84% increase in Resource for Koppamurra REE Project
Released
Released
Announcement PDF
19 September 2023
Koppamurra Rare Earths Project, South Australia-Victoria
84% increase in Resource confirms Koppamurra as a worldscale ionic clay-hosted rare earths Province
Highlights
•
Mineral Resource estimate increases 84% to 186 million tonnes at 712 ppm TREO 1;
Contained TREO tonnage up 60% to 132,000 tonnes
•
Koppamurra is now one of the largest ionic clay-hosted rare earth provinces in
Australia with extensive scope for more growth, positioning it as a multigenerational supplier to the electric vehicle and renewable energy markets
•
Outstanding scope for ongoing Resource growth with current Mineral Resource
covering only ~2% of total Koppamurra tenure 2
•
Mineralisation remains open to the north and south
•
A ~30,000 m drilling program is set to start in October 2023 to further expand the
Mineral Resource
•
Continuing to advance metallurgical testwork and other development studies in
parallel
Australian Rare Earths (ASX: AR3) is pleased to announce an 84 per cent increase in the Mineral Resource
estimate at its Koppamurra project in South Australia.
Interpretation of the geological samples and assays using relevant industry standard methods has resulted
in an increase of 84% to 186 Mt of total Mineral Resource estimate with an average TREO grade of 712 ppm.
This includes 99 Mt in the Measured and Indicated categories.
The interpretation also resulted in a significant increase to the Exploration Target which now ranges from
340 Mt to 3.1 Bt, at average grades of 510 ppm to 780 ppm TREO and is more than double the upper range
tonnage of the previous Exploration Target. The potential quantity and grade of the Exploration Target is
conceptual in nature, as there has been insufficient exploration undertaken to estimate a Mineral Resource
and it is uncertain if further exploration will result in the estimation of a Mineral Resource.
AR3 Chief Executive Travis Beinke said: “With each drilling campaign we have progressively built our
confidence in our ability to demonstrate the establishment of a world-scale ionic clay-hosted rare earths
1
2
Total Rare Earth Oxide (TREO)
Total Koppamurra tenure includes tenements already granted and those currently under application
Province in the heart of a tier-one location.
“These outstanding results represent a substantial increase to the resource and confirms Koppamurra as a
new world-scale ionic clay-hosted rare earths Province. In addition, significant upside remains with an
updated Exploration Target range of 340Mt to 3.1 Bt and the resource remaining open to the north and
south.
“With our growing understanding of the geology and rare earth mineralisation process’ at Koppamurra we
remain confident in the consistency of the mineralisation across the project area and are eager to return to
drilling next month to drill test areas with no historical drilling.
“We intend to continue creating value for shareholders by growing and upgrading the inventory while
advancing our metallurgical testwork and other development studies in parallel.
“Koppamurra is located in a tier-1 jurisdiction and contains both light and the strategically important heavy
rare earths required for high-strength permanent magnets. We have demonstrated that rapid and
progressive rehabilitation can be achieved through our trial mining pit. All of these factors distinguish
Koppamurra as a unique opportunity to establish a new sustainable source of critical heavy rare earths for a
clean energy future.”
IHC Mining Commercial and Business Development Manager Greg Jones said: “The latest Mineral Resource
estimate has incorporated considerable improvements and controls to the directional analysis of the
mineralised geological package, as well as incorporating element specific variography analysis. This has
resulted in a kriged estimate that honours the grade profile and distribution within an undulating geological
package.
“IHC Mining consider this to be a significant improvement over the previously used inverse distance
weighting grade interpolation and an additional improvement to the overall JORC classification confidence.”
Mineral Resource Estimate
The updated Mineral Resource incorporates results from the drilling program conducted between February
and June 2023. The overall program added 16,394 m (1,317 holes) to the existing 39,585 m (3,966 holes)
drilled for the previous Mineral Resource estimate announced in April 2023.
