal tests and the preparation of additional
mixed rare earth carbonate (MREC) for customer assessment.
AR3 continues to work closely with NEO Performance Materials Inc. (“Neo”), a world-leader in
the production of rare earth permanent magnets and other rare earth products and whom with
AR3 has a non-binding Memorandum of Understanding that provides for an offtake agreement for
initial production of a MREC from Koppamurra. Importantly, Neo operates several rare earth
production facilities around the world, and is one of the few western separation plants that
2 Refer to ASX release 2 April 2024 “Flowsheet Update for Koppamurra”
source MREC from third-party producers. Neo’s experience in providing input to MREC supply
continues to be invaluable to AR3.
The material, after column heap leach, has shown favourable geochemical and geotechnical
characteristics for the environmentally sustainable, rapid, progressive rehabilitation techniques
planned for Koppamurra rare earth production. Various heap washing regimes were trialed across
columns C7 through C9, with washing currently continuing on C10. The trialed washing regimes
provided positive first pass results for understanding wash impact on neutrality and remaining
free acid. Detailed heap leach washing, materials handling and geochemical stability
assessments are planned for subsequent tests to ensure an environmentally sustainable
operation at Koppamurra can be achieved.
Table 2: Column Leach Summary
(1) Methylene Blue Surface Area - assuming all smectite dominating methylene blue surface area is in the <45 micron fraction [m2/g < 45
micron basis]
Next Steps
Water Treatment/Recycling
Water treatment processes applied to the leach solutions and for the recycle of water and
reagents is being assessed at desktop level and will ultimately be tested through the application
of reverse osmosis, nano filtration and ultra filtration in a comprehensive test work program to
evaluate and select a process for the economic recovery of rare earth elements from the clay
hosted deposit at Koppamurra.
Impurity Removal
Following the leaching program, impurity removal optimisations will be performed to improve the
rejection of deleterious elements such as aluminium, iron, silica, whilst maximising the recovery
of the rare earths. The testwork will aim to evaluate impurity removal conditions including pH,
alkali type, temperature, and residence time.
Previous successful impurity removal testwork undertaken by AR3 will now be applied to the
much higher-grade rare earths in solution derived from the column leaches which also have lower
impurity to REE in solution ratios. Impurity removal steps in the production of marketable mixed
rare earth concentrates are further enhanced by lower gangue/REE ratios and can generate lower
REE loses through that process.
Rare Earth Precipitation
Following the impurity removal program, rare earth precipitation tests will be performed to
generate a saleable rare earth product. The testwork will evaluate the type of precipitation agent,
pH, temperature, residence time, % solids and solid liquid separation performance.
Progressive heap leach, high grade rare earths pathway
Additional drilling, assay results 3 and resources modelling undertaken at Koppamurra have
allowed for the identification of a high-grade rare earth subset of the broader Koppamurra
resources. These high-grade ore zones, and the application of temporary heap leaching
production pathways, will allow for scalable, efficient production of rare earths with staged
satellite developments enhancing the favorable environmental outcomes from a development of
this type.
A conceptual project process flowsheet is provided at Figure 4. Some of the design features and
resulting advantages for the Koppamurra project with a progressive heap leach pathway
compared to a slurry leach are as follows:
Design Features:
•
•
•
High-grade satellite mine sites with temporary heap pads located at the edge of the
satellite mine void;
Top soil and overburden material temporarily set aside ready to be placed back in the
mine void after rare earths have been harvested from the clay and the clay has been
washed allowing for rapid and progressive rehabilitation of the land;
Water treatment equipment located proximate to the temporary heap pads to facilitate
recycling and reuse of water and reagents.
Design advantages include:
•
•
•
•
Potential for a significantly lower capital cost and reduced operating cost project;
Opportunity to easily expand and scale up production over time across the multigenerational province;
Enables improved environmentally sustainable characteristics with;
o Very low water consumption
o Reduced power consumption
o Materials handling characteristics enabling environmentally sustainable, rapid,
progressive rehabilitation techniques
Testwork also indicates lower gangue/impurity profile with higher rare earth in solution
characteristics through column leach resulting in lower capital and operating cost.
