Corporate Presentation - July 2025
Released
Released
Announcement PDF
Securing Australia’s
Clean Energy Transition Metals
Corporate Presentation
July 2025
ASX: AR3
Australian Rare Earths Presentation
Disclaimer & Important Information
Australian Rare Earths Limited (‘AR3’ of the ‘Company’) does not purport to give financial or investment advice. No account has been taken of the objectives, financial situation or needs of any recipient of this document. The opinions
and recommendations in this presentation are not intended to represent recommendations of uncertainties, to particular persons. This presentation does not constitute financial product advice.
To the fullest extent permitted by law, the Company and its associates or any of its directors, agents, officers or employees do not make any representations or warranties, express or implied, as to the accuracy or completeness of any
information, statements, opinions, estimates, forecasts or other representations contained in this presentation. No responsibility or liability for any errors or omissions from this presentation arising out of negligence or otherwise is
accepted.
This document has been prepared as a summary only and does not contain all information about the Company’s assets and liabilities, financial position and prospects and the rights and liabilities attaching to the Company’s
securities. This document should be read in conjunction with any other reports and information provided or released by the Company.
Some of the statements contained in this presentation are forward-looking statements. Forward looking statements include but are not limited to, statements concerning estimates of expected costs, statements relating to the
advancement of the Company’s investments and other statements which are not historical facts. Although the Company believes that its expectations reflected in the forward-looking statements are reasonable, such statements
involve risk and uncertainties, and no assurance can be given that actual results will be consistent with these forward-looking statements. Various factors could cause actual results to differ from these forward-looking statements
include the potential that the Company’s projects may experience technical, geological, metallurgical and mechanical problems, changes in product prices and other risks not anticipated by the Company or disclosed in the Company’s
published material.
Information in this Presentation is extracted from the ASX announcements titled:
Competent Persons Statement
• “Strategic addition to AR3’s Overland Project with uranium potential from surface” 10
July 2025;
The information in this report that relates to Exploration results and the Exploration Target is based on information compiled by
• “AR3 expands Overland Project to unlock newly identified Cu-Au targets and additional
Australian Rare Earths Limited and reviewed by Mr. Rick Pobjoy who is the Chief Technical Officer of the Company and a member of the
uranium prospects” 11 June 2025;
Australian Institute of Mining and Metallurgy (AusIMM). Mr. Pobjoy has sufficient experience that is relevant to the style of
• “Overland Project drilling identifies roll front uranium signature” 26 May 2025;
mineralisation, the type of deposit under consideration and to the activities undertaken to qualify as a Competent person as defined in
• “Sheer Gold Farm-in Agreement moves to completion for tenement transfer” 24 April
the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr. Pobjoy
2025;
consents to the inclusion in this report of the matters based on this information in the form and context in which it appears.
• “AR3 confirms near surface Uranium discovery at overland” 19 March 2025;
The Company confirms that it is not aware of any new information or data that materially affects the Mineral Resource estimate and
• “Overland Progress Update” released 21 January 2025;
Exploration Target information included in the relevant market announcement (ASX announcement dated 30 September 2024) and that
• “AR3 awarded $5M Federal Government grant for Koppamurra Project” released 6
all material assumptions and technical parameters underpinning the estimates in the relevant market announcement (ASX
December 2024;
announcement dated 30 September 2024) continue to apply and have not materially changed. The company confirms that the form and
• “AR3 expands Overland Uranium Project with strategic farm-in agreement” released 19
context in which the Competent Person’s findings are presented have not been materially modified from the original market
November 2024;
announcement (ASX announcement dated 30 September 2024).