Interpretation of the geological samples and assays using relevant industry standard methods has resulted
in an increase of 84% to 186 Mt of total Mineral Resource estimate with an average TREO grade of 712 ppm.
This includes 99 Mt in the Measured and Indicated categories.
Interpretation of geological samples and chemical assay data using relevant industry standard methods
resulted in a significant increase in overall resource tonnes, contained metal, and continuity of
mineralisation. The updated resource continues to expand with an increase of 56% to Indicated and 132%
increase to Inferred resource inventories.
Figure 1 Resource Definition Drilling
Drill spacings to satisfy the Indicated and Measured JORC Resource Categories are at 120 m and 60 m
respectively. The drilling which informs the Exploration Target is at line spacings of at least 1 km, and
sometimes 2 km apart. Drill hole spacings along the lines are typically 100 m to 400 m apart.
The updated September 2023 Mineral Resource estimate is set out in Table 1 below. This Resource has
been reported using a cut-off grade of 325 ppm TREO-CeO2.
Table 1 – Koppamurra MRE September 2023 - Rounding may cause differences in the last significant figure.
Koppamurra Mineral Resource Estimate – September 2023
Magnet Rare Earths
JORC
Tonnes
TREO
Pr6O11
Nd2O3
Tb4O7
Dy2O3
Category
Mt
ppm
ppm
% TREO
ppm
% TREO
ppm
% TREO
ppm
% TREO
Measured
0.8
747
33
4.4
122
16.4
3.3
0.4
19
2.5
Indicated
98
716
32
4.4
122
17.0
3.3
0.5
18
2.6
Inferred
88
709
32
4.5
121
17.0
3.2
0.4
18
2.5
Total
186
712
32
4.5
121
17.0
3.2
0.5
18
2.5
A summary of Mineral Resource estimates over time, demonstrating the progressive increase in resource is
provided in Figure 2 below.
Figure 2 Koppamurra Mineral Resource estimate
Exploration Target Estimate
The Exploration Target for the Koppamurra project increased significantly, informed by an extensive road
verge drilling program focused on testing the eastern extent of mineralisation within AR3’s Victorian
tenure EL’s 7254 and 7719. The regional road verge drilling combined with additional drilling proximal to
the Koppamurra resource has resulted in a revised global Exploration Target of 340 Mt @ 780 ppm TREO
to 3.1 Bt @ 510 ppm TREO.
Road verge drilling has continued to be highly effective in quickly evaluating and defining large Exploration
Targets. A similar road verge program is planned in Q4 of this year within AR3’s South Australian EL’s
6509 and 6613 to test the area north of the main resource and south of the currently defined Exploration
Target where very limited drilling has been completed (Figure 6).
The planned road verge drilling in South Australia will assist in identifying prospective areas which will guide
land access agreements with landholders for an accelerated campaign of follow up drilling over sections of the
Exploration Target in early 2024. Negotiations for further access agreements are already underway and
ongoing.
The updated September 2023 Exploration Target estimate is set out in Table 2 below. This Exploration
Target has been reported using a cut-off grade range of 225 ppm and 425 ppm TREO-CeO2.
Table 2– Koppamurra Exploration Target September 2023
Koppamurra Exploration Target – September 2023
Exploration
Tonnes
TREO
Target
Mt
ppm
Total
340-3,100
510 - 780
Pr6O11
%
ppm
TREO
20 - 30
3.9-3.8
Nd2O3
Magnet Rare Earths
Tb4O7
Dy2O3
ppm
% TREO
ppm
% TREO
ppm
% TREO
90 - 140
18-18
2.4 - 3.6
0.5-0.5
13 - 20
2.6-2.6
Figure 3– Koppamurra JORC Mineral Resource categories
Figure 4- Section (N5883920) through Dovetail deposit illustrating shallow rare earth mineralisation.
Figure 5- Section (N5883417) through Dovetail deposit illustrating shallow rare earth mineralisation.