3 Refer to ASX release 30 January 2024 “Additional high grade, shallow mineralisation at Koppamurra” and ASX release 26
February 2024 “High-Grade mineralisation discovered North of Koppamurra MRE”
Figure 4: Koppamurra conceptual project flow sheet
The announcement has been authorised for release by the Board of Australian Rare Earths Limited.
For further information please contact:
Australian Rare Earths Limited
Travis Beinke
Managing Director
T: 1 300 646 100
Media Enquiries
Jessica Fertig
Tau Media
E: jessica@taumedia.com.au
Engage and Contribute at the AR3 investor hub: https://investorhub.ar3.com.au/
Competent Person’s Statement
The information in this report that relates to metallurgical results is based on information compiled by
Australian Rare Earths Limited and reviewed by Mr Jon Weir who is the Technical Director of Wallbridge
Gilbert Aztec and a member of the Australian Institute of Mining and Metallurgy (AusIMM). Mr. Weir has
sufficient experience that is relevant to the metallurgical testing which was undertaken to qualify as a
Competent Person as defined in the 2012 edition of the “Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves”. Mr Weir consents to the inclusion in this report of the
matters based on this information in the form and context in which it appears.
The information in this report that relates to Exploration results is based on information compiled by
Australian Rare Earths Limited and reviewed by Mr Rick Pobjoy who is the Chief Technical Officer of
the Company and a member of the Australian Institute of Mining and Metallurgy (AusIMM). Mr Pobjoy
has sufficient experience that is relevant to the style of mineralisation, the type of deposit under
consideration and to the activities undertaken to qualify as a Competent person as defined in the 2012
edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves”. Mr Pobjoy consents to the inclusion in this report of the matters based on this information
in the form and context in which it appears.
About Australian Rare Earths Limited
Australian Rare Earths is committed to the timely exploration and development of its 100% owned,
flagship Koppamurra Project, located in the new Koppamurra rare earths Province in southeastern South
Australia and western Victoria. Koppamurra is a prospective ionic clay hosted rare earth deposit,
uniquely rich in all the elements required in the manufacture of rare earth permanent magnets which are
essential components in electric vehicles, wind turbines and domestic appliances. In addition, AR3 is
actively reviewing other potential prospective areas which may also host uranium and ionic clay hosted
rare earth deposits throughout Australia.
The Company is focused on executing a growth strategy that will ensure AR3 is positioned to become
an independent and sustainable source of energy transition metals, playing a pivotal role in the global
transition to a green economy.
https://investorhub.ar3.com.au/link/aP3kwP
APPENDIX I – JORC TABLE 1 & 2
JORC Table 1 – Section 1
Criteria
Sampling
techniques
Section 1 Sampling Techniques and Data
Explanation
Comment
Nature and quality of
RC Aircore drilling methods were used obtain
sampling (e.g., cut channels,
samples from the October-December 2021,
random chips, or specific
February-April 2022, September-December 2022
specialised industry standard February- June 2023, and October-December 2023
measurement tools
drilling programs.
appropriate to the minerals
under investigation, such as
The following information covers the sampling process:
down hole gamma sondes, or
• All air core samples were collected from the
handheld XRF instruments,
rotary splitter mounted at the bottom of the
etc). These examples should
cyclone using a pre-numbered calico bag and
not be taken as limiting the
plastic UV sample bag. The samples were
broad meaning of sampling.
geologically logged at 1 m intervals using the
Include reference to
marked calico sample which averaged ~1.5
measures taken to ensure
kg in mass.
sample representivity and
• A handheld Olympus Vanta XFR Analyser was
the appropriate calibration
used to assess the geochemistry of the air
of any measurement tools or
core samples in the field. The XRF analysis
systems used. Aspects of the
provided a full suite of mineral elements for
determination of
characterising the lithological units.
mineralisation that are
• XRF readings were downloaded from the XRF
Material to the Public
Report. In cases where
Analyser at the end of each day and uploaded
‘industry standard’ work has
to the Australian Rare Earths Azure Data
been done this would be
Studio database.