• “Significant Resource Expansion at Koppamurra” released 30 September 2024;
• “AR3 progresses Uranium strategy with Exploration License Application at Hamilton
The information in this report that relates to metallurgical results is based on information compiled by Australian Rare Earths Limited
Creek” released 23 July 2024;
and reviewed by Mr. Jon Weir who is the Technical Director of Wallbridge Gilbert Aztec and a member of the Australian Institute of
•
“AR3 Advances Uranium Exploration with New License Application at Triggs Bore”
Mining and Metallurgy (AusIMM). Mr. Weir has sufficient experience that is relevant to the metallurgical testing which was undertaken to
released 16 July 2024; and
qualify as a Competent Person as defined in the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral
• “Flowsheet Update for Koppamurra Outlines Low Capital Development Pathway”
Resources and Ore Reserves”. Mr. Weir consents to the inclusion in this report of the matters based on this information in the form and
released 2 April 2024.
context in which it appears.
All announcements are available on www.ar3.com.au.
AR3 Corporate Presentation | July 2025
2
Advancing a multi-generational Rare Earths Province and
unlocking exploration potential at Overland
Koppamurra: Strategic Rare Earth Project with time to market edge
•
1
•
•
Uranium Discovery Potential
2
3
AR3 Corporate Presentation | July 2025
Strategically important source of light and heavy Rare Earths, with favourable capex profile and lower
technical risk providing time-to-market edge.
Advancing the project through pre-feasibility with $5m Australian Government co-funding grant at a time the
market is eager for new supply options.
Supported by Neo Performance Materials, AR3 shareholder and global advanced industrial materials
manufacturer with established rare earth supply chain pathway to global markets.
•
•
•
Initial drilling shows strong potential for In-Situ Recovery (ISR) amenable, sedimentary-hosted uranium deposits.
Additional Uranium model with discovery of widespread near surface calcrete-hosted Uranium occurrence.
Large scale exploration on multiple targets identified and underway.
Growth Focused and Well-funded
•
•
Experienced team with proven capabilities in asset acquisition, exploration and development.
Recently completed Rights Issue securing additional $3.6m funding with 93% raised through existing shareholders.
3
Diversified Project Portfolio
Rare Earths
Uranium
Massie Creek
Oaky Valley
Sandy Tate
Forty Mile Scrub
Copper - Gold
Dalrymple
Hamilton Creek
Triggs Bore
Overland
Koppamurra
Koppamurra: Government supported REE Development
Project
• $5 million Australian government grant funding
• Australia’s most advanced ionic clay-hosted rare-earth
project, located in South Australia and Victoria
• 236Mt @ 748ppm TREO1 with significant upside, including
68Mt @ >1000ppm TREO
Overland: Early movers with untapped Exploration Potential
• ~7,700km2 of prospective uranium tenure in South
Australia
• Delemarian region considered prospective and
underexplored terrane for copper and gold
• Active drill program resuming late July 2025
Expansive Exploration Portfolio
• Exploration projects across South Australia and Queensland
1 Mineral Resource estimate of 236Mt at 748ppm, comprises of 0.7Mt at 813ppm Measured, 112Mt at 750ppm Indicated and 123Mt at 747ppm Inferred TREO
AR3 Corporate Presentation | July 2025
4
Team & Corporate Snapshot
Experienced team and strong backing
Angus Barker
Independent Chairman
Over 30 years of professional experience, including at
top-tier global investment banks and as a senior
adviser to Australian Government Ministers in key
economic portfolios.
• Deputy Chair of Vulcan Energy Resources
• Director of WAM Capital
Travis Beinke
Managing Director & CEO
Over 20 years’ experience with both Australian
and internationally listed resource companies.
Broad range of strategic, commercial, finance
and business development experience,
particularly in exploration and growth projects.
• Previous roles with OZ Minerals, Ensign
Energy Services and ExxonMobil Australia
Pauline Carr
Independent Non-executive
Director
Experienced company director in compliance,
governance and risk over 30 years in resources
sector.
• Chancellor of Adelaide University
• Chair of National Pharmacies
• NED Highfield Resources
• Previous roles with Normandy Mining and
Newmont
Rick Pobjoy
Chief Technical Officer & CoFounder of AR3
Geologist with more 25 years’ experience in the
mining and minerals exploration industry.
• Extensive experience in definition, development,
and production from sedimentary hosted
deposits.
• Successful project delivery for Uranium and
Mineral Sands explorers, developers and
producers.