Figure 6 – Wider Koppamurra project area. Area north of the main resource (circle) to be drill tested
from October 2023
Information provided pursuant to ASX Listing Rule 5.8.1
Geology and Geological Interpretation
The ionic clay hosted REE mineralisation at Koppamurra is hosted by clayey sediments interpreted to have
been deposited onto a limestone base (Gambier Limestone) and accumulated in an interdunal, lagoonal or
estuarine environment which has been extensively mapped east of the Kanawinka fault in south-east SA. A
dedicated post-doctoral research program investigating the source of the REE at Koppamurra is ongoing,
with no definitive source of the REE confirmed to date although preliminary results of this study have ruled
out the alkali volcanics in south-eastern Australia which was originally considered as a potential source.
Mineralogical test work conducted on clay samples from the project area established that the dominant clay
minerals are smectite and kaolin, and that the few REE-rich minerals detected during the scanning electron
microscope (SEM) investigation were not considered inconsistent with the suggestion that a significant
proportion of REE are distributed in the material as adsorbed elements on clay and iron oxide surfaces.
Sampling and sub-sampling techniques
One metre aircore sample intervals were homogenised within the cyclone and the rotary splitter was set to
an approximate 20% split producing around 1.5kg sample for each metre interval. The 1.5kg sample was
collected in a pre-numbered calico bag and the 80% portion was collected in plastic UV stabilised bags
labelled with hole identity and interval. The 1.5kg sample collected in the calico bag was logged by the
geologist onsite. The logged samples were placed in polyweave bags and sent to Naracoorte base at the end
of each day. The polyweave bags were then placed on pallets and dispatched to the assay laboratory in
Bulka Bags.
Drilling techniques
RC aircore drilling methods were used obtain samples from the drilling programmes. The RC aircore method
uses hollow rods containing an inner tube which sits inside the hollow outer rod barrel. The drill cuttings
are removed by injection of compressed air into the hole via the annular area between the inner tube and
the drill rod. The cuttings are then blown back to surface up the inner tube where they pass through the
sample separating system (cyclone, with a rotary splitter) and are collected.
• Aircore drill rods used were 3 m long.
• NQ diameter (76 mm) drill bits and rods were used.
• All Aircore drill holes were vertical with depths varying between 2 m and 36 m
Sample analysis method
The 1.5kg aircore samples were assayed by Bureau Veritas laboratory in Wingfield, Adelaide, South Australia,
which is considered the Primary laboratory. The samples were initially oven dried at 105 degrees Celsius for
24 hours. Samples were secondary crushed to 3 mm fraction, and the weight recorded. The sample was then
pulverised to 90% passing 75μm. Excess residue was maintained for storage while the rest of the sample
placed in 8x4 packets and sent to the central weighing laboratory. All weighed samples were then analysed
using the Multiple Elements Fusion/Mixed Acid Digest analytical method; ICP Scan (Mixed Acid Digest –
Lithium Borate Fusion) Samples are digested using a mixed acid digest and also fused with Lithium Borate to
ensure all elements are brought into solution. The digests are then analysed for the following elements
(detection Limits shown): Al (100) As (1) Ba (1) Be (0.5) Ca(100) Ce (0.1) Co (1) Cr (10) Dy (0.05) Er (0.05)
Eu(0.05) Fe(100) Gd (0.2) Ho (0.02) K (100) La (0.5) Lu (0.02) Mg (100) Mn (2) Na (100) Nd (0.05) Ni (2) Pr
(0.2) S (50) Sc (1) Si (100) Sm(0.05) Sr (0.5) Th (0.1) Ti (50) Tm (0.2) U (0.1) V (5) Y (0.1) Yb (0.05) Zr (1)
Estimation methodology
The JORC Mineral Resource Classification for the Koppamurra project deposit was supported by drill hole
spacing, geological continuity and variography of TREO, TREO-CeO2 and CREO of the target mineralised
domain Zone 3.