relatively simple (e.g.,
• Field duplicates were taken at a rate of
‘reverse circulation drilling was
• ~1:34 and inserted blindly into the sample
used to obtain 1 m samples
batches.
from which 3 kg was pulverised
to produce a 30 g charge for fire • At the laboratory, the samples were oven
dried at 105 degrees for a minimum of 24
assay’). In other cases, more
hours and secondary crushed to 3 mm
explanation may be required,
fraction and then pulverised to 90% passing
such as where there is coarse
75 µm. Excess residue was maintained for
gold that has inherent sampling
storage while the rest of the sample placed in
problems. Unusual commodities
8x4 packets and sent to the central weighing
or mineralisation types (e.g.,
laboratory. The samples were submitted for
submarine nodules) may
warrant disclosure
analysis using XRF-ICP-MS method.
of detailed information.
• A laboratory repeat was taken at ~ 1 in 21
samples;
• Commercially obtained standards were
inserted by the laboratory at a rate of ~ 1 in 9
into the sample sequence.
Mechanical excavation techniques were applied
to the recovery of samples from the area of AR3’s
Trial Pit. Trial Pit samples were taken from a
number of discrete locations within the pit,
nominally 1m wide x 1m long x 0.5m deep.
Material from these locations were loaded into a
dump truck by an excavator and taken to a
laydown site for assessment.
APPENDIX I – JORC TABLE 1 & 2
Criteria
Section 1 Sampling Techniques and Data
Explanation
Comment
Up to 5 x dump truck piles of material from each
discrete location were dumped on the laydown.
Up to 12 x bulka bags were filled from those (up
to) 5 x piles of material and each was provided
a unique Bulka Bag # which referenced a Location
and sample pile number. Eg C2L1aP3 (C2 - cut
bench 2, L1a – location 1a, P3 – pile 3).
Samples provided for column leach testwork were
sourced from Trial Pit Locations;
C2L1aP3, Bulka Bag #146
C2L3P2, Bulka Bag #121
C4L4P5, Bulka Bag #410
C4L4P2, Bulka Bag #345
Samples were collected from the Bulka bags and
placed into 20 litre buckets for transfer to ANSTO
for testwork.
APPENDIX I – JORC TABLE 1 & 2
Criteria
Drilling
techniques
Explanation
Drill type (e.g., core, reverse
circulation, open- hole
hammer, rotary air blast,
auger, Bangka, sonic, etc) and
details (e.g., core diameter,
triple or standard tube, depth
of diamond tails, facesampling bit, or other type,
whether core is oriented and if
so, by what method, etc).
Comment
• Drilling was completed using a Mcleod or
Wallis air ore drill rig (Landcruiser 6x6 or
similar) for the drilling.
• Aircore drilling is a form of reverse circulation
drilling where the sample is collected at the face
and returned inside the inner tube. The drill
cuttings are removed by injection of compressed
air into the hole via the annular area between
the inner tube and the drill rod.
• Aircore drill rods used were 3 m long.
• NQ diameter (76 mm) drill bits and rods
were used.
• All aircore drill holes were vertical with
depths varying between 2 m and 36 m.
Drill
sample
recovery
Method of recording and
•
assessing core and chip sample
recoveries and results assessed.
Measures taken to maximise
sample recovery and ensure
representative nature of the
samples.
•
Whether a relationship exists
between sample recovery and
grade and whether sample bias
may have occurred due to
preferential loss/gain of
fine/coarse material.
•
•
•
•
•
Drill sample recovery for aircore is monitored
by recording sample condition descriptions
where ‘Poor’ to ‘Very Poor’ were used to
identify any samples recovered which were
potentially not representative of the interval
drilled.
A comment was included where water
injection was required to recover the sample
from a particular interval. The use of water
injection can potentially bias a sample and
very little water injection was required during
this drilling program.
No significant loses of samples were observed
due to the shallow drilling depths (<36 m).
The rotary splitter was set to an approximate
20% split, which produced approximately 1.5
kg sample for each meter interval.