Capital Structure
Share Price (21 July 2025)
Shares on issue
Options @ $0.10 expiring 30 March 20291
Other Options2
Market Capitalisation
ASX ticker: AR3
$0.10
212.0m
26.5m
12.1m
$21.2m
Liquidity
Cash (30 June 2025)
Grant funds to be received (2025/26)3
Available Funding
$5.10m
$4.25m
$9.35m
Distribution of shareholders
19%
2%
70%
9%
●
●
●
●
Directors, Management & Co-Founders
NEO Performance Materials
Acorn Capital
Other
1 If the Shares of the Company close at or above $0.15 for twenty (20) consecutive trading days on the ASX, then the Company may, in its absolute discretion, elect to accelerate the expiry date of the Options by issuing a news release announcing the accelerated Option term, pursuant to which the
Options will expire on the 30th calendar day after the date of such news release. 2 Options ranging from $0.37 to $0.60. 3 Balance of $5m International Partnerships in Critical Minerals matched grant funding to be received during 2025/26.
AR3 Corporate Presentation | July 2025
5
Koppamurra
Rare Earths
Project
Leading the development of a
multi-generational rare earths
project in Australia
AR3 Corporate Presentation | July 2025
6
Critical Minerals dominating recent news coverage
New Rare Earths supply in demand!
AR3 Corporate Presentation | July 2025
7
Koppamurra: Overview
Location
Koppamurra Resource Growth1
~300km SE of Adelaide, in South Australia and Victoria
250
7,400sqm
Ownership
100%
Partner
NEO (Non-binding MOU for 50% offtake of stage 1)
Commodity
Valuable Magnet Rare Earth ~25% of TREO with all four key
REEs present including strategically valuable heavy REE’s
Dysprosium & Terbium ~3%
Stage
Exploration & Development
Drilling
~64,000 metres drilled since 2021
Resource
236Mt @ 748ppm TREO1 - Includes higher-grade subset of
68Mt grading over 1000ppm
Growth
Potential
Compelling scope for ongoing Mineral Resource growth with
mineralisation open to the north and south and the current
236 Mt Mineral Resource covers only ~2% of total
Koppamurra tenure
Inferred
Indicated
Measured
200
Million Tonnes
Scale/Size
150
100
50
0
Apr-21
Jul-22
Mar-23
Sep-23
Sep-24
1 Mineral Resource estimate of 236Mt at 748ppm, comprises of 0.7Mt at 813ppm Measured, 112Mt at 750ppm Indicated and 123Mt at 747ppm Inferred TREO
AR3 Corporate Presentation | July 2025
8
Koppamurra: Sustainable development pathway
Progressive Heap
Leach and Rapid
Rehabilitation
KOPPAMURRA CONCEPTUAL PROJECT FLOW SHEET
Scalable and efficient
with staged satellite
developments
Less water and
energy usage
Favorable capex and
lower technical risk
Enables rapid,
progressive land
rehabilitation
AR3 Corporate Presentation | July 2025
9
Mine design incorporating progressive land rehabilitation
Successful Bulk Sample Pit and Rehabilitation Program
April 2022
AR3 Corporate Presentation | July 2025
September 2022
August 2024
10
Koppamurra: Light & Heavy Rare Earths project with time-to-market edge
$5m Australian Government grant for International
Partnerships in Critical Minerals supporting:
• Metallurgical test work
• Completion of a PFS
• Submission of an initial Mining Lease Application and
• Building/operating demonstration plant
AR3 to invest $5m matched funding over 2025 and 2026:
• Every dollar AR3 invest can unlock more – multiplied by
grant co-funding and boosted by R&D tax incentive
Mine to Magnet Pathway for the Koppamurra Project1
Neo Performance Materials:
• Canadian technical partner and potential offtake for
Koppamurra production
Providing mine supply into an international supply chain:
• Koppamurra can feed an existing downstream supply chain
1 Mine to Magnet Pathway illustrated is contingent on Neo and AR3 reaching binding agreements
AR3 Corporate Presentation | July 2025
11
Koppamurra: Advancing metallurgical test work
IBC with dripper system applying lixiviant for leaching
•
•
~3 tonne bulk leach at Brisbane Met Labs
Optimising rare earth recovery and water
recycling
AR3 Corporate Presentation | July 2025
Bulk sample being prepared for Bulk Leach test
• ANSTO conducting impurity removal and rare earth
precipitation test work
• Results of test work to inform design aspects for PFS
12
Uranium
Untapped uranium
exploration potential
~7700km2
AR3 Corporate Presentation | July 2025
13
Overland Uranium Project: Overview
Location
South Australia,~200km south of Honeymoon Mine
Scale/Size
~7,700km2
Ownership
~6,700km2 100% and ~1,000km2 (EL6678) 100%
sedimentary hosted uranium rights
Commodity
Uranium, Copper, Gold
Stage
Greenfields exploration targeting In-Situ Recovery (ISR)