The classification of Measured, Indicated and Inferred Mineral Resources was supported by all the criteria
noted above. A significant Exploration Target has also been defined which can be used to determine areas
of significant prospectivity for future drill programmes.
As a Competent Person, IHC Mining Geological Services Manager Greg Jones considers that the results of
the Mineral Resource estimate appropriately reflects a reasonable view of the deposit categorisation and
reasonable prospects of eventual economic extraction (RPEEE).
Cut-off grades, including basis for the selected Cut-off Grade
The selection of the TREO-CeO2 cut-off grade used for reporting was based on the experience of the
Competent Person and given the early stage of the Koppamurra project, this cut-off grade was selected
based on a peer review of publicly available information from more advanced projects with comparable
mineralisation styles (i.e., clay-hosted rare earth mineralisation) and comparable conceptual processing
methods. Material above this cut-off generates a head feed grade of over 700 ppm, and in the opinion of
the Competent Person meets the conditions for reporting of a Mineral Resource with reasonable prospects
of eventual economic extraction.
Mining and metallurgical methods / material modifying factors
No specific mining or metallurgical methods or parameters were incorporated into the modelling process.
Representative material from the current drilling programme will be utilised in ongoing metallurgical
testwork.
The announcement has been authorised for release by the Board of AR3 Limited.
For further information please contact:
AR3 Limited
Travis Beinke
Chief Executive Officer
T: 1 300 646 100
Media Enquiries
Nicholas Read / Paul Armstrong
Read Corporate
T: 08 9388 1474
Competent Person’s Statement
The information in this report which relates to the Mineral Resources and Exploration Targets for the
Koppamurra rare earth deposit is based upon and fairly represents information compiled by Mr. Greg Jones
who is a Fellow of the Australasian Institute of Mining and Metallurgy. Mr. Jones is a full-time employee of
IHC Mining and has sufficient experience relevant to the style of mineralisation, the type of deposit under
consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the
2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves”. Mr. Jones consents to the inclusion in this report of the matters based on his information in the
form and context in which it appears.
Forward Looking Statement
This announcement contains forward-looking statements which involve a number of risks and uncertainties.
These forward-looking statements are expressed in good faith and believed to have a reasonable basis. These
statements reflect current expectations, intentions or strategies regarding the future and assumptions based
on currently available information. Should one or more of the risks or uncertainties materialise, or should
underlying assumptions prove incorrect, actual results may vary from the expectations, intentions and
strategies described in this announcement. No obligation is assumed to update forward looking statements
if these beliefs, opinions, and estimates should change or to reflect other future developments.
About Australian Rare Earths Limited
Australian Rare Earths is committed to the timely exploration and development of its 100% owned, flagship
Koppamurra Project, located in the new Koppamurra rare earths Province in southeastern South Australia
and western Victoria. Koppamurra is a prospective ionic clay hosted rare earth deposit, uniquely rich in all
the elements required in the manufacture of rare earth permanent magnets which are essential components
in electric vehicles, wind turbines and domestic appliances. In addition AR3 is actively reviewing other
potential prospective areas which may also host ionic clay hosted rare earth deposits throughout Australia.
The Company is focused on executing a growth strategy that will ensure AR3 is positioned to become an
independent and sustainable source of rare earths, playing a pivotal role in the global transition to a green
economy.
JORC Table 1
Criteria
Sampling
techniques
Section 1 Sampling Techniques and Data
Explanation
Comment
Nature and quality of
RC Aircore drilling methods were used obtain
sampling (e.g., cut
samples from the October-December 2021,
channels, random chips, or February-April 2022, September-December 2022
specific specialised
& February- June 2023 drilling programs.
industry standard
The following information covers the sampling
measurement tools
process:
appropriate to the
• All air core samples were collected from the
minerals under
rotary splitter mounted at the bottom of the
investigation, such as
cyclone using a pre-numbered calico bag and
down hole gamma sondes,
plastic UV sample bag. The samples were
or handheld XRF
geologically logged at 1 m intervals using the
instruments, etc). These
marked calico sample which averaged ~1.5 kg
examples should not be
in mass.