The 1.5 kg sample was collected in a prenumbered calico bags and the remaining 80%
(5 kg to 8 kg) was collected in plastic UV bags
labelled with the hole number and sample
interval.
At the end of each drill rod, the drill string is
cleaned by blowing down with air to remove
any clay and silt potentially built
up in the sample pipes and cyclone.
No relationship exists between sample
recovery and grade.
APPENDIX I – JORC TABLE 1 & 2
Criteria
Logging
Explanation
Comment
Whether core and chip
• All aircore samples collected in calico bags
samples have been
were logged for lithology, colour, cement
geologically and
type, hardness, percentage rock estimate,
geotechnically logged to a
sorting, and any relevant comments such as
level of detail to support
moisture, sample condition, or vegetation.
appropriate Mineral Resource
• Geological logging data for all drill holes was
estimation, mining studies
qualitatively logged onto Microsoft Excel
and metallurgical studies.
spreadsheet using a Panasonic Toughbook
Whether logging is qualitative
with validation rules built into the
or quantitative in nature. Core
spreadsheet including specific drop- down
(or costean, channel, etc)
menus for each variable. The data was
photography.
uploaded to the Australian Rare Earths Azure
The total length and percentage
Data Studio database.
of the relevant intersections
logged.
• Every drill hole was logged in full and logging
was undertaken with reference to a drilling
template with codes prescribed and guidance
to ensure consistent and systematic data
collection.
Subsampling
techniques
and sample
preparation
If core, whether cut or sawn
and whether quarter, half or
all cores taken.
If non-core, whether riffled,
tube sampled, rotary split,
etc and whether sampled
wet or dry.
For all sample types, the nature,
quality, and appropriateness of
the sample preparation
technique.
Quality control procedures
adopted for all sub-sampling
stages to maximise
representivity of samples.
Measures taken to ensure that
the sampling is representative
of the in- situ material
collected, including for
instance results for field
duplicate/second-half sampling.
Whether sample sizes are
appropriate to the grain size of
the material being sampled.
• 1 m aircore sample interval were
homogenised within the cyclone and the
rotary splitter was set to an approximate
20% split producing around 1.5 kg sample for
each metre interval.
• The 1.5 kg sample was collected in a prenumbered calico bag and the 80% (5 kg to 8
kg) portion was collected in plastic UV bags
labelled with hole identity and interval.
• Duplicates were generally taken within the clay
lithologies above the basement as this is the
likely zone of REE enrichment. These duplicate
samples were normally collected by using a
second calico bag and placing it under the rotary
splitter collecting a 20% split but due to the
difficulties of placing a second calico bag under
the rotary splitter during sample collection,
some duplicates were collected by hand from the
plastic UV bags which captured the other 80% of
the material recovered from any particular
interval.
• The material in the plastic UV bags was mixed
up and every attempt to take as representative
sample of the material as possible by hand was
made and then placed in a pre-numbered calico
bag.
• The 1.5 kg sample collected in the calico bag
was logged by the geologist onsite. The logged
samples were placed in polyweave bags and
sent to Naracoorte base at the end of each day.
The polyweave bags were then placed on
pallets and dispatched to Bureau Veritas
laboratory in Adelaide in Bulka Bags.
APPENDIX I – JORC TABLE 1 & 2
Criteria
Explanation
Comment
• The remaining 80% split from the aircore
interval was stored for future reference.
• Field duplicates of all the samples were
completed at a frequency of ~1 in 34 samples.
Field standards were inserted into the sample
sequence at a frequency of
~1:57. Standard reference Material (SRM)
samples were inserted into the sample batches
at a frequency rate of 1 per 10 samples by the
laboratory and a repeat sample was taken at a
rate of 1 per 21 samples.
• A rig geologist oversaw the sampling and
logging process while a second geologist
selected samples for analysis based on the
logging descriptions and pXRF analysis. Clay
rich sample and those adjacent to the
limestone basement contact were selected for
assay. REEs are known to be contained within
the clay component of the sediment package
based on analysis of XRF data
Share your feedback
Discover