amenable and near surface calcrete-hosted uranium deposits
Drilling
Active drill program following up new surficial uranium targets
and deeper ISR-amendable targets
Initial Results
ISR-amenable geological model confirmed with a north/south
trending palaeovalley setting defined, providing for the
accumulation of thick sequences of prospective stratigraphy;
interbedded sands, clays and lignite horizons;
Widespread near surface calcrete hosted uranium
mineralisation
Growth Potential
Frontier uranium region, limited prior exploration
Multiple high-priority targets to test
Cu-Au potential in basement rocks complementing ongoing
sedimentary hosted uranium exploration
AR3 Corporate Presentation | July 2025
FIGURE BEING
UPDATED FOR NEW
ELA’s
Overland project area
14
Strategic addition at Overland: Walk up drill ready targets with
gamma anomalism from surface
Significant gamma anomalism
identified from surface in historic
drilling data review
Large target area with three historic
drill holes spanning ~7km
Potential for widespread near surface
calcrete hosted uranium
mineralisation
New target area is ~50km south of
AR3’s near surface calcrete hosted
occurrence
Rapid testing of new target area
EL6895: Schematic showing geology and natural gamma traces from 1981 drillholes, extracted from open file
envelope ENV3957 pages 364, 365 and 369.
AR3 Corporate Presentation | July 2025
15
Overland Project: Untapped Uranium exploration potential
Overland Project area geology and structure (faulting) with priority targets numbered
East west cross section through OV100 with roll front signature identified in basal sands
ISR amenable targets:
• Compelling evidence supporting AR3’s geological model for ISR amenable deposits; connection to uranium rich source rocks,
permeable sediments as pathways and hosts, effective reductants acting as traps for uranium precipitation
• Roll front target identified, follow up drilling Q3’2025; Multiple targets remain untested
AR3 Corporate Presentation | July 2025
16
Overland Project: Unlocking
newly identified Cu-Au targets
Strategic review reveals Cu-Au potential in basement rocks complementing
ongoing sedimentary hosted uranium exploration:
• Project area expanded by ~2,000km2 to now total ~7,700km2
• New ground prospective for uranium and Cu-Au targets
Prospective and underexplored terrane within Tier-1 mining jurisdiction of
South Australia:
• Delamerian region emerging as highly prospective for multiple mineralised
styles including porphyry, skarn, orogenic gold, VMS and sediment-hosted
mineralisation
Strong geological credentials:
• Region contains Cu-Au Cu-Mo and polymetallic systems, with analogues to
Tier 1 discoveries such as Rio Tinto’s Winu and Newmont’s Cadia Hill
Over 20 untested basement targets identified:
• To be tested alongside ongoing uranium exploration program
AR3 Corporate Presentation | July 2025
AR3 initial basement Targets (TMI magnetics background and geology)
17
Development Timeline & Next Steps
Advancing a multi-generational Rare Earths Province and unlocking potential at Overland
Koppamurra Rare Earth Project
•
•
•
•
Rare earth recovery results from ~3 tonne bulk leach test work
Mixed Rare Earth Carbonate (MREC) production, impurity removal and water
recycling test work
Completion of PFS
Leverage opportunities of increasing intensity in geo-political landscape
Uranium Discovery Potential
•
•
•
•
Drilling to resume late July 2025
Immediately following up roll front signature identified in May’25
Rapid testing of newly acquired tenure with uranium potential from surface
Expand drilling to untested high priority targets
Cu-Au Exploration
•
•
AR3 Corporate Presentation | July 2025
Reprocessing AEM data for depth and conductor targeting of Cu-Au
basement targets
Expanding basement sampling during the upcoming uranium drilling
program including follow up to anomalous Cu, Mo and Bi intersected in
drill holes OV002 and OV011
18
Appendix:
Additional Projects
Further exploration upside across
South Australia and Queensland
AR3 Corporate Presentation | July 2025
19
Uranium: Triggs Bore
South Australia
Project Name
Triggs Bore
Location
Callabonna Sub-basin
Scale/Size
~250km2
Ownership
100%
Commodity
Uranium
Stage
Exploration
Potential
Indications of uranium mineralisation previously
discovered in 2011 but remain untested. Triggs Bore is
hosted within the Eyre Formation sediments, a known
uranium-bearing formation, also host to nearby Four Mile,
Beverley and Honeymoon uranium deposits.