taken as limiting the broad
• A handheld Olympus Vanta XFR Analyser
meaning of sampling.
was used to assess the geochemistry of the
Include reference to
air core samples in the field. The XRF
measures taken to
analysis provided a full suite of mineral
ensure sample
elements for characterising the lithological
representivity and the
units.
appropriate calibration
• XRF readings were downloaded from the
of any measurement
XRF Analyser at the end of each day and
tools or systems used.
uploaded to the Australian Rare Earths
Aspects of the
Azure Data Studio database.
determination of
mineralisation that are
• Field duplicates were taken at a rate of
Material to the Public
1:34 and inserted blindly into the sample
Report. In cases where
batches.
‘industry standard’ work
• At the laboratory, the samples were oven
has been done this would
dried at 105 degrees for a minimum of 24
be relatively simple (e.g.,
hours and secondary crushed to 3 mm
‘reverse circulation drilling
fraction and then pulverised to 90% passing
was used to obtain 1 m
75 µm. Excess residue was maintained for
samples from which 3 kg
storage while the rest of the sample placed
was pulverised to produce
in 8x4 packets and sent to the central
a 30 g charge for fire
weighing laboratory. The samples were
assay’). In other cases,
submitted for analysis using XRF-ICP-MS
more explanation may be
method.
required, such as where
there is coarse gold that
• A laboratory repeat was taken at ~ 1 in 21
has inherent sampling
samples;
problems. Unusual
• Commercially obtained standards were
commodities or
inserted by the laboratory at a rate of ~ 1
mineralisation types (e.g.,
submarine nodules) may
warrant disclosure
of detailed information.
Drilling
techniques
Drill type (e.g., core,
reverse circulation, openhole hammer, rotary air
blast, auger, Bangka,
sonic, etc) and details
(e.g., core diameter, triple
or standard tube, depth of
diamond tails, facesampling bit, or other
type, whether core is
oriented and if so, by what
method, etc).
in 9 into the sample sequence.
•
•
•
•
•
Drill sample
recovery
Method of recording and
assessing core and chip
sample recoveries and
results assessed.
Measures taken to
maximise sample recovery
and ensure representative
nature of the samples.
Whether a relationship
exists between sample
recovery and grade and
whether sample bias may
have occurred due to
preferential loss/gain of
fine/coarse material.
•
•
•
•
•
•
McLeod Drilling used a Toyota Land air core
rig and support vehicle for the aircore
drilling.
Aircore drilling is a form of reverse
circulation drilling where the sample is
collected at the face and returned inside the
inner tube. The drill cuttings are removed by
injection of compressed air into the hole via
the annular area between the inner tube
and the drill rod.
Aircore drill rods used were 3 m long.
NQ diameter (76 mm) drill bits and rods
were used.
All aircore drill holes were vertical with
depths varying between 2 m and 36 m.
Drill sample recovery for aircore is
monitored by recording sample condition
descriptions where ‘Poor’ to ‘Very Poor’
were used to identify any samples
recovered which were potentially not
representative of the interval drilled.
A comment was included where water
injection was required to recover the
sample from a particular interval. The use
of water injection can potentially bias a
sample and very little water injection was
required during this drilling program.
No significant loses of samples were
observed due to the shallow drilling depths
(<36 m).
The rotary splitter was set to an
approximate 20% split, which produced
approximately 1.5 kg sample for each
meter interval.
The 1.5 kg sample was collected in a prenumbered calico bags and the remaining
80% (5 kg to 8 kg) was collected in plastic
UV bags labelled with the hole number and
sample interval.
At the end of each drill rod, the drill string
is cleaned by blowing down with air to
remove any clay and silt potentially built
up in the sample pipes and cyclone.
Logging
Sub-sampling
techniques
and sample
preparation
Whether core and chip
samples have been
geologically and
geotechnically logged to a
level of detail to support
appropriate Mineral
Resource estimation,
mining studies and
metallurgical studies.
Whether logging is
qualitative or quantitative
in nature. Core (or
costean, channel, etc)
photography.
The total length and
percentage of the relevant
intersections logged.
If core, whether cut or
sawn and whether
quarter, half or all cores
taken.
If non-core, whether
riffled, tube sampled,
rotary split, etc and
whether sampled wet or
dry.
For all sample types, the
nature, quality, and
appropriateness of the
sample preparation
technique.
Quality control
procedures adopted for
all sub-sampling stages to
maximise representivity
of samples.
Measures taken to ensure
that the sampling is
representative of the insitu material collected,
including for instance
results for field
duplicate/second-half
•
No relationship exists between sample
recovery and grade.
•
All aircore samples collected in calico bags
were logged for lithology, colour, cement
type, hardness, percentage rock estimate,
sorting, and any relevant comments such as
moisture, sample condition, or vegetation.
Geological logging data for all drill holes
was qualitatively logged onto Microsoft
Excel spreadsheet using a Panasonic
Toughbook with validation rules built into
the spreadsheet including specific dropdown menus for each variable. The data
was uploaded to the Australian Rare
Earths Azure Data Studio database.
• Every drill hole was logged in full and
logging was undertaken with reference to a
drilling template with codes prescribed and
guidance to ensure consistent and
systematic data collection
• 1 m aircore sample interval were
homogenised within the cyclone and the
rotary splitter was set to an approximate
20% split producing around 1.5 kg sample
for each metre interval.
• The 1.5 kg sample was collected in a prenumbered calico bag and the 80% (5 kg to
8 kg) portion was collected in plastic UV
bags labelled with hole identity and
interval.
• Duplicates were generally taken within the
clay lithologies above the basement as this is
the likely zone of REE enrichment. These
duplicate samples were normally collected
by using a second calico bag and placing it
under the rotary splitter collecting a 20%
split but due to the difficulties of placing a
second calico bag under the rotary splitter
during sample collection, some duplicates
were collected by hand from the plastic UV
bags which captured the other 80% of the
material recovered from any particular
interval.
• The material in the plastic UV bags was
mixed up and every attempt to take as
representative sample of the material as
•
sampling.
Whether sample sizes are
appropriate to the grain
size of the material being
sampled.
Quality of
assay data
and
laboratory
tests
The nature, quality and
appropriateness of the
assaying and laboratory
procedures used and
whether the technique is
considered partial or total.
For geophysical tools,
spectrometers, handheld
XRF instruments, etc, the
parameters used in
determining the analysis
including instrument make
and model, reading times,
calibrations factors
applied and their
derivation, etc.
possible by hand was made and then placed
in a pre-numbered calico bag.
• The 1.5 kg sample collected in the calico
bag was logged by the geologist onsite. The
logged samples were placed in polyweave
bags and sent to Naracoorte base at the
end of each day. The polyweave bags were
then placed on pallets and dispatched to
Bureau Veritas laboratory in Adelaide in
Bulka Bags.
• The remaining 80% split from the aircore
interval was stored for future reference.
• Field duplicates of all the samples were
completed at a frequency of 1 in 34 samples.
Field standards were inserted into the
sample sequence at a frequency of 1:57.
Standard reference Material (SRM) samples
were inserted into the sample batches at a
frequency rate of 1 per 10 samples by the
laboratory and a repeat sample was taken at
a rate of 1 per 21 samples.
• A rig geologist oversaw the sampling and
logging process while a second geologist
selected samples for analysis based on the
logging descriptions and Pxrf analysis. Clay
rich sample and those adjacent to the
limestone basement contact were selected
for assay. REEs are known to be contained
within the clay component of the sediment
package based on analysis of XRF data and
previous exploration work.