AR3 Corporate Presentation | July 2025
20
Uranium: Hamilton Creek
South Australia
Project Name
Hamilton Creek
Location
Callabonna Sub-basin
Scale/Size
~200km2
Ownership
100%
Commodity
Uranium
Stage
Exploration
Potential
Indications of anomalous uranium mineralisation from
historic reporting. Hamilton Creek is hosted within the
Namba Formation sediments, same formation as the
nearby Beverley uranium deposit.
AR3 Corporate Presentation | July 2025
21
Rare Earths: Dalrymple
Queensland
Project Name
Dalrymple
Location
Queensland
Scale/Size
~1,200km2
Ownership
100%
Commodity
REE
Stage
Exploration
Next steps
On-ground exploration
assessment
AR3 Corporate Presentation | July 2025
22
Rare Earths: Kennedy
Queensland
Project Name
Kennedy Province
Location
Queensland
Scale/Size
~1,100km2
Ownership
100%
Commodity
REE
Stage
Exploration
Next steps
On-ground exploration
assessment
AR3 Corporate Presentation | July 2025
23
Appendix:
Resources and exploration
target
AR3 Corporate Presentation | July 2025
24
Koppamurra: Mineral Resource & Exploration Target
Koppamurra Mineral Resource Estimate – September 2024
Magnet Rare Earths
JORC
Tonnes
TREO
Pr6O11
Nd2O3
Tb4O7
Dy2O3
Category
Mt
ppm
ppm
% TREO
ppm
% TREO
ppm
% TREO
ppm
% TREO
Measured
0.7
813
37
4.6
140
17.3
3.8
0.5
21
2.6
Indicated
112
750
34
4.6
132
17.6
3.6
0.5
20
2.7
Inferred
123
747
35
4.6
132
17.6
3.4
0.5
19
2.6
Total
236
748
35
4.6
132
17.6
3.5
0.5
20
2.6
Koppamurra Exploration Target – September 2024
Magnet Rare Earths
Tonnes
TREO
Pr6O11
Nd2O3
Tb4O7
Dy2O3
Category
Mt
ppm
ppm
% TREO
ppm
% TREO
ppm
% TREO
ppm
% TREO
Exploration
Target Total
5003,200
520 780
20-40
3.8-5.1
90140
17-18
3-4
0.5–0.6
10-20
1.9-2.6
The potential quantity and grade of the Exploration Target is conceptual in nature, as there has been
insufficient exploration undertaken to estimate a Mineral Resource and it is uncertain if further exploration will
result in the estimation of a Mineral Resource.
Koppamurra Resource areas and Categories
AR3 Corporate Presentation | July 2025
25
Securing Australia’s
Energy Transition Metals
for a Sustainable Future
Contact us
Travis Beinke,
Managing Director & CEO
+1 300 646 100
AR3 Corporate Presentation | July 2025