• The detailed geological logging of samples
provides lithology (clay component) and
proximity to the limestone basement which
is sufficient for the purpose of determining
the mineralised zone.
• The 1.5 kg aircore samples were assayed by
Bureau Veritas laboratory in Wingfield,
Adelaide, South Australia, which is
considered the Primary laboratory.
• The samples were initially oven dried at 105
degrees Celsius for 24 hours. Samples were
secondary crushed to 3 mm fraction and the
weight recorded. The sample was then
pulverised to 90% passing 75 µm. Excess
residue was maintained for storage while
the rest of the sample placed in 8x4 packets
Nature of quality control
procedures adopted (e.g.,
standards, blanks,
duplicates, external
laboratory checks) and
whether acceptable levels
of accuracy (i.e., lack of
bias) and precision have
been established.
•
•
•
•
•
•
•
Verification
of sampling
and sent to the central weighing laboratory.
All weighed samples were then analysed
using the Multiple Elements Fusion/Mixed
Acid Digest analytical method;
ICP Scan (Mixed Acid Digest – Lithium
Borate Fusion) Samples are digested using
a mixed acid digest and also fused with
Lithium Borate to ensure all elements are
brought into solution. The digests are then
analysed for the following elements
(detection Limits shown): Al (100) As (1) Ba
(1) Be (0.5) Ca(100) Ce (0.1) Co (1) Cr (10)
Dy (0.05) Er (0.05) Eu(0.05) Fe(100) Gd
(0.2) Ho (0.02) K (100) La (0.5) Lu (0.02) Mg
(100) Mn (2) Na (100) Nd (0.05) Ni (2) Pr
(0.2) S (50) Sc (1) Si (100) Sm(0.05) Sr (0.5)
Th (0.1) Ti (50) Tm (0.2) U (0.1) V (5) Y (0.1)
Yb (0.05) Zr (1)
Field duplicates were collected and
submitted at a frequency of 1 per 34
samples.
Bureau Veritas completed its own internal
QA/QC checks that included a Laboratory
repeat every 21st sample and a standard
reference sample every 9th sample prior to
the results being released.
Analysis of QA/QC samples show the
laboratory data to be of acceptable
accuracy and precision;
Australian Rare Earths submitted field
standards at a frequency of 1:57 samples.
Australian Rare Earths requested BV insert
blank washes at a frequency of 1:40
samples. These blank washes were
inserted in the sample sequence behind
samples which were thought to be
mineralized to ensure that no
contamination from higher grade samples
was occurring. Frequency of blank samples
totaled 1 in 24 samples.
The adopted QA/QC protocols are acceptable for
this stage of test work. The sample preparation
and assay techniques used are industry standard
and provide a total analysis.
The verification of
• All results are checked by the company’s
significant intersections by
Technical Director.
and assaying
either independent or
alternative company
personnel.
The use of twinned holes.
Documentation of primary
data, data entry
procedures, data
verification, data storage
(physical and electronic)
protocols.
Discuss any adjustment to
assay data.
•
•
•
•
•
•
•
•
Field based geological logging for drill holes
was entered directly into an Excel
spreadsheet format with validation rules
built into the spreadsheet including specific
drop-down menus for each variable. This
digital data was then uploaded to the
Australian Rare Earths Azure Data Studio
database.
Assay data was received in digital format
from the laboratory and was uploaded
Australian Rare Earths Azure Data Studio
database.
Field and laboratory duplicate data pairs of
each batch are plotted to identify potential
quality control issues.
Standard Reference Material sample results
are checked from each sample batch to
ensure they are within tolerance (<3SD) and
that there is no bias.
The field and laboratory data was exported
and imported into Datamine by IHC Robbins
which is appropriate for this stage in the
program. Data validation criteria are
included to check for overlapping sample
intervals, end of hole match between
‘Lithology’, ‘Sample’, ‘Survey’ files and
other common errors.
Assay data yielding elemental
concentrations for rare earths (REE) within
t
Share your feedback
Discover